National Repository of Grey Literature 55 records found  beginprevious21 - 30nextend  jump to record: Search took 0.01 seconds. 
Residential Building, civil technical projekt.
Pokorný, Jan ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
In my diploma thesis, I focus on a building technology project of an apartment house in Prostějov. My work aims to design an optimal construction process. The thesis consists of a technical report, coordination drawing, project of the building site, building machines and mechanisms, time schedule and financial plan, description of technological process of the ventilated facade and of the monolithic reinforced concrete vertical structures including quality controls and testing plans. The process of making ventilated facade in comparison with the ETICS system is presented in more detail. Because the construction works take place in a city centre, the study of noise on the construction site is included as well.
Preparing for execution of a construction
Gajdoš, Filip ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
In my diploma´s thesis I occupy with selected parts of the technological prepariation of building proceses of administrative and production hall in Holešov. There are detailed follow up the technological rules for ground work and foundation. Furthermore , the technological requirements for reinforced concrate assembled skeleton. My diploma´s thesis also includes the project of the construction site facilities, machinery, construction budget, the technology solution including CTP, the time and financial planning, noise studies, fire safety of the building, evaluation of roof cladding.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
CONSTRUCTION TECHNOLOGICAL PROJECT OF APARTMENT BUILDING IN OHRAZENICE
Zdražil, Luboš ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The master´s thesis describes the realization of new apartment building in Ohrazenice. The thesis contains a technical report of the construction-technical project, studies of relatization of the main technological stages and report of the building equipment. I designed the main construction machines and mechanisms. An optimized budget with a bill of quantitiesand detailed construction schedule and a graph of staff needs is prepared for the SO01 building. The thesis also deals with technology of drilled piles and prepared a technological regulativ, schedule of occupational health and safety and a control and test plan.
Construction preparation of a residential building Kluchova - Brno, Nový Lískovec
Jokl, Lukáš ; Šlanhof, Jiří (referee) ; Průcha, Aleš (advisor)
The diploma thesis is dedicated to the project of preparing the realization of an apartment building on Kluchova Street in the Brno-Nový Lískovec district. The content of this work is the technological regulations for underground construction carried out using the so-called white bath and vegetation roof, for which an inspection and test plan, a time and financial plan-object plan, a time plan for rough construction and an itemized budget for rough construction are drawn up. It also includes the coordination situation with broader relationships of transport routes, the design of main machine assemblies, construction site equipment, principles of construction organization and safety and health protection at work with a focus on the main risks arising from construction. As part of the work, several appendices are developed, such as an assessment of the main lifting device, a proposal for LEED measures, an assessment of the necessary costs for the establishment and operation of the site equipment, a noise study of the site equipment and an assessment of the white tub/lost formwork structure.
Bilogy park Brno, Civil technical project
Kroutil, Karel ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
The diploma thesis deals with construction technological project of a Biology park Brno. The thesis contains time and financial plan, itemized budget of main object, technical report, site equipment, safety and healt care policy and machine assembly, noise study, environment . The thesis focuses on building waterproof concrete construction and reinforced concrete monolithic structures. Thesis includes technological prescription and control and test plan for mentioned constructional phases.
Warehouse Greenhouse Březhrad - construction technology project
Žitek, Jan ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the development of a construction and project for the construction of the building of the Greenhouse warehouse with administration in the village of Březhrad. The thesis includes a technical report for the construction and technology project, coordination of the traffic situation including the design of transport routes and a study of the implementation of the main technological stages. In addition, the calculation of the construction, the object time and financial plan and the time plan of the main construction object are addressed. The work also includes a list of works, supplies and services with a statement of quantities for the main construction object. In addition, the work deals with the design of the site facilities including the technical report and the design of the main machinery assemblies. A technological regulation for the implementation of the deep foundation of the building including a control test plan, a noise study and a specialised chapter dealing with the assessment of options for the implementation of retaining walls have also been prepared.
Preparation for the implementation of a sports hall at the elementary school in Rajhrad
Kryštof, Filip ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The subject of my diploma thesis is preparation for the implementation of sports hall at the elementary school in Rajhrad. The aim of this thesis is to elaborate construction technology plan for the main building marked SO.01 – Sports hall, focusing on time management, technology, and resources of implementation. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, technological regulations, inspection and testing plan for the implementation of precast concrete frame. Also elaborated are calculation of construction according to THU, an occupational health and safety plan, a noise study and comparative study for a lifting mechanism.
Training ice stadium with accommodation Lhota u Vsetína – construction technology project
Marčík, Filip ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the development of a construction technology project for the construction of the training winter stadium with accommodation in Lhota u Vsetína. As part of this work, a technical report on the construction technology project, a study of the implementation of the main technological stages and the coordination situation of the construction, including solutions for the transport of key elements, are prepared. The work also deals first with the object time and financial plan of the construction, and then also the time plan of the main construction object and the plan for the provision of material resources for the complete stage of the construction, including the itemized budget. In a separate chapter, the work deals with the design of construction site equipment and the related technical report. Last but not least, the design of the main machine assemblies, the technological regulation and control test plan for the execution of drilled piles, a noise study and a specialized chapter dealing with winter measures during concreting, including their financial comparison, are dealt with here.
Construction technological project of the annex of the school gymnasium in the town of Hrob
Smrčka, Adam ; Jílek, Jan (referee) ; Mohapl, Martin (advisor)
This diploma thesis deals with the construction technological project of the annex of the school gymnasium in the town of Hrob in the Ústí region. The work contains a technical report of the construction technological project, a coordination situation of the building with the solution of wider relations of transport routes to the construction site, time and financial construction plan for construction objects and a study of the implementation of the main technological stages. For the main construction object, an itemized budget for the shell construction, a graph of the need of workers and machines, and a detailed time schedule were also worked out. The work also includes a construction site equipment project, including drawing documentation for the stages of earthworks and shell construction, and the design of the main construction machinery. As part of the technological regulation, the work deals with the assembly of the prefabricated reinforced concrete skeleton of the gymnasium, including a detailed quality control and test plan for this process. Last, but not least, the work contains a safety and health protection plan for working on the construction site, a noise study, a calculation of the entire building according to THU, a schema of the assembly of the skeleton by a mobile crane including its assessment and a schema of the reach of the truck concrete pump.

National Repository of Grey Literature : 55 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.