National Repository of Grey Literature 111 records found  beginprevious102 - 111  jump to record: Search took 0.01 seconds. 
Production hall Edscha in Hradec Henry - construction and technology project
Zadák, Petr ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
This thesis addresses the technological project of building a production hall in EDSCHA Henry Hradec. For the construction project will be developed technological studies major technological implementation stages, summary technical report, technological specification for installation of a steel frame and cladding halls, safety measures in the construction, inspection and test plan for the assembly skeleton, time and financial plan for the whole building, budget object SO01 production hall with an administrative extension and extension of production facilities.
Powder coating plant KOMAXIT in Malhotice
Kočnarová, Helena ; Semrád, Antonín (referee) ; Štěpánek, Ladislav (advisor)
Project addressed the Powder coating plant KOMAXIT in Malhotice. The building is from two separate parts - administrative building and production hall. The administrative building is from two floors. In this object is the offices, day rooms, cloakrooms and hygienic rooms. In the production hall are production rooms and storage.
Production hall
Kozák, Tomáš ; Mátl,, Miroslav (referee) ; Moudrý, Ivan (advisor)
The topic of this diploma thesis is design of new production hall in the cadastral area of city Hrusinec. The building is located in an existing industrial area. The building consists of two adjacent structures. The higher of them is single-story production hall and the lower is three-story high office building. In horizontal plane the buildings have rectangular shape. Hall part is designed as a steel structure on foundation blocks. Roof is supported by truss girders. Office building is designed as a monolithic reinforced concrete skeleton also on foundation blocks. The flat roof of the office building is a single-layer with typical composition. Functionally, the building is designed as a single unit. The total employee capacity is approximately 54 workers.
Constructive-technological project of factory building RZ INDUSTRY a.s.Zaječí
Císař, Likáš ; Ing.Antonín Maděra (referee) ; Diaz, Yvetta (advisor)
This thesis addresses the technological process of building production halls and SS INDUSTRI Hare. In this work the author deals with the description of the most important stages of construction technology. More attention is given to drátkobetonové floors and steps of construction steel buildings. Finally he was taken into account in the way of material resources and ensuring the continuity of time stages.
Construction Technology implementation of stage floor in the production hall
Hrabovský, Tomáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves construction technology implementation of stage floor in the production hall. The building is single-staged production hall in one part connected to current object. Technological regulation solves the implementation of waterproof isolation, concrete bearing place and wire reinforced concrete. The bachelor thesis includes technical report, situation of construction in wide relations with road infrastructure, technological regulation, technical report for constructional equipment, time schedule, control and test plan, protection of health and safety, comparison variants of industrial floors, itemized budget and constructional equipment for technological implementation of stage industrial floor.
Steel load-carrying structure of production hall with bridge crane
Štulrajterová, Terézia ; Melcher, Jindřich (referee) ; Karmazínová, Marcela (advisor)
This bachelor thesis deals with the design and assessment of a steel load-bearing structure of a two-aisle production hall. That hall has a rectangular ground plan of a width 32 m (20 + 12 m) and lenght 54,54 m (9 modules distanced 6 m from each other). The main aisle is 10 m high and inside is located a overhead crane with carrying capacity 5 t. The second aisle is used as a storage area for materials that have already been produced. The skeleton of production hall is made of a ten transversal bindings. Lattice trusses are hinged mounted on constraint pillars of solid poles. The hall is situated in the north of the Czech Republic in the city of Děčín.
Technology and Innovation Centre Telč
Rašovská, Michaela ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The Bachelor's thesis address Technology and Innovation Centre Telč, designed for small and medium enterprises. The plot is located on the outskirts of the city, formerly used as arable land. The new zoning plant his area is intended for industrial construction. In the nearest surroundings there are several existing production companies and habitable housing. The proposed facility is composed of several rows of subsistence production units in two sizes, office building including with meals and building technical support area. The production unit consisting of two vertically different materials. The lower one with a background facilities and a second higher with a production hall and warehouse. The terrain is resolved and parking for employees. Entry of staff into the production of unity resolved separately from the supply. An important expressive element pulling is supporting skeletal structure above the roof of the lower mass object, which reduces the scale of buildings to better fit into the context of the city. Another element is perforated sheet which visually separates these two materials.
Technology and Innovation Centre Telč
Klímová, Adéla ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The task of the assignment was to design and technological innovation center, which would enable small and medium-sized enterprises to introduce advanced technology competitive in the national and international scale. Used should be the transfer of technology from research and university institutes. In the context of Telč with its specific environment here, however, can not accommodate any activity. Therefore should be built in such building structures that allow for flexibility and change users, including variability in surface require for their production activities. The solution subject is new building of production halls. The building site is located in Telc, on sloping ground near the Třebíčská street. This is a one-story buildings that are build to each other in level , thus using gradient terrain. Administrative and office building has two floors and is located at the entrance to the complex. Around the buildings are paved parking areas, pedestrian areas and there are too green areas with trees allowing a short rest in the summer.
Woman´s Clothing Factory
Kovářová, Hana ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The women´s clothing factory is situated in the city part Brno-Židenice in the area of one so called „brownfields“. Currently there are rusty storages and old garages standing in the building ground. The site is bordered by several streets – it is Rokytova street, Komprdova street and Údolíček street – and the fourth side is closed by boundaries of a cemetery. The area can be entered from the north-west street Údolíček. According to the ground plan, its location is temporary, so we changed it a little to better match the needs of the company. The entrance for pedestrians is situated at the north-west too. And there are also parking places and other necessary manipulation space situated on the grounds. The clothing factory is aimed at production of Giorgio Armani´s women confection so the architectural solution is based on the basic philosophy of the company. Their models are famous for their simple design with a patterned fabric that make them special. So the basic mass of the object is a simple block, which is sensitively placed at the surrounding landscape and which is made special by the parts of ovals that are embedded or comming out of the basic mass. These parts of ovals create both – resting and functional spaces. The strong horizontal character is broken by a cylindrical body stucked into the basic shape that surmounts the block by one floor. A big part of the production hall is glassed-in so we can get enough light into the interier and the employees can be in touch with the surrounding. There is a facade net strunged in front of the glass facade. The net limits overheating and also plays the role of the unifying element. The building integrates a producion hall, storages, sanitary rooms, administrative space, canteen with affilated spaces and energy traffic necessary for running the factory. The wing cell is a steel skeleton combined with reinforced concrete circumferential wall and tie brick walls.
Valuation of industrial real estate
Langer, Petr ; Dušek, David (advisor) ; Šrytr, Pavel (referee)
The aim of this thesis is to explain the operation of the industrial market and the procedure for their valuation. The main objective is the comparison of Czech and international RICS standards and their practical application in the valuation of two concrete industrial estate. The first valuation is based on the Czech legislation and it is used the cost, comparative and DCF method together with the residual method. Valuation of the prime real estate valuation is based on international RICS standards are it is applied Hardcore & Layer and Term & Reversion valuation methods.

National Repository of Grey Literature : 111 records found   beginprevious102 - 111  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.