National Repository of Grey Literature 60 records found  beginprevious31 - 40nextend  jump to record: Search took 0.01 seconds. 
Construction technological project of the selected building
Soldánová, Veronika ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The goal of my diploma thesis is to process selected parts of the construction tech-nology project of the polyclinic Lanskroun. It is a new building that will have one partial underground floor, three aboveground floors and an attic. The work consists of several chapters in which can be found a technical report to the construction technology project, the coordination situation of the construction with solution of traffic signage, time and financial plan of the objects and their calculation according to THU, study of main technological stages, construction site equipment, design of main construction machinery with their deployment, time schedule of the main bui-lding construction, itemized budget. Also, the technological regulations, quality con-trol and testing plan for monolithic structures.
Preparation of realization of University dormitory BUT
Götz, Libor ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is to prepare the realization of college dormitories for the Brno University of Technology. A technical docummentation for the construction-technological project, transport routes design, time and financial schedule, budget according to technical – economic indicators, main technological stages implementation study, construction project, main construction machines proposal, time plan, and an item budget of the main construction object is prepared. An integral part of this thesis are the technological regulations, including control and test plans. And at the end the LEED certification and the health and safety plan were prepared.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Construction technology project for a hotel in Giant Mountains
Pozler, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.
Apartment building in Ivančice - building technology project
Šagát, Pavel ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The goal of this thesis is a construction technological project of an apartment building in Ivančice. The work focuses on the graphic visualisation of earth and foundation works progress and consequently on the item budget and timetable for construction works. Technological regulation for earth and foundation works with the changes on foundation constructions, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms are also part of this work. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
Construction-technological project of Integrated Rescue System Station
Šmíd, Radim ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.
Koláček, Ivo ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
Preparation of the construction of the Active Center in Ratíškovice
Prágr, Michal ; Patloka, Jiří (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is preparation of realization of Active center. Diploma thesis includes technological regulation for concrete constructions and the roof, project of machine set, the inspecting and testing plans, plan of BOZP, the budget and the time table of main construction object. I alson did the project of the building site facilities and drawings needed.
Implementation of Production Hall in Hulín
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected processes of the main building object, a design of the main building machines including an assessment of a lifting mechanism, a technological regulation for assembling of a prefabricated skeleton including a health and a safety plan, a technological regulation for a wire-concrete floor realization including a quality control and a health and a safety plan, a project of site equipment, a control and a test plan for prefabricated skeleton assembly. And also a budget item for selected technological processes, an assembly scheme for the prefabricated skeleton and a schemes´composition of the wire-concrete floor.
Apartment Building in Stromovka - Building Technology Project
Kralovič, Antonín ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of the diploma thesis is to describe the building-technological project for the construction of a residential building in Hradec Králové. The apartment building is five-storey and has 33 residential units. The work is systematically divided into smaller logical units. First, the project is described in a technical report, followed by studies of the realization of the main building. After the description of the project, an indicative time and financial plan is prepared, which is refined by the schedule and budget itemization of the main building. An integral part of the design is mechanical engineering, staff balance and site construction equipment. To ensure the maximum quality of the work carried out, the technical regulations contain the control and test plans. In order to determine the supply possibilities of the construction it was necessary to carry out an assessment of the wider transport relations around the building.

National Repository of Grey Literature : 60 records found   beginprevious31 - 40nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.