National Repository of Grey Literature 1,491 records found  beginprevious1482 - 1491  jump to record: Search took 0.01 seconds. 
Residential house Jihlava-technological phase of construction site
Novák, Jan ; Mesiarkin, Jan (referee) ; Henková, Svatava (advisor)
The subject of my bachelor´s thesis is to implement the rough upper construction of residential house in Jihlava. Processing Technology in detail the rules for building and assembly of prefabricated panels SPIROLL. It also contains a technical report, technical report building equipment, building equipment, mechanical assembly design, safety and environmental protection, inspection and test plan, schedule, itemized budget and the export ceiling panels SPIROLL.
Residential building Šemberova, Brno - The solution phase realization of the envelope
Novák, Martin ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This Bachelor's thesis deals with the execution of the envelope residential building Šemberova. It concerns realization of the ventilated façade. In this Bachelor's thesis, the building technological project contains primarily a model of the building site accessories, the technological process, the time schedule, the financial heftiness, the machines formation, the check and the test plan, the occupational safety, for these technological phases.
The terrace house Omice - gross bottom construction
Němec, Lukáš ; Klempa, Lukáš (referee) ; Biely, Boris (advisor)
This bachelor thesis is focused on the technological stage of the lower gross building terraced house in Omice. Part of the thesis is technical report the work site facilities, technical regulations, inspection and test plans, reports the machine design, plan of safety and protection of health and environmental, budget and timetable.
Construction of a multipurpose building superstructure
Holubová, Jolana ; Věrný, Luboš (referee) ; Kantová, Radka (advisor)
The main construction work is subject to technological solution phase construction of a multipurpose building superstructure in Lanškroun. The study deals with the use different types of structures and economic terms, technological specifications, occupational safety, quality of the implementation and time plan of the building. The basis for the development of the project was the partial implementing documentation of the building.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Solving the phase of floors of an apartment house in Brno
Meluzínová, Lucie ; Čech, Josef (referee) ; Hrazdil, Václav (advisor)
Subject of this thesis is the phase of floors in apartment house in Brno. This thesis contains technical reports, statement measurement, technological specification, site equipment, scheduling, mechanical assembly design, monitoring and test plans, budgeting, safety work and environmental protection.
Proposal of Site Facilities
Nečková, Hana ; Gerat, Ivo (referee) ; Nováková, Jana (advisor)
Site facilities is a collection of all objects a equipment on site for economical construction and assembling works and satisfy social and hygienic needs of workers. The main aim of this bachelor thesis is to design site facilities for skyscraper AZ Tower in Brno and use the newly acquired knowledge in the processing of the theoretical part of this thesis.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.
Ski resort Červená Voda - rough substructure
Vasserbauer, Jiří ; Rychtecký, Martin (referee) ; Biely, Boris (advisor)
The subject of the thesis is the solution of new building construction and technological preparation of the ski resort in Červená Voda. This preparation includes the processing of technological regulation for reinforced concrete construction, design of building equipment, time schedule, itemized budget, design of machinery confuguration, inspection and test plan, environmental plan and work safety plan.
Construction and Technological Solutions Structural System of the Building for Fitness, Rehabilitation and Accomodation in Štíty
Revús, Adam ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
The Bachelor´s thesis pursues the decisive issues of supporting structure of the building for fitness, rehabilitation and accommodation in Štíty. The thesis seeks to find the building – technological optimum for main construction works. The thesis includes technical report of the object, technological prescription, equipment construction, machinery , budget, timetable,inspection and test plan, work safety.

National Repository of Grey Literature : 1,491 records found   beginprevious1482 - 1491  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.