National Repository of Grey Literature 55 records found  beginprevious16 - 25nextend  jump to record: Search took 0.02 seconds. 
Preparation for the implementation of the Bučovice Terrace Residence
Loukota, Michal ; Rotrekl, Ivo (referee) ; Kantová, Radka (advisor)
The subject of the diploma thesis is the implementation of apartment buildings in Bučovice, specifically focusing on the apartment building "X". It deals with a construction technology project. Its content is a technical report on the construction technology project, traffic relations for the transport of materials and machines to the construction site, technical report on the construction site equipment, construction technology study, machine design, elaboration of technological regulation for monolithic ceiling construction and infiltration tank. The chapters on safety and health protection at work on the construction site, the LEED certification system and a noise study for earthworks are also elaborated. Several diagrams of the procedure of execution of individual constructions, time and financial plan, selected details are elaborated. The thesis contains 30 appendices.
Home for seniors
Koláříková, Eliška ; Pilný, Ondřej (referee) ; Berková, Petra (advisor)
The aim of the master´s thesis is to design a Residential care home as smart building. It is situated in the centre of Křenovice near Brno. The master´s thesis is divided into three parts, first part presents design documentation, second part is focused on building services and the final part presents noise control in building. Residential care house is designed as two-storey building without basement with flat roof. On the first floor there is utility area for senior house and healthcare facility and on the second floor there are flats for seniors. Residential care house is built on footing. Load-bearing and non-load-bearing walls are designed from hollow bricks type THERM. External walls are insulated with mineral wool. The roofing of residential care house is made up of extensive green roof. The building services of the building includes two ground-water heat pumps with boreholes for heating and cooling, photovoltaic panels, HVAC, hot water cylinder and rainwater storage tank. The final part is focused on noise control in building. It is about acoustic in construction. Noise study is also included.
Construction technological project of construction of an administrative building with garages
Hrabovský, Lukáš ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of an administrative building with garages in Prague. The building is located in an enclosed area in the Prague-Veleslavín district. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, a technological regulation for the implementation of monolithic ceiling structures, a quality control and testing plan for monolithic ceiling structures. The diploma thesis also includes the calculation of construction according to THU, a occupational health and safety plan, concreting economics, a noise study, a selected points LEED certification and a budget with site equipment costs.
Kindergarten Kuřim - construction technology project
Kurka, Jan ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the thesis is the solution of selected parts of the construction technology project of the construction of a kindergarten in Kuřim on Hybešova Street. It is a single-story brick building with a flat roof with a green roof. In my work I solve the study of the main technological stages, technological regulations for the monolithic ceiling structure and the green roof of the Smart Roof Solutions system together with inspection and test plans, design of the main construction machines, time and a financial plan for the main building of the kindergarten, the building time and financial plan for the entire construction plan, the balance of workers and the deployment of construction machinery and the construction site equipment project. Then I add a noise study, assessment of selected LEED 2009 Core & Shell credits, design of the TOPSAFE restraint system, health and safety plan, documentation of the green roof of the Smart Roof Solutions system and a search on the topic of green roofs.
Preparation of the implementation of the construction of the Tescoma administrative building in Zlín
Žůrková, Dominika ; Řihák, Pavel (referee) ; Kantová, Radka (advisor)
The aim of my diploma thesis is preparation for the construction of the Tescoma office building in Zlín. This thesis includes a technical report for the construction and technological project, a study of the realization of the main technological stages, a coordinating traffic situation and a plan of the main transport routes. The thesis is also focused on the time and financial plan of the object, detailed time schedule of the main object, itemized budget for selected construction processes, plan for securing machines and prefabricated elements. Other separate chapters contain technological regulations for micro piling and assembly of prefabricated elements with an inspection and test plan. There is proposed the main construction machines and mechanisms, engineering report and drawings of the site equipment within the realization of the main construction object. The thesis concludes with a noise study, a health and safety plan and the composition of the floor and the pitched roof.
Residential Building, civil technical projekt.
Pokorný, Jan ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
In my diploma thesis, I focus on a building technology project of an apartment house in Prostějov. My work aims to design an optimal construction process. The thesis consists of a technical report, coordination drawing, project of the building site, building machines and mechanisms, time schedule and financial plan, description of technological process of the ventilated facade and of the monolithic reinforced concrete vertical structures including quality controls and testing plans. The process of making ventilated facade in comparison with the ETICS system is presented in more detail. Because the construction works take place in a city centre, the study of noise on the construction site is included as well.
Preparing for execution of a construction
Gajdoš, Filip ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
In my diploma´s thesis I occupy with selected parts of the technological prepariation of building proceses of administrative and production hall in Holešov. There are detailed follow up the technological rules for ground work and foundation. Furthermore , the technological requirements for reinforced concrate assembled skeleton. My diploma´s thesis also includes the project of the construction site facilities, machinery, construction budget, the technology solution including CTP, the time and financial planning, noise studies, fire safety of the building, evaluation of roof cladding.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
CONSTRUCTION TECHNOLOGICAL PROJECT OF APARTMENT BUILDING IN OHRAZENICE
Zdražil, Luboš ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The master´s thesis describes the realization of new apartment building in Ohrazenice. The thesis contains a technical report of the construction-technical project, studies of relatization of the main technological stages and report of the building equipment. I designed the main construction machines and mechanisms. An optimized budget with a bill of quantitiesand detailed construction schedule and a graph of staff needs is prepared for the SO01 building. The thesis also deals with technology of drilled piles and prepared a technological regulativ, schedule of occupational health and safety and a control and test plan.
Construction preparation of a residential building Kluchova - Brno, Nový Lískovec
Jokl, Lukáš ; Šlanhof, Jiří (referee) ; Průcha, Aleš (advisor)
The diploma thesis is dedicated to the project of preparing the realization of an apartment building on Kluchova Street in the Brno-Nový Lískovec district. The content of this work is the technological regulations for underground construction carried out using the so-called white bath and vegetation roof, for which an inspection and test plan, a time and financial plan-object plan, a time plan for rough construction and an itemized budget for rough construction are drawn up. It also includes the coordination situation with broader relationships of transport routes, the design of main machine assemblies, construction site equipment, principles of construction organization and safety and health protection at work with a focus on the main risks arising from construction. As part of the work, several appendices are developed, such as an assessment of the main lifting device, a proposal for LEED measures, an assessment of the necessary costs for the establishment and operation of the site equipment, a noise study of the site equipment and an assessment of the white tub/lost formwork structure.

National Repository of Grey Literature : 55 records found   beginprevious16 - 25nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.