National Repository of Grey Literature 339 records found  beginprevious316 - 325nextend  jump to record: Search took 0.01 seconds. 
Analysis of heat consumption of building A2 in the area of FME BUT
Andrýs, Jan ; Štětina, Josef (referee) ; Katolický, Jaroslav (advisor)
Heat consumption of the building tells us how much heat we need to bring into the building to achieve the desired temperature. From that can be expressed the financial performance of heating of the building. This work deals with the analysis of heating of building A2 FSI VUT Brno. The analysis is done by the envelope method which considered only heat transfer to the surroundings and not inside the building, as they are irrelevant for us in this case. Another aim of this study is to evaluate the heat consumption after making adjustments to the building and evaluation of their returnability, depending on the change of heat consumption. All heat loss calculations were made according to ČSN EN ISO 13790 - Energy Performance of Buildings and ČSN 73 0540 - Thermal protection of buildings. considerated modifications of the building were the replacement of windows, insulation of building envelope and combination of the two previous adjustments simultaneously.
Simultaneous utilizing of a heat pump and solar panels in a heating syste
Gongol, Jakub ; Chroboczek, Libor (referee) ; Pospíšil, Jiří (advisor)
My bachelor thesis focuses on simultaneous utilizing of a heat pump and a solar thermal collectors. I introduce principle and types of heat pumps and thermal collectors. I also introduce different sources of low-potential heat, which can be used for a heat pump. In conclusion, heat pump and solar collectors are chosen for a type house. I calculate costs needed for heating house without and with heat pump. These costs are compared and economic return is evaluated.
Ventilation of low-energy houses
Kubisz, Pavel ; Fišer, Jan (referee) ; Charvát, Pavel (advisor)
Dissertation deals with division and description progressive trends of ventilation of low-energy houses. Forasmuch as ventilation is participant in total heat consumption, It is here practical example how total heat consumption depend on ventilation heat consumption and heat consumption by construction. At the close is showed when is good, or bad, to use ventilation with recuperation.
Ventilation of family house with swiming pool
Frais, Denis ; Uher, Pavel (referee) ; Rubinová, Olga (advisor)
The Bachelor thesis is focused on the air condition of the family house with the indoor swimming pool. In the thesis the ventilation and the dehumidification of the swimming pool hall, the ventilation of the family house and the cooling of living room with the kitchen is included.
Indoor pool ventilation
Hrabová, Kristýna ; Uher, Pavel (referee) ; Rubinová, Olga (advisor)
The bachelor thesis designed ventilation for the pool hall. Hall is divided on four separate working units. The first device is designed as an air-conditioning unit for the changing room. For swimming pool were designed swimming pool air conditioning units with heat pump. Air in the hall with a water slide is adjusted using the forced ventilation unit.
Airconditioning in the cinema with a recording studio
Jurča, Jaromír ; Horák, Petr (referee) ; Rubinová, Olga (advisor)
Bachelor thesis focuses on design of air-conditioning in the cinema with a recording studio. This building consists of two three separate air-conditioned parts. The theoretical part deals with the acoustics in air-conditioning. The practical part includes detailed project documentation of air handling unit air-conditioned parts of the building.
Airconditioning for multistorey detached house
Tupcová, Tereza ; Blasinski, Petr (referee) ; Rubina, Aleš (advisor)
The bachelor’s thesis deals with design of airconditioning systems for living rooms in multistorey detached house. The design is made to fullfill functional, hygienic and operational ruqirements for the microclimate of interier. The main task of airconditioning systems is to cover heat losses in the winter, heat gains in the summer and intake of requirement minimum of fresh air. The theoretical part deals with acoustics, mainly with sound transmition and possibilities of reduction sound intensity in rational way or by physical-technical device. The practical part includes design of two airconditioning systems of hot air rating and climatization for detached house. The result of the work is the implementing documentation of two airconditioning systems for the object.
Heating the building pedagogical-psychological services
Vlasák, Vojtěch ; Adam, Pavel (referee) ; Počinková, Marcela (advisor)
My bachelor’s thesis deals with a heating system designed for a four-storey building in which a pedagogical-psychological centre is based. The heating installation uses an air/water heat pump and a low-temperature forced water circulation system. For all storeys, the design proposes panel heaters, the only exception being one tubular radiator. As for ventilation, it is designed as a forced balanced ventilation system. Last but not least, the thesis includes a hot-water preparation system which also uses the heat pump.
Air heating in exhibition space of car showroom
Bajza, Karel ; Andrys, Petr (referee) ; Rubina, Aleš (advisor)
This bachelor´s thesis deals with the designing of air conditioning system for exhibition space of car showroom and spaces which are necessary for assuring of operation. The equipment is designed to meet the operational, functional and hygienic requirements for the internal microclimate. The main task of the device's coverage of heat loss in winter and heat gains during the summer and transportation of fresh air to the interior. The theoretical part deals with cooling in air conditioning. Calculation and project part contains three desings air-conditioning units to operate various parts of car showroom. The result of this work is the detailed design work of these equipments.
Airconditioning of production and storage hall
Fridrich, Lukáš ; Ell, Jiří (referee) ; Rubina, Aleš (advisor)
The bachelor thesis deals with the design of air conditioning equipment for production and storage hall and the space necessary to ensure the operation. The first system is designed to be able to cover the thermal load operated rooms in summer and hot air ventilation in winter time. The second system is used to hot-air heating in winter time and cover the thermal load in the summer. The third system provides coverage of thermal load in the preparation room. The theoretical part focuses on the rooftop units.

National Repository of Grey Literature : 339 records found   beginprevious316 - 325nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.