Study of the small water power plant which is situated in the middle and lower reach of river Morava
Dočkal, Jiří ; Malý, Jiří (referee) ; Matoušek, Antonín (advisor)
The present thesis deals with the description of the current state on the course of Morava river from small hydro Kromeriz after a small water plant Hodonin. Subsequently, I deal with the description of search of weir plants and weirs for the construction of small hydropower (especially their heads, structures and, where appropriate, possible adaptation). Then I deal with completion new hydroelectric plants on this founded weir plants and weirs which are in section between the small hydroelectric power Kromeriz and Lanžhot city on the Czech Republic side (Brodské on the Slovak Republic side). In this work is mainly focus on the calculation of installed performance in individual locations (and also the calculation of achievable performance in these locations), machinery design (for the use of selected sets from Hydrohrom company) and the way the configuration of the power switch. If it is in those places, řeším even more possibilities of this construction is splavnění view of the river, especially in the field of Hodonin - Lanžhot. In addition, deals with the design of line side cubicle of each switch to local distribution networks (draft routes). In the last phase deals with the size of the production in each generation, calculations of costs of constructing these plants, approximate calculation of the production (of the flows of 2007) and time of return on your investment in the construction.
Water energy potential in breeding tanks
Schittenhelm, Dominik ; Radil, Lukáš (referee) ; Morávek, Jan (advisor)
The thesis is divided in several parts. The first part is theoretical and its main focus is the description of hydroenergy and the theory regarding water turbines and their potential use in small hydro powerplants.The second part describes micro hydroelectric power plant design in fishery Bělidlo. It begins with calculation of the waterflow rate based on the performed measurements. The thesis further describes the actual design of Banki turbine with generator and gear unit selection. The last part of the work deals with estimating construction costs and production of electricity and also of awaiting investment return time.
Small hydro power plant restoration project
Morávek, Jan ; Bartošík, Tomáš (referee) ; Radil, Lukáš (advisor)
This thesis summarizes the basic theoretical knowledge concerning of small hydro power plants. It describes the current state of small hydro power plant, analyzes the current solution and its drawbacks. The thesis further decribes options of possible improvement using suitable expansion. The last part of the work deals with an estimated production of electricity after the reconstruction, the approximate investment costs and the estimated time of the investments return.
Water energy potential in breeding tanks
Schittenhelm, Dominik ; Radil, Lukáš (referee) ; Morávek, Jan (advisor)
The thesis is divided in several parts. The first part is theoretical and its main focus is the description of hydroenergy and the theory regarding water turbines and their potential use in small hydro powerplants.The second part describes micro hydroelectric power plant design in fishery Bělidlo. It begins with calculation of the waterflow rate based on the performed measurements. The thesis further describes the actual design of Banki turbine with generator and gear unit selection. The last part of the work deals with estimating construction costs and production of electricity and also of awaiting investment return time.
Small hydro power plant restoration project
Morávek, Jan ; Bartošík, Tomáš (referee) ; Radil, Lukáš (advisor)
This thesis summarizes the basic theoretical knowledge concerning of small hydro power plants. It describes the current state of small hydro power plant, analyzes the current solution and its drawbacks. The thesis further decribes options of possible improvement using suitable expansion. The last part of the work deals with an estimated production of electricity after the reconstruction, the approximate investment costs and the estimated time of the investments return.
Project of small hydroelectric power station
Vašková, Jana ; Belatka, Martin (referee) ; Matoušek, Antonín (advisor)
Bachelor's thesis on „Project small hydroelektric power station“ which submitted the proposal is focused on hydroelectric power in the selected location. Home is focused on a general treatise on the sources from which it is possible to get electricity, while the plants and their uses, especially water. The following chapters are characterized by locality selected for the implementation of the project construction and SHP to two aspects. First, in terms of its location in the landscape and secondly in terms of technical parameters. Furthermore, in this part of the proposal dealing alone power plants, for which two options are proposed. Option A, where the operation SHP considered two sets and variant B with the proposal of one generator. In their own chapter of Electrical SHP is giving elektrotechnic power arrangement, including how performance will be out of power in the network. The final part of the work concerns the evaluation of the economic project, the design of construction SHP.
Study of the small water power plant which is situated in the middle and lower reach of river Morava
Dočkal, Jiří ; Malý, Jiří (referee) ; Matoušek, Antonín (advisor)
The present thesis deals with the description of the current state on the course of Morava river from small hydro Kromeriz after a small water plant Hodonin. Subsequently, I deal with the description of search of weir plants and weirs for the construction of small hydropower (especially their heads, structures and, where appropriate, possible adaptation). Then I deal with completion new hydroelectric plants on this founded weir plants and weirs which are in section between the small hydroelectric power Kromeriz and Lanžhot city on the Czech Republic side (Brodské on the Slovak Republic side). In this work is mainly focus on the calculation of installed performance in individual locations (and also the calculation of achievable performance in these locations), machinery design (for the use of selected sets from Hydrohrom company) and the way the configuration of the power switch. If it is in those places, řeším even more possibilities of this construction is splavnění view of the river, especially in the field of Hodonin - Lanžhot. In addition, deals with the design of line side cubicle of each switch to local distribution networks (draft routes). In the last phase deals with the size of the production in each generation, calculations of costs of constructing these plants, approximate calculation of the production (of the flows of 2007) and time of return on your investment in the construction.

Interested in being notified about new results for this query?