Original title:
Řízení rizika zhotovitele stavební zakázky
Translated title:
Risk Management Contractor Construction
Authors:
Štráchal, Jakub ; Ing.Tomáč Hanák, Ph.D. (referee) ; Marková, Leonora (advisor) Document type: Master’s theses
Year:
2013
Language:
cze Publisher:
Vysoké učení technické v Brně. Fakulta stavební Abstract:
[cze][eng]
CÍLEM MÉ DIPLOMOVÉ PRÁCE NA TÉMA „ŘÍZENÍ RIZIK ZHOTOVITELE STAVEBNÍ ZAKÁZKY“, JE POPSAT PROCES ŘÍZENÍ RIZIK U DODAVATELE STAVEBNÍCH PRACÍ. TENTO PROCES ZAČÍNÁ IDENTIFIKACÍ RIZIK POMOCÍ RŮZNÝCH METOD. NÁSLEDUJE ANALÝZA TĚCHTO RIZIK. HLAVNÍ SKUPINOU RIZIK, JSOU RIZIKA SPOJENÁ SE SUBDODAVATELSKÝM SYSTÉMEM. K TĚMTO RIZIKŮM POPÍŠU JEJICH SIGNÁLY A SPOUŠTĚČE. NA ZÁKLADĚ JEJICH ZÁVAŽNOSTI PRO PROJEKT, DEFINUJI ZPŮSOB JEJICH OŠETŘENÍ. V POSLEDNÍ ČÁSTÍ SE NACHÁZÍ NÁVRH SLEDOVÁNÍ RIZIK, KDE NAVRHUJI ZPŮSOB KDY A KDO BUDE RIZIKA SLEDOVAT V PRŮBĚHU VÝSTAVBY.
THE AIM OF MY THESIS ON THE TOPIC OF "RISK MANAGEMENT CONTRACTOR CONSTRUCTION CONTRACTS" IS TO DESCRIBE THE PROCESS OF RISK MANAGEMENT OF CONTRACTOR CONSTRUCTIONS WORK. THIS PROCESS BEGINS WITH THE IDENTIFICATION OF RISKS BY USING DIFFERENT METHODS. FOLLOWED BY ANALYSIS OF THESE RISKS. THE MAIN GROUP OF RISKS ARE RISKS ASSOCIATED WITH THE SUBCONTRACTING SYSTEM. THESE RISKS I WILL DESCRIBE THEIR SIGNALS AND TRIGGERS. ON THE BASIS OF THEIR IMPORTANCE TO THE PROJECT, I WILL DEFINE THE MANNER OF THEIR TREATMENT. IN THE LAST PART IS A PROPOSAL OF A MONITORING RISKS, WHERE I SUGGEST A WAY, WHO WILL LOOK AFTER THE RISKS DURING THE CONSTRUCTION AND WHEN.
Keywords:
ACCIDENT; CHANCE; CONTRACTOR; DAMAGE; HAZARD; RESOURCE RISK; RISK; RISK ANALYSIS; RISK BEARER; RISK MANAGEMENT; SCENARIO; IDENTIFIKACE RIZIK; NEBEZPEČÍ; OŠETŘENÍ RIZIK; RIZIKA; SIGNÁLY RIZIK; SLEDOVÁNÍ RIZIK; SPOUŠTĚČE RIZIK; ZHOTOVITEL
Institution: Brno University of Technology
(web)
Document availability information: Fulltext is available in the Brno University of Technology Digital Library. Original record: http://hdl.handle.net/11012/28591