Technological stage of the rough superstructure of an apartment building
Křičenský, Jan ; Strádalová, Aneta (referee) ; Kantová, Radka (advisor)
The aim of this bachelor's thesis was to develop selected parts of a construction technology project focused on the rough superstructure stage of a residential building in the town of Jaroměř. Specifically, the project addresses the execution of all load-bearing structures, which consist of both masonry and monolithic walls and monolithic ceilings. Additionally, it covers the installation of balconies and staircases, which are made as concrete prefabricates. More detailed plans were created for the construction work, including the design and verification of supply routes, a control and testing plan, ensuring work safety, and proposing the necessary machinery for their implementation. The procedure for carrying out the work and the corresponding schedule for the entire construction are also elaborated. The rough construction of the building is addressed from a financial perspective as well, within the framework of an itemized budget for this construction stage. The thesis includes a proposal for the construction site facilities, including the calculation of electricity and water consumption. Finally, the work focuses on the verification of the proposed crane and selected construction technology details.
Realization of the lower construction of a multifunctional building in Prague
Tkachenka, Vadzim ; Sukopová, Dagmar (referee) ; Mohapl, Martin (advisor)
The bachelor thesis deals with the realization of the rough substructure stage of a multifunctional building in Prague 7. The building is based on large-diameter piles and foundation slab, the underground walls are monolithic. The work includes a technological regulation and a detailed inspection and testing plan for drilled piles. In addition, a technical report for the building, the solution of the wider traffic relations, site facilities, the design of the machine assembly for the entire stage and safety requirements are also prepared. The work also includes a time schedule, staff balance and itemised budget with bill of quantities for the entire stage, which are prepared in the relevant software. In the last step, a seminar paper on parking systems is prepared where information on types and mechanisms of parking lifts are provided. The thesis focuses on effective methods of dealing with various aspects of the organization of the construction process, with emphasis on safety, quality and economy of project implementation.
The Block of Flats in Brno, Bystrc - Project Planning and Management
Šarlejová, Petra ; Štěrba, Martin (referee) ; Motyčka, Vít (advisor)
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats.
Construction and Technological Solutions Structural System of the Building for Fitness, Rehabilitation and Accomodation in Štíty
Revús, Adam ; Valenta, Michal (referee) ; Mohapl, Martin (advisor)
The Bachelor´s thesis pursues the decisive issues of supporting structure of the building for fitness, rehabilitation and accommodation in Štíty. The thesis seeks to find the building – technological optimum for main construction works. The thesis includes technical report of the object, technological prescription, equipment construction, machinery , budget, timetable,inspection and test plan, work safety.
Project
Malý, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
Construction Technology Project Eye Clinic
Kašpar, Radek ; Selník, Petr (referee) ; Vlčková, Jitka (advisor)
Diploma thesis with construction technological project Eye Clinic. Contents of construction technological project are project engineering report, study of realization of main technological stages, engineering report of site equipment, technological regulation scaffolding and technological regulation insulation, inspection and test plan
Project planning and management of construction of the bridge on the road II / 377
Soukup, Ondřej ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The subject of this thesis the construction and technological preparation for the construction of the bridge ev.č. 377-007 across the Býkovka river in the municipality Rájec - Jestřebí, which is part of the reconstruction of a main road II / 377 Bořitov - Rájec. The thesis is elaborated a technical report on the structural and technological project, coordinating construction situation, the situation with wider relationships routes following the stages, time and financial plan – by objects, study the implementation of major technological stages of the building SO203 project site equipment, design of the main construction machines and mechanisms, the timetable of the main building structure, workers deployment plan, plan of machines usage, a plan for securing material resources for SO 203, technological regulation for the implementation of bored piles of, inspection and test plan for pilots, budget SO 203, sequence diagram construction, control and monitoring plan and calculation of bearing capacity of the bridge foundation piles.
Hotel Sachrův kopec Harrachov, civil technical project.
Kvíčalová, Monika ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
The diploma thesis deals with construction and technological solution of Hotel Sachrův kopec in Harrachov. Part of the thesis is technical report of main object, study of realization main technological phases, technological prescriptions and inspection and test plans for steel-concrete ceiling construction, copper roof cover and Spiroll panel ceiling construction. Thesis contain project of work side facilities, main construction machinery, shedule of health and safety, environmental protection, coordination situation of transport routes, time and financial plan for construction, drawing of formwork for steel-concrete ceiling construction and drawing of Spiroll panel ceiling.
Educational and counseling center Open garden NGOs in Brno - construction technology project
Marková, Veronika ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is solving of the construction project of the administrative building "Educational and consulting center Open Garden of NGO in Brno" The building is designed as three-storey reinforced concrete skeleton with a flat vegetation roof and a light cladding. The diploma thesis includes technological prescriptions for the assembly of the light cladding and for window installation, inspection and quality plans, design of machine assembly, site equipment project, item budget, etc.
Office building of brewery in Černá Hora, technological solution of roofing stage.
Nevole, Jan ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The aim of this bachelor thesis is to design a roof construction for a building used as an administrative centre at the Černá hora brewery. The attachments provide a solution in forms of a wooden roof frame and a flat roof constructed from tie beams. The thesis contains the technological procedures for constructing both variants of roofing, principles according to which is the construction organised, safety and health measures taken on the construction site, design of the mechanical assembly, time plan, controlling and testing plans for both variants and construction details.