National Repository of Grey Literature 25 records found  previous11 - 20next  jump to record: Search took 0.00 seconds. 
Bridge over the Živný Brook
Sekanina, Josef ; Řehulka, Martin (referee) ; Panáček, Josef (advisor)
This thesis occupies with the design of the road bridge over the stream Živný, a railway lane and a projected road between Běleč village and Husinec village. There are designed three variants of bridges. The variant no. 1 – continuous box girded beam – was chosen for the detailed analysis. The pre-stressed concrete road bridge is designed and evaluated according to European standards – Euro codes. The sequential construction influence and its impact on the construction is also considered in the calculations. The drawing documentation and the visualization of the bridge are made.
Bridge on the I/44 road
Majer, David ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.
Design of a road bridge
Vašina, Michal ; Řehulka, Martin (referee) ; Panáček, Josef (advisor)
The thesis deals with structural design of road bridge across the Opava river and its floodplain area. Three variants were elaborated and compared. Variant of 8-span girder bridge about three hundred metres long was chosen for detailed processing. Structural model was created by computational software Midas Civil and SCIA Engineer, first model is 3D beam grid model and includes time dependent analysis of construction phases. The second model is 2D model formed of plate elements. Structural design report and drawings are included. Assessment was provided accoding to valid European standards.
Construction phase in the building information model
Richterová, Zuzana ; Hanzl,, Vlastimil (referee) ; Berková, Alena (advisor)
The diploma thesis deals with the creation of construction phases in the building information model, which were created with the use of data from the design documentation of passport, data from the actual measurements taken mainly by laser scanning and the design documentation of reconstruction. This thesis describes the procedure from fieldwork (acquisition of measurement data), through its processing, to the final drawings including also the model in *.rvt format. The focus of the thesis is on the project phases, for which the issues arising in their creation are described. The stumbling block in this thesis was the inconsistency in the design documentations, which was mainly reflected in the creation of the model of the reconstruction phase. All the pitfalls that occurred in the thesis are explained in the text.
Bridge ower the Opavice river
Tang, Minh Phú ; Russnák, Adam (referee) ; Panáček, Josef (advisor)
The diploma thesis deals with the design of a road bridge on the I/57 expressway over the relocation of the cycle path, the Opavice river and the local road, which involves the relocation of the access to the waterworks. The bridge structure is located in the territory of the town of Krnov. A study of the area's bridges is part of the project and three studies have been prepared. Study A was chosen for detailed processing. It is a continuous box girder bridge with three spans. The superstructure is designed as a monolithic, post-tensioned structure. A sliding girder is being investigated for the structure's construction. Scia Engineer 18.1 is used to do the load effects computation. Only the consequences of vertical load effects have been addressed, with no consideration of horizontal load effects. The structure was evaluated using limit states, taking into account the impact of construction on its design.
Continuous box girder bridge
Hajnoš, Mário ; Páleník, Petr (referee) ; Koláček, Jan (advisor)
The topic of this thesis is detailed design of supporting structure of continous box girder bridge across a deep valley called Lazný creek. The bridge have to pass the second class road with category S 9,5. The design is processed by two options. The chosen option is designed as a girder with five spans 44,8 m + 55 m + 55 m + 55 m +44,8 m. Total length of bridge is 268,57 m, the main girder is gradually cast into the formwork suspended on a special ceiling scaffolding. The axis of the bridge is in a plan straight with the constant transversal slope 2,5 %. The thesis contains six models in software SCIA ENGINEER. Part of the work is situated on time depended analysis with construction phases. Assesment of ultimate limit states and serviceability limit states were done by hand according to the valid standards and regulations. Structural analysis, drawing documentation and vizualization are parts of this work.
Bridge on the I/39 road
Pokorná, Šárka ; Svoboda, Adam (referee) ; Panáček, Josef (advisor)
The topic of this Bachelor thesis is design of thle bridge on the I/39 road. Three variants of studies were created. Study C has been choses as the best variant – prefabricated pre-tensioned beams with composite deck. Bridge with one span. Time dependent analysis was taken into account.
Bridge over the Rajčanka river
Kavecký, Jakub ; Svoboda, Adam (referee) ; Panáček, Josef (advisor)
The aim of the bachelor thesis was to design a bridge over the Rajčanka river. The bridge is single field with perpendicular crossing of the watercourse. Three variants were created, one of which was the subject of thesis. For a detailed dimensioning, a variant with prefabricated additional-prestressed beams coupled with a concrete slab was selected. The static´s models were created in software SCIA Engineer 19.1 and IDEA StatiCa. Internal forces and load combinations were compiled including time-dependent construction and rheological phenomena. The reports were processed by manual calculation, according with the Eurocode. Climatic influences, such as wind and snow, as well as braking force have been neglected.
Pedestrian Bridge
Hibš, Daniel ; Kocourek,, Petr (referee) ; Stráský, Jiří (advisor)
This diploma thesis deals with the design of a new bridge construction over a multi-lane communication. The converted road is a pedestrian and biking trail connecting significant agglomerations. Three studies were worked out in this thesis and the C variant was selected for further detailed processing. It is an unsymmetrical suspended bridge with a cast-in-place deck. In the section above the communication, the bridge is made up of prefabricated segments. Suspension of the structure is made of two sloping pylons forming a V-shape. The analysis of the construction was carried out in the MIDAS Civil program, where a complete model of construction was entered, including a subsequent estacade. The model describes the construction process and includes creep and shrinkage of the concrete. The traffic, temperature and wind loads were used. The design was assessed for the ultimate limit states and serviceability limit states. The assessment was carried out in the IDEA StatiCa program, supplemented by manual calculations. The static calculations also include assessment of the harmonic response. Subsequently, overview drawings, detailed drawings and visualizations were developed.
Bridge on the I/44 road
Majer, David ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.

National Repository of Grey Literature : 25 records found   previous11 - 20next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.