Selected Parts of Construction-Technological Project of Substation 110 kV Ostava Hrabová
Škrobánková, Zuzana ; Bravenec, Roman (referee) ; Mohapl, Martin (advisor)
This thesis deals with construction and technological project of 110 kV substation in Ostrava Hrabová. Includes design mechanical assembly, time and financial plan, technological studies during the construction of the main building structure, schedule, project site equipment, budgets and other documents that are required to correct the construction.

Private clinic, Slavkov u Brna
Ševela, Zdeněk ; Klubal, Tomáš (referee) ; Brzoň, Roman (advisor)
The topic of this Master‘s thesis is an elaboration of project documentation of construction part for a project of new building private clinic in Slavkov u Brna. Object is composed of three floors. In the first floor there are chemist and X-ray. In the second and third floor there are doctor's surgery. Construction system is transverse wall. The ceilings are made of prestressed panels. The roof of object is single-layer flat roof.

Constructive technological project of block of flats in Brno
Szmeková, Michaela ; Čech, David (referee) ; Diaz, Yvetta (advisor)
Final thesis deals with the structural and technological project of block of flats in Brno. Deal with division building construction and engineering structures, machineries, project schedule and financial plan. It is further focused on the rough construction of the main building structure, where processing technological study of the construction, project schedule, the project site equipment, budget and other documents that are necessary for the correct realization of construction.

Construction technology project of multifunctional building in the Česká Skalice
Hanuš, Jakub ; Henek, Vladan (referee) ; Novotný, Michal (advisor)
This master´s thesis discusses the construction technological project of the newly built multifunctional building in the Česká Skalice focusing on the selected technological phases. Speciffically it is the implementation of the earthworks and the bricklaying using the TRESK brick system. For these technological steps are processed all documents that is necessary for their implementation. There are detailed elaboration of the timescales and financial plans for construction of the main building structure in this project.

CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING
Mrózek, Jakub ; Bravenec, Roman (referee) ; Mohapl, Martin (advisor)
In my master thesis I deal with construction and technological solutions of Residental House Hubertus in Karlova Studánka. Thesis mainly includes technical report of the construction technology project, coordination situation of building with relationships to the wider transportation routes, the implementation study of the main technological stages of the main building structure, technical report of building-site equipment with drawings of building-site equipment, design of the main building machines and mechanisms, project calculation budget, calculation of construction by the building structures, time schedule, technological prescription ceiling slab with inspection and test plan.

Construction technological project of Biogas station Pikárec
Sklenářová, Ludmila ; Čech, David (referee) ; Diaz, Yvetta (advisor)
The thesis titled Biogas Plant Pikárec deals with the building technology preparation and implementation of the construction. Construction of a biogas plant consists of six main buildings which will be implemented in the area of agricultural cooperatives during its operation. All buildings will be designed as reinforced concrete. The aim of the thesis is the design time, financial and material resources to ensure the smooth progress of construction.

Assessment and Economic Return on Investment Project
Nyklová, Petra ; Vaňková, Lucie (referee) ; Kocourková, Gabriela (advisor)
This work deals with an assessment and economic return on investment project. The theoretical part describes price formats, methods of drawing up an object budget, a payback period, costs and revenues matters and ways of financing construction projects. The practical part of this work focuses on acquiring costs and revenues emerged during the construction implementation and the use of the building. Costs incurred during the implementation will be obtained by means of itemized and general construction budget. Having obtained these values, there will be carried out a profit and loss account, from which a payback period will then be calculated.

Royal Crystal trade centre - construction technology project
Novák, Jiří ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
This master's thesis deals with the construction technology project solution of the Trade centre building. This thesis consists of a comprehensive elaborate project of implementation including the schedule and calculation, two technological regulations of operations, main mechanisms and risks connected with the realization itself. Logistics of resources, construction side and procedures needed for realization are processed as well.

Business Incubator
Jeřábek, Martin ; Pirochta, Josef (referee) ; Králová, Zuzana (advisor)
In my diploma thesis I designed a new office building in Brno. The building will function as a business incubator, so it will provide space for developing companies for favorable lease terms. While projecting the building I took into consideration future changes in dispositions. Part of the building has a basement and it has one underground and four aboveground floors. The building is designed as monolithic ferroconcrete unit and it has reinforcing perimeter walls with unit core. The ceiling is made of monolithic ferroconcrete panels. The building has flat rooftops, ventilated facade and is based on piles.

Commercial building
Tejkl, Jakub ; Mocová, Pavla (referee) ; Utíkalová, Ivana (advisor)
The master thesis „ Administrative object“ is processed as a project for building construction. The object is situated on plots No. 651/1 and 652/1 in the Brno. The building is designed to use for administration, 1 st floor is used for gallery, sweet-shop, newspaper shop and garrage. The house hasn´t cellar, it has 3 aboveground floors. The skeleton of construction is designed from reinforced concrete, walls are from brick-walled POROTHERM. Roofing is designed from reinforced concrete board. The building will be roofed with arched trusses with metal roofing. In 2nd and 3rd floor are situated offices, meeting rooms, conference halls and social background. The work includes the study of building and heat considerations.