National Repository of Grey Literature 21 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Construction and technological project of the telescopic covers hall - HESTEGO a.s.
Sigmund, Martin ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The content of this thesis titled "Construction and technological project of the telescopic covers hall" is building - technological solution of building together with technical, time, financial, safety, qualitative, fire and legislative solutions of selected building.
Technological phase of construction site of a residential building
Kubrtová, Zuzana ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This thesis deals with the technological solution to construction site of a residential building in Humpolec. It deals with the stage and performing masonry ceiling. This paper proposes technological rules for each stage including bills of quantities, engineering reports, schedule and safety.
Optimization procedure for the determination of usual prices of flats in development projects
Vlčková, Iva ; Marková, Leonora (referee) ; Mikš, Lubomír (referee) ; Bradáč, Albert (advisor)
The pricing of developer projects and housing is a broad area. Setting the right common price is important especially in case of court actions, execution proceedings, the privatising of housing, company mergers, capital investments in companies, estate settlements, liquidations etc. In all these cases substantial financial values are at stake and that is why it is necessary to have quality, correct factual grounds. The sole and at the same time most important basis is an expert opinion, which should guarantee an objective assessment of all circumstances that may influence the common pricing of property, in order to prevent any prejudice to the parties involved, or ensure there is no doubt in respect of possible graft. At present there is no methodology for common pricing of units (apartments and commercial premises) within a larger complex, which would take locality, placement, size, fittings, general state and other parameters that influence the price, into consideration. Yet it is common knowledge that the same unit will have a different price on the first floor, higher floors or top floor, window orientation and view, better surrounding area etc. It is also common that a larger unit with the same fittings and appurtenances will have a lower unit price than a smaller unit. The pricing in these cases is more intuitive, rather than based on analyses and reasoning. The dissertations´ aim was a methodology of pricing individual units in houses or larger complexes, which would simultaneously objectify subjective pricing, providing a rationale that would be unambiguous. This is important especially in case of court actions, execution proceedings or the privatising of housing, to preclude any bias or suspicion of corruption. The methodology also includes a software application that automatically computes input data and allows reviewing of results.
Preparation and implementation of the construction of a kindergarten
Kubíček, Lukáš ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The aim of my thesis is the Construction technological project of nursery school building. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget, timetable and building maintenance instructions
Construction technology study stage of execution upper rough construction of a residential building
Kubíček, Lukáš ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The aim of my thesis is the construction technology study stage of execution upper rougr construction of a residentail in Medlanky. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
The investment cost of construction
Novotná, Eva ; Brázdová, Eva (referee) ; Marková, Leonora (advisor)
The aim of the thesis is to determine the price of construction investment position, so as to achieve the greatest possible effectiveness for the investor. The theoretical part deals with the life cycle phases, creating price structures and contractual documents. The practical part deals with the application of theory to a case study. Specifically, it examines the lucrative sale of buildings over long-term lease.
Wellness Center in Kuřim - solution of rough construction
Sigmund, Martin ; Mohapl, Martin (referee) ; Novotný, Michal (advisor)
The content of this thesis titled "Wellness Center in Kuřim” - solution of rough construction" is building - technologal solution of building together with technical, time, financial and legislative solutions of selected building process.
Newly built apartment building in Ivančice, implementation of roof cladding
Křeháček, Matěj ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The subject of my bachelor's thesis is the design of the supporting structure of the roof including plumbing work and roofing work of a residential building in the village Ivancice u Brna. It is a new building with 16 residential units. The building is without a basement with ground floor, aboveground floor and attic. The bachelor's thesis includes: a technical report, situation of building relationships with the wider transport routes, statement of measurement, technical regulations, organization of construction solutions, schedule of work, design of mechanical assemblies, quality requirements, safety work and details.
Health Centre Vizovice - rough construction
Chamrádová, Klára ; Bravenec, Roman (referee) ; Biely, Boris (advisor)
The aim of my thesis is the construction and technological solutions to new building construction site health center in Vizovice. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
Construction of Violin and Václav Lance Personality
Vojta, Pavel ; Tomášek, Jiří (advisor) ; Perglerová, Marka (referee)
The first theme which I focus on, is the life and work of the violin maker Václav Lanc. I explain his theories and methods of the violin building and setting up. I also approximate the luthiers craft and details of the string instruments construction. Then I write about the development of violin making in the Czech republic and also in the World and I emphasize the historical consequences. Finally I deal with the string musical instruments which are used at the basic music schools. The purpose is to minimize the problems, which teachers and pupils have with the daily maintenance and with setting up of the violin. At the end, for the youngest pupils, I dedicate the "Ten commandments" - How they should to look after their musical instruments. Keywords The building, the set up, the defects.

National Repository of Grey Literature : 21 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.