National Repository of Grey Literature 48 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Shell of the building of the Academy in Prague Dejvice - building technology project
Šorm, Petr ; Rychtecký, Martin (referee) ; Biely, Boris (advisor)
Building Technology project deals with the processing of the necessary documents and documentation for implementation shell of the building of the Academy of Sciences in Prague Dejvice. At the beginning of the technical report on the building technology project, which provides basic information about the construction. Content is the solution of the building construction site by the financial, structural and technological and time. Construction technology solution is based on monolithic work.
Realization of technological steps gross supreme office building
Havlík, Ondřej ; Kučírek, Jaroslav (referee) ; Kantová, Radka (advisor)
This Bachelor thesis describes the construction and technological processing of a fourth-floor building superstructure of the Plemenáři Brno building on Optátova 37, Brno. Discussing the building's detailed construction specifications built in stages with POROTHERM system and subsequently describing the technological application of the wooden roof trusses and large panelization of the sheet metal roofing. The full content of the Bachelor thesis includes the construction technological specification, construction equipment, planning involved to excavate the ground for technological stage brickwork, budgets, scheduling, the inspection plan and recommendations for compliance, and the roofing construction plan.
Construction Project - Implementation of Storage Hall in Zlín
Voráčová, Tereza ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on the solution of the building technology project of storage hall in Zlín. This master’s thesis includes engineering report, studies of major technological stages, solution of transport routes, project of site equipment, design of major machines and mechanisms, technological regulations for steel hall and steel fibre reinforced concrete floor, time schedule, control and test plans for steel hall and steel fibre reinforced concrete floor, budget, time and financial plan, assembly schemes for steel hall and floor assembly.
Multifunctional building in Nový Lískovec - realization of the substructure
Máčal, Filip ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of this bachelor thesis is a technological project of the realization of the substructure of a polyfunctional building in Nový Lískovec. This bachelor thesis contains transport solutions to the construction site, site facilities, machine assembly, technology prescription of the system „white tank“, control and test plan. The bachelor thesis also contains the work safety problems, the building budget, the time plan, the environmental protection.
Preparation for residential buildings Prosek
Ešpandr, Pavel ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The thesis deals with the solution of the technologies of rough constructions. The content of this work of realization of a residential building in Prague. For the diploma thesis I elaborated a technological regulation, a timetable, a control and a test plan, as well as health and safety.
Residential House in Hrace Králové - substructural waterproofing solution
Šorm, Petr ; Šimáčková, Martina (referee) ; Novotný, Michal (advisor)
The subject of the thesis is the technological phase of the residential house´s lower construction redevelopment in Hradec Králové. With the redevelopment of lower construction is related underpinning of the residential house´s walls, the elevator shaft sealing by jet grouting method and waterproofing solutions of the lower construction. The documents for this technological phase are processed, it´s necessary for their realization
Realization of the substructure of a residential building Luže
Kerhartová, Monika ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The content of bachelor´s thesis is the construction and technological project a residentialbuilding Luže. The project includes technological regulations for earthwork and foundation constructions. Regulations are supplemented by testing and inspection plans, appropriate machinery and equipment assembly site. It is addressed scheduling, the budget of the construction stages - earthwork and foundation construction and safety.
Realization of coarse superstructure of residential house in Novy Jicin
Jurečka, Matěj ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
The aim of this bachelor thesis is the design and description of the technologically selected stage of the rough top of the apartment building in Nový Jičín. The content is the processing of the technical report of the solved object. Further elaboration of technological regulations for masonry of vertical supporting structures and ceiling structures. A control and test plan is also being developed for these constructions. There is a design of a machine assembly along with a solution for safety and health at work. In addition, the traffic situation is solved in connection with the construction site equipment. For the selected stage of this building, an item budget and a time schedule are processed. The thesis is designed with respect to the economic and time-consuming construction.
SPORTS RELAXING CENTRUM Nový Lískovec-SELECTED PARTS OF THE CTP
Venkrbec, Václav ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The master's thesis is solving a build-up technology of a polyfunctional building construction with a badminton hall. It is a prefabricated skeleton in combination with ceramic walls.
SUBSTRUCTURE OF A TRAINING CENTER OF COMPANY BATIST
Možíš, Jan ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
The subject of my bachelor thesis is the construction-technological project of a training center of company Batist, Červený Kostelec. Thesis is focused on the most optimal technological procedures of demolition and groundworks along with base designs substructures. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be comparison of the financial foundation with the original design of reinforced concrete structures on foundation along with compaction of the substrate, the design of the building foundation on bored piles.

National Repository of Grey Literature : 48 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.