National Repository of Grey Literature 147 records found  beginprevious126 - 135nextend  jump to record: Search took 0.00 seconds. 
Traffic Connection Searching in Transport Schedules
Žižka, Ondřej ; Bidlo, Michal (referee) ; Jaroš, Jiří (advisor)
Everyday need of modern society is a mass personal transit on a regular basis. For this purpose, mass transit systems exist which obey aforethought schedule. This thesis' goal is to examine the means of automatic search of connections from one place to another, implement such search, and to advance the search algorithm using the soft-computing paradigms. Minor goal would be a research of SQL language procedural capabilities, which could support mass pseudo-parallel computations.
New construction of block of apartments A1, at Slavkov u Brna - Preparation of the realization construction
Stuchlík, Jaroslav ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This Thesis deals with the organization of realization of the residential building A1 Slavkov u Brna. Thesis solves mainly technological process of realization of the main object. The thesis aims to develop a time schedule of execution, usage of mechanisms timetable, material resources, technological regulations, inspection and test plans. The annex also solved graphically construction site facility set up and its modifications during execution depending on different type of works. This Thesis is based on realization project provided by the realization company and with consent of project designer.
Construction technological project of road and a bridge across of motorway
Schindler, Marek ; Klimszová, Alžběta (referee) ; Diaz, Yvetta (advisor)
This Master’s thesis deals with a construction project and a technical solution of a realignment of a stretch of a road and a bridge construction, which converts this road over the motorway D47. The aim of the thesis, is to plan the construction works in a way that ensures that they are carried out in an optimal manner. The work concentrates on the solution of the site preparation and the characteristics of the surrounding conditions of the building site. Furthermore, it deals with the time and financial plan for the implementation of individual objects and the associated number of deployment of employees and machinery. The building works consist of two construction sites of the same importance, for the road this involves a study of major technological stages of implementation and a inspection and test plan of the road construction. For the bridge, it provides a processed itemized budget, schedule of work performed, technology standard and a plan for securing material resources.
Selected parts of Construction-Technological Project - LOGISTICS CENTER HEMAT
Valouch, Ondřej ; Venkrbec, Václav (referee) ; Čech, David (advisor)
The subject of my thesis are selected parts of construction technology project – construction of the logistics center Hemat in Ostrava. This thesis solves technological regulations for foundations and installation of the main steel structure. It also includes a technical report, technical report site equipment, suitable choice of construction machinery, timetables, itemized budget, inspection and test plan, occupational safety, dealing with traffic routes, situation of site equipment.
CONSTRUCTION AND TECHNOLOGICAL PROJECT OF RESIDENTIAL BUILDING IN BRNO
Hoffmann, Ondřej ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
Final thesis deals with solution of technological project of apartment block. Thesis contains technological prescription, control and test plans and budget for stage of ground works, shell construction and roofing. Roofing system design, timetables and plan of resources are also included.
Development of the Construction Order during its Realization
Hort, Eva ; Kocanda,, Pavel (referee) ; Vítková, Eva (advisor)
The Master´s thesis deals with the development of the construction order during its realization. This thesis contains the necessary theoretical inputs that are focused on explaining the concepts of construction company, construction order and progress in building industry. It is based on theoretical inputs that have been taken to a case study that deals with the development of selected construction order during its life stage - realization. Case study contains the characteristics of the selected construction company, financial analysis, development process of construction order and draft of the measures to improve the processing of construction order.
Shopping centre Holešov – the building technological preparation
Lech, Martin ; Rychtecký, Martin (referee) ; Biely, Boris (advisor)
This Master’s thesis deals with the building technological preparation of the building a shopping centre in Holešov. This thesis includes a technical report of building technological projekt, a technological prescription of montage a skeleton of hall with inspecting and testing plan and with a drawings of working procedure of montage, a technical report of building equipment with drawings, a plan of mechanical assembly with a timetable, a report of health and safety on the building site, a report of input of building on environment, description of transport relations with drawings, a timetable of a skeleton of hall, timetable of all the building, a result of workers, a plan of finance, a budget of construction of hall and a calculation of all the building.
Constructive-technological project of building New flats - Bystrice on Paseky
Lisztwanová, Mariola ; Ing.Michał Krzyžanek (referee) ; Diaz, Yvetta (advisor)
The subject of the thesis is the Constructive-Technological Project of building New Flats – Bystrice on Paseky. The building will be realized at the building plot of land within a developed area. The attempt is to leave the calm rural character of the surroundings undisturbed. The bulding is supposed to merge with the surroundings. Concerned are two apartment buildings with grand plans of 18 x 36 meters, disposing of three above-ground floors, no cellar, and a panel roof. In order to make the building merge with the surroundings, a wooden external cladding has been projected. Thus, the building is supposed to give the impression as if it was constructed of wood.
Constructive-technological project of a new building University of Veterinary and Pharmaceutical Sciences Brno
Gwoździová, Joanna ; Ing.Bogdan Iwanuszek (referee) ; Diaz, Yvetta (advisor)
The subject of the thesis is the construction-technological project New flats of Study and Information Centre of Faculty of Veterinary Medicine in Brno. The building will offer a modern study environment for students. There will be a space for the central library as well as the study centre in the SIC. Also, the university archive and museum depository of the Institute of the History of Veterinary Medicine and Pharmacy will take place there. The building will be constituted of three five-floor blocks with overall groundplan size 72,40 x 30,50 m. The construction system is comprised by a ferroconcrete frame. The block C (the northern one) has one underground floor. At the level of the first uderground floor, the particular blocks are interconnected by an installation corridor. At the level of the second and third above-ground floor, the blocks are linked up with ferroconcrete connecting bridges. In the case of the fourth above-ground floor, the blocks are bridged by a dimensional steel construction which at the same time forms a roof and lifts the glassed frontage along the perimeter of the building. The fifth above-ground floor disposes of recessive steel extenstions of the engine rooms of air conditioning system.
RECONSTRUCTION OF THE CENTRAL BUILDING PLAVEČ – PREPARATION AND ORGANIZATION OF CONSTRUCTION
Černý, Karel ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
This thesis deals with reconstruction of the home for the elderly Plaveč main building. These reconstruction is primarily interior renovation, the rooms of clients and staff facilities, but also the surrounding of the building. All work will be in full operation. Consideration of this factor in the organization of construction is the main subject of this thesis, which shall include traffic contexts, costing, budget, time schedule, equipment of construction site, construction machinery, technology procedure, occupational safety and resources.

National Repository of Grey Literature : 147 records found   beginprevious126 - 135nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.