Original title: PROBA3 Coronograph System Progress Report
Authors: Horodyská, Petra ; Melich, Radek
Document type: Research reports
Year: 2016
Language: eng
Abstract: The scope of this document is to provide to CSL and ESTEC a progress report of ongoing activities as described in Project Management Plan v1_1. TOPTEC main activities cover realization of coronagraph optical elements, housing for this elements, HDD and the Lyot stop realization. In year 2016, the DM model was finished and delivered and the STM model was competely realized and delivered. Toptec started to prepare the documents for Critical Design Review (CDR).
Keywords: coronagraph optical elements; DM; HDD; housing; Lyot stop; STM

Institution: Institute of Plasma Physics AS ČR (web)
Document availability information: Fulltext is available on demand via the digital repository of the Academy of Sciences.
Original record: http://hdl.handle.net/11104/0270252

Permalink: http://www.nusl.cz/ntk/nusl-263577


The record appears in these collections:
Research > Institutes ASCR > Institute of Plasma Physics
Reports > Research reports
 Record created 2017-03-17, last modified 2023-12-06


No fulltext
  • Export as DC, NUŠL, RIS
  • Share