Preparation for the implementation of the wastewater treatment plant in Ořechov
Bačová, Gabriela ; Šlanhof, Jiří (referee) ; Průcha, Aleš (advisor)
This bachelor's thesis focuses on the preparation of the construction of a wastewater treatment plant in Ořechov, with a focus on the rough substructure phase. The thesis includes a technical report of the entire object, a technical report of the construction site equipment, a solution of transport relations, technological regulations for the given construction phase, and proposed drawings following up on the solved phases. Furthermore, the thesis deals with the design of a suitable machine assembly, an itemized budget, and a time schedule for the rough substructure phase. Great emphasis is placed on the detailed processing of technological regulations for the implementation of excavations and sheet pile walls, as well as for the implementation of foundations and a white bathtub. These chapters are followed by the processing of control test plans. The conclusion of the thesis deals with the issue of occupational safety and health, the definition of occupational risks and the proposal of measures to eliminate them.
Apartment house Kurim - rough substructure
Šíma, Martin ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
This bachelor´s thesis is focused on technological and constructional project of apartment house in the Kurim c.p. 1741. Content of thesis includes engineering report of technological project, construction site equipment, used machinery, situational concept of transport routes and technological regulations for white bathtub. This thesis also contains construction time schledule, itemized budget and details of white bathtub.
Technological stage of the upper rough construction of an apartment building in Brno
Klech, Ivo ; Strádalová, Aneta (referee) ; Kantová, Radka (advisor)
The main aim of my bachelor thesis is the construction technological solution of the rough upper construction of the residential building located in Brno in Sadová street. This thesis contains a technical report of the given technological stage, a situation of the building with broader relations of transport routes, a statement of dimensions for the technological stage, a technological regulation including a balance of resources with a variant solution of the partition masonry, a drawing of the construction site equipment together with the technical report, timetables with a variant solution, a design of the machine assembly, an inspection and testing plan for the masonry stage and ensuring work safety. The last chapter of this work is the itemized budget for the variant solutions and selected construction details.
Completion of Essens company building in Brno - Líšeň, Gross Substructure
Zhorný, Jan ; Kantová, Radka (referee) ; Průcha, Aleš (advisor)
The content of the bachelor's thesis is the preparation of the realization of the gross substructure of the completion of Essens company building in Brno - Líšeň. The work is focused on the processing of the technical report of the construction site equipment, solving traffic relations and subsequent drawings. Furthermore, the content of the work includes the design of a suitable machine assembly, itemized budget, and time schedule of the stage of the gross substructure. Great emphasis is placed on the elaboration of detailed technological prescription for the implementation of piles and subsequently on the implementation of the white tank system. This chapter is followed by the processing of the inspection-check plan. The last part is an analysis of the issue of safety and health protection at work, definition of occupational risks and proposed measures for their elimination.
Constructive-technological project of cultural house
Bittmannová, Lenka ; Ing.Lukáš Kopecký (referee) ; Diaz, Yvetta (advisor)
This thesis deals with the solution of building technological project Žabčice cultural center. Does the project site equipment, technological prescription for floor construction, roof deck flat roofs and cladding panels locking, time and financial plan of the building, mechanical assembly, EMS plan requirements.
Campus MU Brno (green stage) - construction technological project
Honzík, Roman ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
Preparation for the construction of an apartment building in Brno - Slatina
Těžký, Filip ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the building - technological project of the apartment house in Brno - Slatina, Lučiny. The purpose will be an optimal design of construction progress with regard to finance and time. For this phase were processed the site equipment with the design of the lifting strap, the transport routes and the machine assembly. In addition, an item budget, which was followed by a detailed schedule. Based on these documents was created a balance of machines and workers. For monolithic constructions were developed a technological regulation and a control and test plan. Furthermore, the calculation of the decanting time and the design of the formwork turnover, supplemented by its drawing. In the diploma thesis is elaborated a plan for safety and health protection in the workplace and selected design details.
Preparation of realization of completion of clinical hematology, University Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
Implementation of the gross overhead construction of the residential building of the Kociánka residence in Brno
Bartl, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The bachelor thesis deals with the realization of the upper gross construction of the apartment house Residence Kociánka, in Brno. The main articles are the technological regulations for masonry structure and monolithic structure, building equipment, technological specification, mechanical assembly, time schedule and itemized budget. For the main articles are included inspection and test plan, safety and health protection during work.
Pool in Litomyšl - conctruction technological project
Mužátko, Pavel ; Novotný, Michal (referee) ; Biely, Boris (advisor)
The technological projeckt of building deals witch indoor swimming pool in Litomyšl. This Mastr's includes technical reports site equipment and STP, technological regulation, calculation, budget, inspection and test plan, wider transport relations, mechanical assembly for tis building.