National Repository of Grey Literature 13 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Technological stage of the rough superstructure of the apartment building Hálkova Brno
Jedlička, Petr ; Nečasová, Barbora (referee) ; Doubek, Rostislav (advisor)
This bachelor's thesis focuses on the rough top construction of an apartment building on Hálkova Street in Brno. The thesis includes a technical report, a situation with broader traffic relations, site facilities, a bill of quantities for the technological stage, technological regulations, inspection and test plans. In addition, occupational health and safety for rough top construction is addressed. The last two chapters include a developed itemized budget for the rough top construction and a comparison of different materials for the vertical structures.
Multifunctional House - project planning and management of construction
Krč, Jan ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
This master´s thesis deals with project planning and management of construction of multifunctional building. The main part of thesis are budget of object and schedules of work, which contain realization of reinforced concrete structure and other related works. Another part of thesis deals with the technical regulations about the implementation of horizontal and vertical parts of reinforced concrete structure and from finishing works about realization of inside plasters. Following this part there is design and schedule of using of appropriate building machines and small machinery for their implementation, design of site equipment, quality assurance of works performed, safety of work and minimization of environmental impact. The thesis contains also proposal of contract of work. This work does not deal with substructure of multifunctional building, because this is solved in bachelor thesis.
RESIDENTAL BUILDING SLAVKOV U BRNA. TECHNOLOGICAL PHASE OF FINISHING WORKS.
Šmerda, Michal ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
In the thesis I deal with the internal finishing work of a residential building in Slavkov u Brna. I elaborated in detail the technical regulations for the implementation of internal partition walls, interior plaster and floor structures. For floor structures I developed to compare the spreading layers under which I has elected a suitable material for this construction. This part is followed by the appropriate machine assembly, quality control work, the draft site facilities and transport links. I has also drawn up a sustainability plan object, construction budget and schedule of work.
Multifunctional House, Prague street Orebická, technological phase finishing
Karásek, Roman ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The bachelor thesis deals with final works of multifunctional house. The building located in the Prague on the Orebická Street, is completely new building of 20 flats and underground parking and ground floor store. The aim of this thesis is to analyse the budget for the technological phase and timeframe. Also discussed are technological regulations concerning plastering, flooring and tiling. The author recommends construction machines, building site planning, storage of materials and safety at work including minimalising the impact on the environment.
Implementation of finishing works - Office building in Kolín
Pospíšilová, Izabela ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This bachelor‘s thesis deals with technological stage of finishig works of office building in Kolín – Zálabí. Especially, I focused on implementation of interior plaster different technologies and comparsion using Build Power S and Contec. Also, the thesis deals with the making of plasterboard partition including schemes of their connection. Also mechanical assembly, control and test plans, and safety and health during work are processed for selected building processes. The work also includes construction site.
Project
Karásek, Jakub ; Dvořák, Miloslav (referee) ; Šlanhof, Jiří (advisor)
This diploma thesis deals with processing of technological preparation of the polyfunctional building in Vyškov. The work includes a technical report, a time and financial plan of the construction, a study of the implementation of the main technological stages and an itemized budget for the main building. It also solves the project site equipment including design of construction machinery. It further elaborates the technical regulations for interior plaster, floor design and stacked ceiling for which a control and test plan is developed.
Implementation of warehouses in Brno Podoli, alternative solutions envelope
Boucník, Jan ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This bachelor thesis deals with the variant solution envelope warehouse and office building in Brno Podolí. The first variant is designed as a skeletal structure with masonry infill made of aerated concrete blocks Ytong with external thermal insulation composite system. Also there are dealt with internal plaster and filling holes. The first variant includes technical report, technological specifications, the situation of building with wider relationships routes, bills of quantities, itemized budget, principles of organization of construction, technical report for site equipment, time schedule, design mechanical assembly, inspection and test plans, safety and health work, assessment of thermal cladding, drawing of site preparation and drawing details. The second variant is also designed as a skeleton construction, but as sheathing circuit will be used for facade sandwich Kingspan panels. Part of the second variant are the technological specifications, bill of quantities, itemized budget proposal mechanical assemblies, time schedule, drawing of the site preparation. Both variants will be compared in terms of time, financial, technology, machine designs and building equipment.
Project
Karásek, Jakub ; Dvořák, Miloslav (referee) ; Šlanhof, Jiří (advisor)
This diploma thesis deals with processing of technological preparation of the polyfunctional building in Vyškov. The work includes a technical report, a time and financial plan of the construction, a study of the implementation of the main technological stages and an itemized budget for the main building. It also solves the project site equipment including design of construction machinery. It further elaborates the technical regulations for interior plaster, floor design and stacked ceiling for which a control and test plan is developed.
Implementation of finishing works - Office building in Kolín
Pospíšilová, Izabela ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This bachelor‘s thesis deals with technological stage of finishig works of office building in Kolín – Zálabí. Especially, I focused on implementation of interior plaster different technologies and comparsion using Build Power S and Contec. Also, the thesis deals with the making of plasterboard partition including schemes of their connection. Also mechanical assembly, control and test plans, and safety and health during work are processed for selected building processes. The work also includes construction site.
Multifunctional House, Prague street Orebická, technological phase finishing
Karásek, Roman ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The bachelor thesis deals with final works of multifunctional house. The building located in the Prague on the Orebická Street, is completely new building of 20 flats and underground parking and ground floor store. The aim of this thesis is to analyse the budget for the technological phase and timeframe. Also discussed are technological regulations concerning plastering, flooring and tiling. The author recommends construction machines, building site planning, storage of materials and safety at work including minimalising the impact on the environment.

National Repository of Grey Literature : 13 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.