National Repository of Grey Literature 38 records found  beginprevious19 - 28next  jump to record: Search took 0.01 seconds. 
construction and technology project of reconstruction fo the textile factory
Lorencová, Andrea ; Řihák, Pavel (referee) ; Novotný, Michal (advisor)
The master thesis contains a construction and technology project of reconstruction of the textile factory nearby Jihlava. The technical report provides all the basic information about the construction to this project. Assembly of steel structure and demolition works are detailed processing in the technological regulations. Other documents are processed for these selected technological regulations which are needed for their implementation – ie. control and test plans, drawings of building equipment, draft of machinery and plans of health and safety and fire prevention. Time and financial plans are also component of this project. Another annex of this thesis is budget for a major building and selected structural details.
Construction project for implementation of Retirement home Žacléř
Bonaventura, Pavel ; Průcha, Aleš (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
Residential Building Renovation
Horn, Jiří ; Stránská, Zuzana (referee) ; Struhala, Karel (advisor)
The aim of this diploma thesis is a renovation of a two-story family house in Dolní Krupá. The original house is from 1935. It has several newer outbuildings such as garage or storage spaces. The walls are made of solid fired bricks. There is a timber joist floor structure. The main building has a gable roof with timber roof truss. The outbuildings have flat and mono-pitched roofs. The reason for the renovation is the inefficiency of the aging building combined with nearing end of life of some building elements. Also, the layout of the building with multiple outbuildings built during its service life does not comply with contemporary housing standards. Therefore, a large part of the building will be demolished and replaced with new structures. Only the load-bearing walls on the first floor of the main building and the part of the building adjacent to the garage will remain. The new layout will consist of two separate apartments (one on each floor). The load-bearing structures will include ceramic masonry and reinforced concrete floor. The roof truss will be made of wood. The original appearance of the object will be preserved. The house will be heated with an air-to-water heat pump installed next to the north facade of the house. Each floor of the house will be air conditioned by a separated air conditioning unit. As the third part of the work, I chose a life cycle assessment (LCA), using several different building materials for a this renovation.
Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město
Seménka, Petr ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.
CONSTRUCTIONAL AND TECHNOLOGICAL PROJECT OF RECONSTRUCTION OF BUILDING ROOSEVELTOVA IN BRNO
Pavelka, Petr ; Nečasová, Barbora (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with the constructional and technological project of reconstruction of building Rooseveltova in Brno. The basis for this work was the design documentation for the realization of this project. The technical reports provides all the basic information about the construction to this project. Demolition works and implementation of cast-in-place reinforced concrete floor are detailed processing in the technological regulations. Control and test plans, time and financial plans, drawings of building equipment, draft of machinery and plans of health and safety and fire prevention are also component of this project. Another annex of this thesis is budget and selected assembly details.
Annes, Extension and Building Adjustment of the Building House Neumannova in Brno, Preparation and Realization of Buildings
Martincová, Michaela ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The thesis deals with the technological stage of the rough construction of the annex and the reconstruction of the apartment building on Neumannova Street in Brno-Pisárky. These are earthworks, rough substructure, rough construction, demolition work, and some of the finishing work. The diploma thesis deals with the design of the work process of the works, the design of the machine assemblies, the studies of the implementation of the main technological stages, the preparation of the budget item, the time schedule, the time and the financial plan of the object, the control and testing plan, the material assurance plan and the transport relations. Further, the design of the building facility is processed and a technical report of the building facility is made.
Lodging House
Prachmanová, Zuzana ; Sláma, Ludvík (referee) ; Mohelníková, Jitka (advisor)
Tato diplomová práce představuje určenou část projektové dokumentace ve stupni pro provádění stavby (dle vyhlášky č. 499/2006 Sb. ve znění vyhlášky č. 62/2013 Sb.) zabývající se komplexní rekonstrukcí a vytvořením nástavby stávající budovy školního ubytovacího zařízení ve městě Bzenci. Zároveň dojde ke změně užívání stavby na nájemní dům s byty charakteru sociálního bydlení. V souvislosti s touto skutečností se navržená rekonstrukce snaží zachovat a využít stávající konstrukce v co největším rozsahu, s cílem nezbytně tak nenavyšovat náklady rekonstrukce stavby.
Osteled 7c-7d Horsens Refurbishment
Král, Ondřej ; Žalmanová, Petra (referee) ; Šindlar, Jiljí (advisor) ; Kolář, Radim (advisor)
Project created during study program on VIA university in Denmark gave form to the following bachelor’s thesis which further develops it into the level of building permit documentation and documentation for execution of the project. Object of the study is located in Horsens in a residential area among several identical residential buildings. The project focuses on refurbishing this building and upgrading it’s standards for living with emphasis placed on economical, energetic and social sustainability. The main idea is to preserve the authenticity of the object by respecting original form and materials while adding modern elements. At the same time to provide diverse and pleasurable living spaces in dwellings, connection with greenery and possibilities of social contact of residents. The load bearing structure of the building is preserved, staircase area demolished and replaced by new communication core including stairs and elevators. Roof truss system and roof construction is determined to be replaced. Project is designed as barrier-free.
Execution of Production and Storage Hall in Mniší
Šilhová, Kristýna ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with the realization of a production and storage hall for the engineering industry. Part of the realization of the production hall is the demolition work of the existing agricultural building. The reconstruction of the existing premises of locksmith's workshop and dressing room for employees is also being implemented. For the preparation of this project, the thesis deals with the implementation of the main technological stages, technological plans for demolition work and substructure, transport routes of the main building materials and machines, technical report of the building site, time and financial plan of the construction, security measures especially for demolition works, quality control when drilling a pilot.
Renovation of municipality office
John, Josef ; Klubal, Tomáš (referee) ; Ostrý, Milan (advisor)
This thesis deals with the reconstruction of the Adamov municipality,based on a solution of barrier-free building use, overall improvement of the energy performance of the building and creation of new office spaces in the form of a loft. The object is located on a building site in the town Adamov. The object is currently connected to a III. road, parking space and utilities. It is a building with three above-ground floors and one basement floor. The ground plan of the municipality is rectangle-shaped, the maximum outline dimensions of the rectangle are 28.38 x 16.70m. Existing vertical supporting constructions are mason made of fired bricks. The roof frame structure is made of wood, construction framework stagnant stool, fired tiles are used as roofing. Floor surfaces are formed by ceramic tiles or vinyl. The entrance part is covered with a flat roof. The entrance area will be redesigned as a barrier-free, with a connection to the elevator that goes through the entire object. The sanitary facilities in the first and in the second floor will be renovated. Newly created attic floor will be – except for the lift - connected to the interior of the building by a new steel staircase and the walls on this floor will be of a light type. Holes fillings will be changed in the perimeter walls. A thermal insulation of the entire object by a contact heating system will take place. This thesis consists of preparatory work and studies, implementing documentation, text reports, calculations of the thermal technical assessment and fire safety solutions. Project documentation is made in accordance with currently valid laws, regulations and standards.

National Repository of Grey Literature : 38 records found   beginprevious19 - 28next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.