PROBA3 Coronograph System Progress Report
Autoři:
Horodyská, Petra ; Melich, Radek Typ dokumentu: Výzkumné zprávy
Rok:
2016
Jazyk:
eng
Abstrakt: The scope of this document is to provide to CSL and ESTEC a progress report of ongoing activities as described in Project Management Plan v1_1. TOPTEC main activities cover realization of coronagraph optical elements, housing for this elements, HDD and the Lyot stop realization. In year 2016, the DM model was finished and delivered and the STM model was competely realized and delivered. Toptec started to prepare the documents for Critical Design Review (CDR).
Klíčová slova:
coronagraph optical elements; DM; HDD; housing; Lyot stop; STM