Construction Project for Implementation of Bus Terminal in Benešov
Hájek, Tomáš ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this diploma thesis is construction project for implementation of bus terminal in Benešov. This thesis contains technical report, construction study of main technological stages, supply management for selected technological processes, technical report of site facilities including drawings, construction machinery and equipment for selected technological processes, technological specification for execution of earthworks SO01 & SO02, technological specification for execution of foundations SO01 & SO02, control and test plan for execution of earthworks, control and test plan for execution of foundations, safety and health protection plan for selected technological processes, construction site noise study and a construction study of reconstruction of roads in the terminal area.
REDUCING THE VALUE OF CONSTRUCTION NOISE BY MODELING THE PRODUCTION AREA OF CONSTRUCTION SITE AND BY ADJUSTING THE TECHNOLOGICAL PROCEDURES DURING CONSTRUCTION
Kantová, Radka ; Makýš,, Peter (referee) ; Mohelníková, Jitka (referee) ; Henková, Svatava (advisor)
This doctoral thesis focuses on noise generated during construction. It defines the legislative and physical aspects of this topic. It determines heavy machinery as noise source and categorizes them by their usage in construction technologies. It collects source data of the machinery noises which can be further used in prognostic models. It analyses the level of construction noise which can impact the nearby residential areas and offers methodology for modelling and designing the possible arrangements for the noise reduction. It defines partial effects of the construction site which are significant for the noise spreading. It establishes their role in the value of acoustic pressure level of the noise affecting the façade of the considered building. With the data collection and with case study verification it offers a prepared work tool which can be easily used to predict noise levels on construction sites and can be applied in the early constructions preparations. The structure of this thesis is planned for possible usage as university textbook or study support.
Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.
Koláček, Ivo ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
Bilogy park Brno, Civil technical project
Kroutil, Karel ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
The diploma thesis deals with construction technological project of a Biology park Brno. The thesis contains time and financial plan, itemized budget of main object, technical report, site equipment, safety and healt care policy and machine assembly, noise study, environment . The thesis focuses on building waterproof concrete construction and reinforced concrete monolithic structures. Thesis includes technological prescription and control and test plan for mentioned constructional phases.
Apartment Building in Stromovka - Building Technology Project
Kralovič, Antonín ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of the diploma thesis is to describe the building-technological project for the construction of a residential building in Hradec Králové. The apartment building is five-storey and has 33 residential units. The work is systematically divided into smaller logical units. First, the project is described in a technical report, followed by studies of the realization of the main building. After the description of the project, an indicative time and financial plan is prepared, which is refined by the schedule and budget itemization of the main building. An integral part of the design is mechanical engineering, staff balance and site construction equipment. To ensure the maximum quality of the work carried out, the technical regulations contain the control and test plans. In order to determine the supply possibilities of the construction it was necessary to carry out an assessment of the wider transport relations around the building.
Effect of Business Activity on the Environment
Pustka, Ondřej ; Ing.Daniel Borski,Ph.D (referee) ; Kocmanová, Alena (advisor)
In my thesis I try to review general affect of business on the environment. Thesis focuses on available resources focused on protection of the environment, mainly those connected with waste management. The case study of Nehlsen Třinec, s.r.o. company is the part of thesis as well. It results in suggestion of improvement of investment in the company. Detailed analysis of the company is a base of this study.
The complex of residential buildings, Praha - Jarov, civil technological project
Komenda, Tomáš ; Hrůza,, Jaroslav (referee) ; Kovářová, Barbora (advisor)
The goal of this diploma thesis is to create a building technology project for construction of 4 flat houses within stage 3a. of the building project „Green town of Prague – Jarov, phase II“. The flat houses are in two pairs interconnected by basement, each is a 7 floor high reinforced concrete building with flat roof and is functionally connected to others by a terrace garden system. This document focuses on organisation and preparation of the construction. It includes building site equipment, cost calculation for setting up and servicing of the building site with graphical illustrations for selected construction phases. Additionally a detailed time schedule was created with a proposal for stream construction of the reinforced concrete scelet and lining in the pairs of interconnected buildings. A realization study of the main technological phases was also prepared. The diploma thesis covers in detail construction of reinforced steel scelet and circumferential casing including a layer of contact insulation system. A blueprint of formwork for walls and ceiling is included in the manual for construction of reinforced steel scelet. On these particular actions probationary and control plans were added. The required machinery set with detailed placement was also drafted. An itemized budget for the main building was prepared as well. Attached to this document is a detailed manual on how to use housing units including repairs and revisions plan for next 30 years. Part of this diploma thesis is also a detailed study covering the construction in relation to the surronding living and educational areas.
Preparing for execution of a construction
Gajdoš, Filip ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
In my diploma´s thesis I occupy with selected parts of the technological prepariation of building proceses of administrative and production hall in Holešov. There are detailed follow up the technological rules for ground work and foundation. Furthermore , the technological requirements for reinforced concrate assembled skeleton. My diploma´s thesis also includes the project of the construction site facilities, machinery, construction budget, the technology solution including CTP, the time and financial planning, noise studies, fire safety of the building, evaluation of roof cladding.
Hospital in Pardubice - preparation and organization of extension Pavilion
Záleský, Martin ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
This thesis discusses the preparation and organization of the extension construction of multi-purpose Pavilion in Pardubice hospital. The thesis contains a summary accompanying technical report, technical regulations for CFA piles and contact insulation system. Those 3 regulations have developed inspection and test plans. Next parts od the work are time schedule and an itemized budget of the pavilion, time and financial plan of the whole building, Occupational safety and health instructions, environmental issues during the construction, design of mechanical set, system of construction site project. There is also noise study made during the implementation of the construction of the pavilion. Finally there is also situation of construction, CFA pilot implementation scheme and contract.