National Repository of Grey Literature 9 records found  Search took 0.00 seconds. 
Realization of envelope of production and storage hall EBM in Velké Poříčí
Mlčáková, Markéta ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
My bachelor thesis is focused on the stage of sheathing of an industrial and production ebm hall in Velké Poříčí near Náchod. The stage is focused on sheathing with Bond cassettes and Rockprofil cassette system including trapezoidal metal sheets. The work consists of the concomitant and summary technical report, solution of the site construction equipment, solution of factory routes, technological regulation, report of acreage, time schedule, control and test plan, work safety and layout scheme of sheathing.
Implementation of Registred Office of Company POLNA corp. s.r.o. in Třinec
Špilínek, Richard ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
This master´s thesis deals with construction-technological project of administrative-production and storage complex in Třinec - Oldřichovice. It´s a new building of the main building, consisting of a two-storey administrative building and a one-storey storage hall, which is complemented by other sub-objects. The master´s thesis solves the realization of the building as a complex whole and in more detail focuses on vertical and horizontal supporting structures, made of steel elements and steel-concrete ceiling structure. An integral part of the project include studies of the realization of the main technological stages of the main building, technological regulations, complemented by assembly schemes, solution of transport routes and proposal of machine assemblies, site equipment design, time schedules, budgets, inspection and test plans and proposal of security measures for selected risks. The work is further supplemented by a specialized area that prepares the design and execution of intra-areal reinforced communications.
Implementation of the rough construction of the bowling center Bílá hora
Hladký, Dominik ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The subject of this bachelor thesis is the stage of assembly of a precast reinforced concrete structure with loadbearing structure of a roof of a bowling center Bílá hora. It deals with the working procedure of the assembly of the load-bearing reinforced concrete frame, the load-bearing parts of the roof structure,report of site equipment, time schedule, used building equipment, inspection and testing schedule, occupational safety and line-item budget. The thesis also includes a comparison of clay block cladding with mineral wool contact thermal insulation and Kingspan insulated panel system. In attachment are contain drawings individually assembly proces, situation, site equipment, assembly drawing panels Kingspan, technology detail
Realization of the outer casing of the production facility in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
This bachelor thesis focuses on the technological stage of cladding of the production hall in Hodějice. Sandwich panels BalexMetal were chosen for the cladding. Roof is flat and supported by trapezoidal metal sheets. External coat is hydroisolation foil Fatrafol. Technological regulations, assessment of transport itineraries, costing and the bill of quantities, work schedule, technical report for site equipment, plan of a machine assembly, control and test plan, safety and health care policy were prepared for this stage. In the last chapter, several options of the cladding are compared and, in the end, sandvich panels BalexMetal were chosen as being the most suitable option.
Extension of the sports centre in Slopné, technological stage of roofing
Heinz, Pavel ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The bachelor thesis deals with the technological stage of the roofing of the sports centre extension in the village of Slopné. It is the construction of a multi-purpose building, which extends the capacity of the existing community centre. The extension consists of ground floor parts and a main hall/gymnasium with multifunctional use. The content of the work includes a technical report for the roofing, a solution for the transport of materials, a technological regulation for the assembly work of the roofing of the hall, an itemized budget for the roofing and a timetable for the specified technological stage, an inspection and testing plan and a solution for occupational safety in the process.
Implementation of Registred Office of Company POLNA corp. s.r.o. in Třinec
Špilínek, Richard ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
This master´s thesis deals with construction-technological project of administrative-production and storage complex in Třinec - Oldřichovice. It´s a new building of the main building, consisting of a two-storey administrative building and a one-storey storage hall, which is complemented by other sub-objects. The master´s thesis solves the realization of the building as a complex whole and in more detail focuses on vertical and horizontal supporting structures, made of steel elements and steel-concrete ceiling structure. An integral part of the project include studies of the realization of the main technological stages of the main building, technological regulations, complemented by assembly schemes, solution of transport routes and proposal of machine assemblies, site equipment design, time schedules, budgets, inspection and test plans and proposal of security measures for selected risks. The work is further supplemented by a specialized area that prepares the design and execution of intra-areal reinforced communications.
Realization of the outer casing of the production facility in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
This bachelor thesis focuses on the technological stage of cladding of the production hall in Hodějice. Sandwich panels BalexMetal were chosen for the cladding. Roof is flat and supported by trapezoidal metal sheets. External coat is hydroisolation foil Fatrafol. Technological regulations, assessment of transport itineraries, costing and the bill of quantities, work schedule, technical report for site equipment, plan of a machine assembly, control and test plan, safety and health care policy were prepared for this stage. In the last chapter, several options of the cladding are compared and, in the end, sandvich panels BalexMetal were chosen as being the most suitable option.
Implementation of the rough construction of the bowling center Bílá hora
Hladký, Dominik ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The subject of this bachelor thesis is the stage of assembly of a precast reinforced concrete structure with loadbearing structure of a roof of a bowling center Bílá hora. It deals with the working procedure of the assembly of the load-bearing reinforced concrete frame, the load-bearing parts of the roof structure,report of site equipment, time schedule, used building equipment, inspection and testing schedule, occupational safety and line-item budget. The thesis also includes a comparison of clay block cladding with mineral wool contact thermal insulation and Kingspan insulated panel system. In attachment are contain drawings individually assembly proces, situation, site equipment, assembly drawing panels Kingspan, technology detail
Realization of envelope of production and storage hall EBM in Velké Poříčí
Mlčáková, Markéta ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
My bachelor thesis is focused on the stage of sheathing of an industrial and production ebm hall in Velké Poříčí near Náchod. The stage is focused on sheathing with Bond cassettes and Rockprofil cassette system including trapezoidal metal sheets. The work consists of the concomitant and summary technical report, solution of the site construction equipment, solution of factory routes, technological regulation, report of acreage, time schedule, control and test plan, work safety and layout scheme of sheathing.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.