National Repository of Grey Literature 27 records found  beginprevious18 - 27  jump to record: Search took 0.01 seconds. 
Construction-technological project of administrative building Dukelská
Lidmila, Jan ; Liška, Pavel (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is a construction technology project for an office building Dukelská in Brno. The content of the work is a technical report to the construction technology project, design of transport solutions, time and financial evaluation of the construction, project for a construction site equipment, design of a machine assemblies. For the selected construction phase a technological specification and check and test plan is designed. The work also deals with environmental and safety risks, draft contract for work and alternative technologies of vertical structures.
Apartment complex Netroufalky, building F - building technology project
Čermák, Jan ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for an apartment building in the Campus residential complex II, situated in Brno – Bohunice. Specifically, an apartment building (object F, designated SO 204) was selected, on which monolithic structures of the substructure will be solved. The content of the work is a technical report to the construction technology project, evaluation of transport routes, elaboration of technological regulations for selected technological stages, time schedule for the selected stage and partial detailed section of a typical floor. Furthermore, the construction site equipment with drawing and text part, control and test plan, itemized budget with bill of quantities, design of machine assemblies and work safety solutions are elaborated.
CONSTRUCTION AND TECHNOLOGICAL PROJECT OF THE BASE OF THE EMERGENCY MEDICAL SERVICE IN ZABREH NA MORAVE
Tůma, František ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
This diploma thesis deals with the construction project of the outbound base of the emergency medical service in Zabreh na Morave. More specifically, this thesis deals with the study of the development of the building, the technological regulation for the flat roof, and the subsequent chapters - design and assessment of the lifting mechanism, optimal design of the building site, timetable, itemized budget, control and test plan, etc. An interesting point is the simulation of the construction, where a 3D model and a video are created. The thesis is based on a borrowed documentation of the project.
Construction technology project of C building of Technological park in Brno
Bradáčová, Eliška ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
Theme of the diploma thesis is realisation of an administrative building in the area of Czech Technological Park Brno. Thesis contains of technical report of the technological project, situation of a place near the building site, the plan of traffic, for the objects time and financial plan, proposal of the main mechanisms, time schedule and partial time schedule for monolithic constructions. In the theses is also project of a construction site. In the thesis there also is a project of a construction site and also a monolithic constructions control and test plan. Then there is an Itemized budget for the building and a bill of quantities. Proposal of an area road constructed by the object is made as a specialization.
Implementation of the gross overhead construction of the storage hall in Hradec Králové
Štěpánek, Michal ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The bachelor thesis is aimed at the construction and technological solution of the rough top structure of the storage hall in Hradec Králové. Bachelor thesis contains technological background for the execution of rough construction. This work aims to solve problems with the procedures for the implementation of masonry and prefabricated structures. I focused on the part of the hall that will serve for administration and I devised the implementation procedure and the time consuming. As the project documentation did not have anything to do with the ceiling 1.NP, I had to solve the project site first and then I did the implementation technology. I also compared the two lifting devices in terms of economic and time requirements. Another objective was to solve the transport of individual building materials on site. The proposed solution is based on my personal experience with the implementation and consultation of leading experts in the field. The aim of this work is to propose an optimal course of implementation of the storage hall.
Project
Řezníčková, Tereza ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The diploma thesis deals with construction technological project of Central zone technology park in Brno. The thesis involves engineering report, coordinate situation, time and financial plan, study of the main technological stages, project of site equipment, design of machine formativ, time schedule, itemized budget with bill of quantities, technological prescription of monolithic reinforced concrete frame, kontrol and test plan, sefety and health care policy and structural details.
Selected Parts of Building and Technological Project of Administrative and Manufacturing Hall Hydraulics s.r.o.
Kousal, Tomáš ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The master thesis deals with a conception and realization of a constructional and technological project of new manufacturing and administrative hall Hydraulics s.r.o. The thesis studies the realization of the major technological constructing stages of the building. It also covers projects of the construction site, the time schedule, the plan of the main building machines and mechanisms and the budget. Furthermore, the master thesis solves technological regulations for foundations made with bored piles, the budget according to THU including the check plan, the test plan and the safety plan. Also, the assessment of the construction composition is attached.
Construction technology project of The polyfunctional house Eastgate, Brno
Brabec, Josef ; Čech, Václav (referee) ; Venkrbec, Václav (advisor)
The aim of this diploma thesis is the building-technological solutions of gross structure Multifunctional file EASTGATE Brno. This multi-functional file is divided into objects Z and Y. This thesis solves the construction of gross substructure and gross superstructure object Z and gross substructure object Y. It deals with the most optimal propsal of technological procedures, working machines, itemized budget, time schedule, check and test plans, equipment of construction site, assessment of lifting mechanism and last but not least closer transport relations. The thesis is prepared on the basis of technical documents submitted by the designer.
Technological study of execution of riding compound in Lazce
Kochaňová, Renata ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
This bachelor thesis deals with structural and technological study of Lazce riding grounds in Olomouc concentrating on their rough structure execution. The work is based on working drawings. The area will be used for riding horses training, races and competitions and general public relaxation. The building is situated in Lazce and Hejčín town districts. It matches the local buildings thanks to its appeareance. This area is made up of a bed and breakfast hostel, horse boxes and a riding school which is the main concern of this work. The riding school is designed as a three-naval steel skeleton with a fit-in restaurant, a kitchen on the second floor, two shops and stores and support room for the kitchen on the first floor. There will be a construction time plan, budget, machinery design, technical report of construction equipment, check and test plan, safety at work.
Training Centre in Zlín, technological phase shell construction
Výstup, Petr ; Henková, Svatava (referee) ; Vlčková, Jitka Laura (advisor)
The Bacherol theses objective is conception of the technological phase of upper shell building of the training centre in Zlin which is supposed to serve for research and training of workers who are involved in thermal construction engineering branch. The work describes the shell building realization which is built of a lot of different materials if we consider the small size of the construction. Technological report, machinery list, wider relation situation, building site equipment with on record drawings, work safety, check and test plan, partial budget and schedule of construction are included.

National Repository of Grey Literature : 27 records found   beginprevious18 - 27  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.