Construction Project for Implementation of Multifunctional Building in Brno
Čačaný, Lukáš ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The main subject of this diploma thesis is a construction technological project of preparation and realization multifunctional building in Brno on Trugeněvova street. It is a new construction of the main building. It provides a technical report on the construction technology project, transport relations for the transport of materials and machinery to the construction site, following technical report of construction site equipment, construction technology study, design of machinery and last but not least elaboration of technological regulation for the execution of monolithic structures. Furthermore, the chapters on health and safety protection at work on the construction site, as well as the LEED certification system and the financial and time plan of the selected stage are elaborated.
Educational and counseling center Open garden NGOs in Brno - construction technology project
Marková, Veronika ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is solving of the construction project of the administrative building "Educational and consulting center Open Garden of NGO in Brno" The building is designed as three-storey reinforced concrete skeleton with a flat vegetation roof and a light cladding. The diploma thesis includes technological prescriptions for the assembly of the light cladding and for window installation, inspection and quality plans, design of machine assembly, site equipment project, item budget, etc.
Construction Technological Project of Building Blocks of Flat Nad Městem
Vopršalová, Tereza ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The diploma thesis deals with construction and technological preparation of apartment buildings in „Nad Městěm“ locality in Nové Město na Moravě. The buildings have four above-ground floors and one underground floor with garages. This work contains a technical report of a construction project, a coordination situation with broader transport routes, a time and financial plan, a study of the implementation of the main technological stages, a project of the building site, the design of the main building machines and mechanisms, the cross building budget, the technological regulations, the control and test plans and specialized assignment of the noise study.
The Development of the Building of the Kindergarten in Brno - Ivanovice, civil technological project.
Pivcová, Tereza ; Hrdličková, Eliška (referee) ; Kovářová, Barbora (advisor)
Subject of this master thesis is the structural and technological support for the construction of nursery school in Brno Ivanovice. The aim of master thesis is to design time, financial and material resources. The thesis contains technical report, time schedule, building-site, technological standard, control and quality inspection plan and study of realization of the main stages. Part of the thesis is trade’s specialization.
Construction-technological project of the building in the area of Rotana
Kadlec, Michal ; Brandtner, Michal (referee) ; Vlčková, Jitka Laura (advisor)
The aim of the diploma thesis is to process a construction-technological project of the building in the area Rotana. The aim of the thesis is to propose a suitable implementation procedure of the building. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the main construction phase realization, plan for securing material resources, technical report, time and financial object plan. The thesis also focused on the comparison bracing of foundation with the slopes.
Residential complex Troubsko - construction technology plan
Jurák, Ondřej ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is to elaborate a selected part of the construction technology plan for the Residential complex Troubsko. Specifically, it is focused on a pair of mirror-image apartment buildings marked SO 12.11 and SO 12.12. The building is located in the area of a former pond, which was backfilled in the past. The foundation strips are therefore placed on vibrated gravel pillars. The structure of the building is proposed as a traditional masonry building, the horizontal load-bearing structures consists of the cast-in-place reinforced concrete floor and the roof structure is designed as a flat roof. The thesis consists in a technical report pertaining to the construction technology plan, evaluation of transport routes, technological regulation for the cast-in-place reinforced concrete floor above 1PP and a time schedule for rough construction. Also elaborated are construction site equipment including a drawing and text part, a control and test plan, itemized budget with bill of quantities for rough construction, design of machine sets and work safety solutions are elaborated.
Realization of the Roof Covering of the Apartment Building in Morkovice
Bubeníčková, Barbora ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The bachelor thesis describes the issue of roofing of a new building in Morkovice. The project includes the technical report, the situation of the building site equipment, the technological regulation, the time schedule of the construction, the design of the machine assembly, the safety of the work during the given technological stage of the roofing and the protection of the wooden elements against deterioration.
Sports hall, entrance portal implementation
Vondrák, Tomáš ; Krejčí, Vlastimil (referee) ; Vlčková, Jitka Laura (advisor)
The aim of this bachelor thesis was to develop a construction-technological project for a technological phase of the project realization - the construction of a sports hall entrance portal in Jinřichův Hradec. The construction-technological project deals mainly with the technological procedures for boarding, fortifying and concreting of the vertical monolithic construction of the entrance portal. The project also includes a time schedule of the construction, budget, project of a device, controling and piloting plans for operation pursuing, principles of construction organization and solution of safety operation. The project also contains a design of the constructional situation, an arrangement‘s building site drawing as well as the drawing of the boarding.
Construction technological expansion project of sheltered workshop in Trinec
Gwóźdź, Dariusz ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
The subject of graduation thesis is a building-technological study of production and warehousing hall and headquarters of Ergon protected workshops in Třinec. The work is prepared on the basis of the project documentation. This consists of 8 building objects( 2 main building objects and 6 engineering objects). Building object SO 01-assembly and warehousing hall will be used for installation of assembly lines for simple mounting of imported parts and for semi automatic painting line equipment. Building object SO 02- headquarters building will be used for social activities of employees (WC. showers, social room , cloak rooms) and office premises. The main aims of graduation thesis are : project of construction site equipment including of time and economical evaluation, time schedule and financial plan for objects, study of main phases of project realisation for objects SO 01 and SO 02, project of main building machines including their radius( reach), time schedule of building object SO 02, technological prescript for steel construction preparation of object SO 01 with control and check plan.
Administrative building with operational warehouses - construction technology project
Hirsch, Roman ; Boháček, Adam (referee) ; Biely, Boris (advisor)
The focus of this thesis is on the description of realization of administrative building with operational warehouses in Brno. The thesis consists of report on construction and technology, study of the realization of the main technological stages, technical report on site technologies, technical report on wider transportation connections, proposal for the machinery assembly, time schedule, detailed budget, technological guidelines for rein-forced concrete ceiling, control and exam plan for reinforced concrete, report on safety and health protection on construction site, environmental requirements, and in lastly also comparisons of material of contact thermal insulation system, crane proposal, noise study. The thesis consist 15 annexes.