National Repository of Grey Literature 134 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
Construction Project for Implementation of Bus Terminal in Benešov
Hájek, Tomáš ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this diploma thesis is construction project for implementation of bus terminal in Benešov. This thesis contains technical report, construction study of main technological stages, supply management for selected technological processes, technical report of site facilities including drawings, construction machinery and equipment for selected technological processes, technological specification for execution of earthworks SO01 & SO02, technological specification for execution of foundations SO01 & SO02, control and test plan for execution of earthworks, control and test plan for execution of foundations, safety and health protection plan for selected technological processes, construction site noise study and a construction study of reconstruction of roads in the terminal area.
Construction Technology Project Eye Clinic
Kašpar, Radek ; Selník, Petr (referee) ; Vlčková, Jitka (advisor)
Diploma thesis with construction technological project Eye Clinic. Contents of construction technological project are project engineering report, study of realization of main technological stages, engineering report of site equipment, technological regulation scaffolding and technological regulation insulation, inspection and test plan
RESIDENTAL BUILDING SLAVKOV U BRNA. TECHNOLOGICAL PHASE OF FINISHING WORKS.
Šmerda, Michal ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
In the thesis I deal with the internal finishing work of a residential building in Slavkov u Brna. I elaborated in detail the technical regulations for the implementation of internal partition walls, interior plaster and floor structures. For floor structures I developed to compare the spreading layers under which I has elected a suitable material for this construction. This part is followed by the appropriate machine assembly, quality control work, the draft site facilities and transport links. I has also drawn up a sustainability plan object, construction budget and schedule of work.
Gas pipeline reconstruction Viniční A in Brno - construction technology project
Touška, Marek ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The master´s thesis is solving build - up technology of reconstruction pipeline.
Residential house in Čáslav, gross superstructure
Němec, Lukáš ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This thesis investigates the solution of selected technological project of the construction of gross superstructure residential building in the former barracks Prokopa Holeho. Their work includes the technical report solved object, technological specification, bill of quantities, schedule and budget, addressing broader transport relations, organization development, design of mechanical assemblies, including drawings and technical news site facilities, safety, environmental protection, inspection and test plans.
Proposal of Site Facilities
Chalabala, Martin ; Aulehla, Jan (referee) ; Nováková, Jana (advisor)
The thesis focuses on the description of the function and structure of the site facilities, requirements for the planning and implementation and operation of the project of the front mill room. Without a detailed description of these aspects is not possible to design a functional operational site of this type of project. So the aim of this thesis is to provide necessary theoretical base, that is later applied on the concrete construction of the pre-grinding hall in Prachovice cement works.
Preparation of the implementation of Kelčský Javorník Lookout Tower, Rajnochovice
Vokurek, Kamil ; Rotrekl, Ivo (referee) ; Kantová, Radka (advisor)
This diploma thesis is based on preparation of the implementation of Kelčský Javorník Lookout Tower in Rajnochovice. The main idea of the lookout tower constructing is to increase the local tourism. Diploma thesis assesses the whole project and it is focused on the foundation of the rough lower construction and also on assembly of the higher construction. Planning was assessed in terms of time, finance and in terms of the use of material resources. The quality of construction will be ensured by created inspection and test plans. To increase the overall service life of the structures, a scheduled maintenance schedule was designed. A variant solution of electricity supply was proposed, which will shorten the construction time, reduce the total construction costs and the overall maintenance of the building during its lifetime.
Implementation of Apartment House in Brno - Building Contruction Project
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
Constructive-technological project of a new building University of Veterinary and Pharmaceutical Sciences Brno
Gwoździová, Joanna ; Ing.Bogdan Iwanuszek (referee) ; Diaz, Yvetta (advisor)
The subject of the thesis is the construction-technological project New flats of Study and Information Centre of Faculty of Veterinary Medicine in Brno. The building will offer a modern study environment for students. There will be a space for the central library as well as the study centre in the SIC. Also, the university archive and museum depository of the Institute of the History of Veterinary Medicine and Pharmacy will take place there. The building will be constituted of three five-floor blocks with overall groundplan size 72,40 x 30,50 m. The construction system is comprised by a ferroconcrete frame. The block C (the northern one) has one underground floor. At the level of the first uderground floor, the particular blocks are interconnected by an installation corridor. At the level of the second and third above-ground floor, the blocks are linked up with ferroconcrete connecting bridges. In the case of the fourth above-ground floor, the blocks are bridged by a dimensional steel construction which at the same time forms a roof and lifts the glassed frontage along the perimeter of the building. The fifth above-ground floor disposes of recessive steel extenstions of the engine rooms of air conditioning system.
Koks production hall - upper stage of construction
Vaculík, Zdeněk ; Průcha, Aleš (referee) ; Biely, Boris (advisor)
Subject of this work is execution of the superstructure, especially solution of mounted frame included the lining together with the sheathing construction and building roof. The building will serve as assembly and storage hall for the Koks Production company. Reinforced concrete precast frame forms supporting structure. The building is split to two parts, single-storey hall and two-storey administration part. Construction-technological part from complete execution of the building rough superstructure has been selected as a bachelor’s thesis subject. The technological regulation for the assembly of reinforced concrete precast frame has been elaborated. The precast frame is formed by precast elements supplemented by the lining between the columns in the administration part. The solution of following subjects of building construction was taken into consideration too: • solution of suitable site machinery • workers health, safety, and preservation on the site • health protection • test and trial plan for the mounted reinforced concrete skeleton • time schedule and economic analysis for the superstructure • logistics and material storage on the site

National Repository of Grey Literature : 134 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.