| |
|
The warehouse in Polna - rough upper construction
Chroustovský, David ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
This work includes a step of rough upper construction of warehouse in Polná. Part of this work is the construction and technology report, technical report of site facilities, design of mechanical assemblies, technological prescription for ferroconcrete skeleton, technological prescription for sandwich panel cladding, a report on the wider transport relations, a report on the protection of health and safety on site. Attachments include drawings of building equipment, layout scheme cargo trailers, assembly diagrams, calculation of weight trailers, routes wider transport relations, budget and schedule.
|
|
LIVE UP apartment complex in Brno - planning of implementation of construction
Dejmalová, Hana ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
The subject of the master´s thesis are selected parts construction technology project apartment house LIVE UP in Brno – Bohunice. It is a new building with one underground floor and six overground floors. Construction of the house is monolithic and upper floors are bearing masonry walls. The work includes technical reports, study the implementation of major construction phases, organization of the construction, technological regulation of flat single-roof, itemized budget with the statement of measurements, time schedule, inventory of machines.
|
| |
| |
|
Technological stage of the substructure of an apartment building in Zlín
Žůrková, Dominika ; Řihák, Pavel (referee) ; Kantová, Radka (advisor)
The subject of my bachelor's thesis is the solution of the technological stage of the substructure of an apartment building in Zlín. The building has four floors above ground and one underground floor. The house is based on a foundation slab, which is connected to the perimeter walls, these structures form a white tank system. The thesis includes a technical report, the construction situation with broader relations to transport routes, bill of quantities, technological regulations for earthworks and foundations, design of mechanical assembly, time schedule, machine system design, inspection and test plan, occupational health and safety, white tank system solution, schemes for excavation work and concreting.
|
| |
|
Office building in Trencin - construction technology project
Panáček, Jakub ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The subject of my dissertation is to describe construction technology project of the administration building in Trencin. I focused on the budget, work schedule, environmental protection, appropriate setup of temporary objects on the construction site and efficient machine assembly. Result of work represents possible construction progression with focus on site condistions.
|
|
PPension - technological phase coarse upper construction
Řihák, Pavel ; Henek, Vladan (referee) ; Henková, Svatava (advisor)
The thesis is focused on construction srubového pension. It deals with issues of selected technological part of the project, which are: technical report biotic pests of wood, wood protection, technological process timber harvester, log walls, ceilings, roof, site facilities, the construction schedule, naazení machines, inspection and test plan, safety and health protection at work.
|
|
Analysis of Aplication Flux and Solder Paste on PCB for BGA components
Toufar, Michal ; Řihák, Pavel (referee) ; Vala, Radek (advisor)
This thesis deals with rework of BGA components. There are described defects and errors in a solder joints. The current trend is focused on thin packages with fine pitch. It is assembled with smaller and smaller solder balls. It is described effect of different application of flux and solders paste for rework. The main part is focused on dipping and dispensing. These methods are suitable for repair process.
|