Woman´s Clothing Factory
Kadlecová, Sylva ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The bachelor thesis " WOMAN´S CLOTHING FACTORY" is processed in the form of architectural and engineering studies and project documentation for construction of this building. It contains all the requirements needed in accordance with valid regulations. The designed object is located in the city district Brno - Zidenice, on the Rokytova street. The whole building is supposed to cause a compact impression. The building is designed for the fashion brand Miu Miu. This fact reflects the whole concept of the project. On one hand, the building is supposed to be simple, with the elements of minimalism, variety of colors and contrast, but on the other hand, an elegant form of this building is preserved. This building is a factory building, focusing on the women's designer clothing. The object is orientated south-west, it is set into a deeply sloping terrain and it has three floors. Its character is monolithic reinforced concrete frame, which is complemented with masonry filling Ytong. The building is divided into several operating parts. The manufacturing, storage and technical plants are located on the ground floor. The air conditioning and office facilities are located on the second floor. The catering plant, together with social and sanitary facilities and administrative part are located on the third floor.
Production hall with an administrative part in Ústí n Orlicí - Hylváty, civil technological project
Dobrovská, Monika ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for the building evelope and pattern moving mechanical assemblies. The subject, which I deal with in this thesis, is in the field of constructions- selected details of the building envelope preparation.
Production hall Edscha in Hradec Henry - construction and technology project
Zadák, Petr ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
This thesis addresses the technological project of building a production hall in EDSCHA Henry Hradec. For the construction project will be developed technological studies major technological implementation stages, summary technical report, technological specification for installation of a steel frame and cladding halls, safety measures in the construction, inspection and test plan for the assembly skeleton, time and financial plan for the whole building, budget object SO01 production hall with an administrative extension and extension of production facilities.
Powder coating plant KOMAXIT in Malhotice
Kočnarová, Helena ; Semrád, Antonín (referee) ; Štěpánek, Ladislav (advisor)
Project addressed the Powder coating plant KOMAXIT in Malhotice. The building is from two separate parts - administrative building and production hall. The administrative building is from two floors. In this object is the offices, day rooms, cloakrooms and hygienic rooms. In the production hall are production rooms and storage.
Production hall
Kozák, Tomáš ; Mátl,, Miroslav (referee) ; Moudrý, Ivan (advisor)
The topic of this diploma thesis is design of new production hall in the cadastral area of city Hrusinec. The building is located in an existing industrial area. The building consists of two adjacent structures. The higher of them is single-story production hall and the lower is three-story high office building. In horizontal plane the buildings have rectangular shape. Hall part is designed as a steel structure on foundation blocks. Roof is supported by truss girders. Office building is designed as a monolithic reinforced concrete skeleton also on foundation blocks. The flat roof of the office building is a single-layer with typical composition. Functionally, the building is designed as a single unit. The total employee capacity is approximately 54 workers.
Constructive-technological project of factory building RZ INDUSTRY a.s.Zaječí
Císař, Likáš ; Ing.Antonín Maděra (referee) ; Diaz, Yvetta (advisor)
This thesis addresses the technological process of building production halls and SS INDUSTRI Hare. In this work the author deals with the description of the most important stages of construction technology. More attention is given to drátkobetonové floors and steps of construction steel buildings. Finally he was taken into account in the way of material resources and ensuring the continuity of time stages.
Construction Technology implementation of stage floor in the production hall
Hrabovský, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the production hall. The building is single-staged production hall in one part connected to current object. Technological regulation solves the implementation of waterproof isolation, concrete bearing place and wire reinforced concrete. The bachelor thesis includes technical report, situation of construction in wide relations with road infrastructure, technological regulation, technical report for constructional equipment, time schedule, control and test plan, protection of health and safety, comparison variants of industrial floors, itemized budget and constructional equipment for technological implementation of stage industrial floor.
Steel load-carrying structure of production hall with bridge crane
Štulrajterová, Terézia ; Melcher, Jindřich (referee) ; Karmazínová, Marcela (advisor)
This bachelor thesis deals with the design and assessment of a steel load-bearing structure of a two-aisle production hall. That hall has a rectangular ground plan of a width 32 m (20 + 12 m) and lenght 54,54 m (9 modules distanced 6 m from each other). The main aisle is 10 m high and inside is located a overhead crane with carrying capacity 5 t. The second aisle is used as a storage area for materials that have already been produced. The skeleton of production hall is made of a ten transversal bindings. Lattice trusses are hinged mounted on constraint pillars of solid poles. The hall is situated in the north of the Czech Republic in the city of Děčín.
Technology and Innovation Centre Telč
Rašovská, Michaela ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The Bachelor's thesis address Technology and Innovation Centre Telč, designed for small and medium enterprises. The plot is located on the outskirts of the city, formerly used as arable land. The new zoning plant his area is intended for industrial construction. In the nearest surroundings there are several existing production companies and habitable housing. The proposed facility is composed of several rows of subsistence production units in two sizes, office building including with meals and building technical support area. The production unit consisting of two vertically different materials. The lower one with a background facilities and a second higher with a production hall and warehouse. The terrain is resolved and parking for employees. Entry of staff into the production of unity resolved separately from the supply. An important expressive element pulling is supporting skeletal structure above the roof of the lower mass object, which reduces the scale of buildings to better fit into the context of the city. Another element is perforated sheet which visually separates these two materials.
Technology and Innovation Centre Telč
Klímová, Adéla ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The task of the assignment was to design and technological innovation center, which would enable small and medium-sized enterprises to introduce advanced technology competitive in the national and international scale. Used should be the transfer of technology from research and university institutes. In the context of Telč with its specific environment here, however, can not accommodate any activity. Therefore should be built in such building structures that allow for flexibility and change users, including variability in surface require for their production activities. The solution subject is new building of production halls. The building site is located in Telc, on sloping ground near the Třebíčská street. This is a one-story buildings that are build to each other in level , thus using gradient terrain. Administrative and office building has two floors and is located at the entrance to the complex. Around the buildings are paved parking areas, pedestrian areas and there are too green areas with trees allowing a short rest in the summer.