Preparation of the implementation of Kelčský Javorník Lookout Tower, Rajnochovice
Vokurek, Kamil ; Rotrekl, Ivo (referee) ; Kantová, Radka (advisor)
This diploma thesis is based on preparation of the implementation of Kelčský Javorník Lookout Tower in Rajnochovice. The main idea of the lookout tower constructing is to increase the local tourism. Diploma thesis assesses the whole project and it is focused on the foundation of the rough lower construction and also on assembly of the higher construction. Planning was assessed in terms of time, finance and in terms of the use of material resources. The quality of construction will be ensured by created inspection and test plans. To increase the overall service life of the structures, a scheduled maintenance schedule was designed. A variant solution of electricity supply was proposed, which will shorten the construction time, reduce the total construction costs and the overall maintenance of the building during its lifetime.
Construction Project for Implementation of Multifunctional Building
Mičjaňová, Lívia ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the diploma thesis is the elaboration of the technological project of the multifunctional building DASS in Martin. It is a two-storey building that will serve for the needs of DASS company. The diploma thesis assesses the building as a whole and focuses on selected technological processes. The work consists of the technical report, study of the implementation of the main technological stages of the main building, technological regulations for monolithic reinforced concrete horizontal structures and for vegetation flat roof, design of main construction machines and mechanisms, design and assessment of lifting mechanism and control-test plans for structures from technological regulations. Furthermore, a time and financial plan is developed. Than staff balance and a schedule of selected technological processes of the main building is processed. At the same time a construction site project, a health and safety plan, a noise study and LEED 2009 CORE & SHELL are prepared for the construction of a multifunctional building. The work is further supplemented by a specialization focused on the analysis of the contribution of green roofs on energy efficiency of buildings.
Construction - technological project of Chopin Hotel in Bratislava
Bajerová, Marie ; Kopecký, Lukáš (referee) ; Novotný, Michal (advisor)
This final thesis is focused on technological project Hotel Chopin in Bratislava. The technological project deals with the planning of the entire construction and focuses on the design of the site equipment, time plan of the building development and the detailed time plan of the building structure. Further focuses on the construction cast-in-place reinforced concrete structures. It prepares the technological prescription for cast-in place reinforced structures, inspection and test plan and the plan of safety risks and measures. Part of the project is also the construction budget and the mechanical assembly plan.
Planning of construction contracts by supplier
Nováková, Jolana ; Novák, Tomáš (referee) ; Nový, Martin (advisor)
This diploma thesis deals with the planning of construction contracts from the perspective of a contractor. In the theoretical section, the basic concepts of project management are explained. Further, the methods and principles used in the management of the construction project of building a complex are described. The practical part contains a particular case where the methods are used to schedule a time during the course of construction and planning of the resources needed for implementation.
Implementation of Superstructure of Kindergarten in Zásada
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this thesis is technological solution of rough structure of kindergarden in Zasada village. The thesis includes technological report, site acommodation, technological directives for walling and monolithic ceiling structure, control and test plan, draft of machinery setup, solution of wider traffic problems, draft of safety and health during work and difference between truck crane and tower crane. Time plan, budget, drawing of boarding solution are also included in this thesis.
Visitor Centre Mikulčice - construction technological project
Krasnovský, Jiří ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the construction technological project of visitor center in Mikulčice. This thesis contains a technical report, project of site equipment with technical report, time and financial plan of the building, study for the realization of major technology stages, design of assembly machines, budget of object, technological specification of steel structure and COR-TEN cladding with inspection and test plans.
The complex of residential buildings, Praha - Jarov, civil technological project
Komenda, Tomáš ; Hrůza,, Jaroslav (referee) ; Kovářová, Barbora (advisor)
The goal of this diploma thesis is to create a building technology project for construction of 4 flat houses within stage 3a. of the building project „Green town of Prague – Jarov, phase II“. The flat houses are in two pairs interconnected by basement, each is a 7 floor high reinforced concrete building with flat roof and is functionally connected to others by a terrace garden system. This document focuses on organisation and preparation of the construction. It includes building site equipment, cost calculation for setting up and servicing of the building site with graphical illustrations for selected construction phases. Additionally a detailed time schedule was created with a proposal for stream construction of the reinforced concrete scelet and lining in the pairs of interconnected buildings. A realization study of the main technological phases was also prepared. The diploma thesis covers in detail construction of reinforced steel scelet and circumferential casing including a layer of contact insulation system. A blueprint of formwork for walls and ceiling is included in the manual for construction of reinforced steel scelet. On these particular actions probationary and control plans were added. The required machinery set with detailed placement was also drafted. An itemized budget for the main building was prepared as well. Attached to this document is a detailed manual on how to use housing units including repairs and revisions plan for next 30 years. Part of this diploma thesis is also a detailed study covering the construction in relation to the surronding living and educational areas.
Technological phase of the cover ground object
Fatura, Josef ; Čech, David (referee) ; Henková, Svatava (advisor)
Thesis resolves civil technological stage of the roofing of the administrative buildings and warehouse halls in the Grand River. It deals with the structure, roof insulation, nekrokevní, klempířskými and povlakovou-covering elements. The work contains technology rules, a statement of the Bill, the timetable, drawings and other technological documentation stage.
Construction Order Preparation and Management from Aspect of Investor
Dočkal, Jan ; Rumlová, Marcela (referee) ; Nováková, Jana (advisor)
The main target of this dissertation is to introduce problems of preparation and bulding order managing from aspect of investor to its readers. The aim of the thesis is to describe the proces during individual stages of the public bulding order life cycle and also relevant legislation for its assignment. Practical demonstration of the stated methods based on real project of the specific customer is the important part.
Building Order Management in the Building Company
Eis, Jan ; Staněk, Vít (referee) ; Nováková, Jana (advisor)
The master's thesis describe system of management construction project and elaboration prize offer from the perspective of contractor of building. Objectiv of this work is to introduce whit specific principles, procedures and methods, that are needed to prepare and management of construction contracts and their subsequen application to specific construction work - new building of locksmith in Chotěboř.