National Repository of Grey Literature 176 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Analysis of the possibilities of linking building and economic software and software for technical drawing
Domanský, Vojtěch ; Aigel, Petr (referee) ; Výskala, Miloslav (advisor)
The main topic of the thesis is the analysis of the possibilities of linking building and economic software and software for technical drawing, in which BIM models are created, in order to achieve automatization of BIM model budgeting. The introductory, theoretical part defines the area of solved problematics in a broader background and the context of the problem. The overarching theme is BIM. Therefore, the basics and principles of this method, its fundamental aspects and current implementation within the Czech Republic are solved. The following chapters deal with standard budgeting procedures in the Czech construction market. The specifics of classical methods and their shortcomings in the context of contemporary construction are described. In the following part of the thesis the BIM budgeting concept, its vision and related aspects are discussed in more detail. The actual draft of the solution of interconnection of price systems and software, in which the BIM model is created, with orientation on valuation automation, is presented in the final, practical part of this thesis. Requirements for solution are defined and the procedure of its creation is described. Finally, the solution is tested and evaluated.
Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory
Štěpánek, Michal ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
Residential house Ševětín - technological phase coarse upper construction
Marek, Miroslav ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This bachelor´s thesis is focused on building technology upper stage of construction site of a residential building in Ševětín. It deals with technical Reports, technological methods of construction, the report also contains technical Reporst of building equipment, schedule, design of mechanical assembly, inspection and test plan, safety, and finally comparing different ways of walling.
The implementation phase of gross upper structure of a department store
Jahodová, Martina ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
This bachelor’s thesis comprises realization of a technical construction phase of the upper department store in Valašské Meziříčí. Thesis contents of a technological procedure of installing a load-bearing construction and roofing of the building, a construction site technical report, a concept of mechanical assemblies, an inspection and test plan, a statement of measures, a bill of quantities, a timetable, an occupational safety and environmental protection.
Administrative center Hodonin - building and technological project
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
The gross superstructure of the apartment building
Hoferek, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
This bachelor’s work deals with the realization of the rough upper construction of the appartment block. The aim was to elaborate the technological regulations, to specify the mechanization for the set technological phase, the occupational safety, the quality of the implementation and the total duration of the phase of the rough upper construction with respect to the economic point of view. The basis for the development of the project was the partial implementing documentation of the building.
Technological phase gross superstructure assembled house
Stehlík, Jakub ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
Subject of this bachelor´s thesis is the upper gross production technology of family house in Bílovice nad Svitavou. This work contain technical reports, site family house, device of construction site, technological provisions, overal results, timetable, machine set design, monitoring and test plan, occupational safety.
Technological phase of the upper structure of the polyfunctional building in Žilina
Papučík, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is the processing of the construction technological stage of the superstructure of the polyfunctional building in Žilina. The bachelor's thesis is a technical report of a building-technological project, a time schedule for the construction of a given technological stage, a situation of a construction site, a construction organization for a given technological phase, a solution of transport routes to a construction site, a gross building budget, a technical regulation for masonry and monolithic ceiling constructions, occupational safety and health, design of machine assembly, control test plan for masonry and prefabricated ceiling constructions, comparison of cranes.
CONSTRUCTION OF A DEPARTMENT STORE IN MLADÁ BOLESAV - SOLUTION OF GROSS SUBSTRUCTURE
Škopík, Michal ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This bachelor's thesis deals with solution of gross substructure a department store in Mladá Boleslav. In this thesis is solved a technological specification for implementation of earthworks and implementation of foundations and vertical supporting constructions of gross substructure. More specifically deals with traffic situation around building, time schedule of works, proposal of machine assemblies, ensuring qualitative requirements, safety at work and budget. This thesis is very interesting about solution of construction organization, because this construction is in the middle of housing estate. The basis for this thesis was a drawing documentation for realization of this construction.
Preparation for rough superstructure of residential building Jižní svahy
Gajdoš, Nikola ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The main construction work is subject to technological solution vertical and horizontal constructions of residential building Jižní svahy. Bachelor´s thesis solves construction progress itself, used technologies and ensuring required conditions for safe and stepless constructing. The basis for the development of the project was the partial implementing documentation of the building.

National Repository of Grey Literature : 176 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.