National Repository of Grey Literature 42 records found  beginprevious21 - 30nextend  jump to record: Search took 0.01 seconds. 
Bridge on the I/44 road
Majer, David ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.
Bridge over the Jevišovka river
Čípek, Luboš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
This thesis focuses on design and assessment of load-bearing construction of a bridge over Jevišovka river at road I/53 near Lechovice. The bridge was designed as a trapezoidal cross-section slab. This solution was chosen from three sketch eventualities. The work includes an implementing engineering report, construction process report and report about static-analysis, the attachments include the sketch, vizualization, drawings, component drawing, construction process and the static-analysis of this structure. Computing of internal forces was performed by computational software Scia Engineer 17.
Bridge on I/38 road.
Novotný, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The final thesis is focused on design of valley bridging on I/38 road at the Havlickuv Brod bypass. The thesis contains study of the bridging area. For detailed assessment was chosen, from three variants, a two-beam cross-section girder of 4 spans. Load-bearing structure is designed as cast-in-place, post-tensioned, concreted at fixed falsework without phased construction. The serviceability limit state and the ultimate limit state were assessed. The thesis contains, apart from structural design, drawings and visualizations of the bridge.
Bridge on the I/44 road
Majer, David ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.
Bridge over the I/44 road
Topinková, Petra ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
My master's thesis aims to design a bridge construction spanning road III/443 over road I/44. Three versions were created one of which has been developed further. It is a three span bridge with a total spread of 77.5 meters. Proposal and evaluation of bridge construction is done unassisted. Static analysis is done using Scia Engineer program. Construcion evaluation is done by valid EU norms ČSN EN 1992-1-1. Mechanical drawing, building procedure and visualisation is also included.
Bridge over the I/55 road and railway line
Gross, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The main aim of the diploma thesis is a design of two bridges on D1 highway (Říkovice – Přerov). Structural system of these two bridges is a seven spans continuous beam. The bridges span the rail track and road I/35. The structural system of these two bridges is identical. The preliminary design is processed in two options. The first one considers the use of post-tensioned pre-casted beams PETRA with cast-in place cross beams and composite bridge deck. The second draft considers the use of two slab-beam with the cross beams. Effects of loads were calculated in SCIA Engineer program. The build-up phases were assessed by TDA method. The assessment of the structure was made according to EC.
Flyover bridge over the Bečva river
Pidima, Jan ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The thesis deals with a design of a highway bridge with multiple spans. The bridge is constructed for highway D1 and goes across the river Bečva close to the city Přerov. Two different solutions were carried out from which a solution with subsequently prestressed box girder was chosen. Static model and load actions were modelled in program Scia Engineer 2016.0. Design checks were done manually according to corresponding Eurocodes. Load actions from wind, uneven support settling and horizontal actions from transit were neglecte.
Bridge over highway on a ramp
Tlamka, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The proposal is for new construction of a road bridge over the highway.Three options of solutions were proposed but only the option of connected girder slab beam of six fields was selected. This variant was assessed by static calculation. Static calculation is processed in accordance with European standards. Another important part of this thesis is also drawings, visualization, technical report and construction procedure.
Flyover bridge over a road and inundation territory
Šťavík, Jakub ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
Master’s thesis describes the design of a highway bridge over the road II/434 and inundation territory. There are some studies designed, from which the main structure was designed as a prestressed concrete double-girder bridge with 5 spans. Loading, design and assessment of structure is solved according to applicable standards CSN and EN. Calculate the effects of the load are carried in calculation program Scia Engineer 2015. Design and asses are carried only by the manual calculation. The thesis includes used materials, construction process, statically analysis and drawing documentation.
Bridge on the I/55 road
Lugerová, Markéta ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The diploma thesis deals with design and assessment of the main structure of the road bridge which leads the road I/55 over the highway D1. The thesis contains three designs of the construction. One design was chosen for detail solution. The thesis includes statical analysis, drawing documentation and visualization.

National Repository of Grey Literature : 42 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.