National Repository of Grey Literature 15 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Construction-technological project of the Kollárova residence
Škorňa, Martin ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the diploma thesis is a construction technology study of the proces of realization. The aim of the thesis is to design a suitable technological procedure for the construction of the main building with a focus on feasibility. The content of the diploma thesis is the design of a suitable solution of partial processes, mechanization and organization of work leading to the successful realization of the object. The diploma thesis is focused on the feasibility of works concerning the variable way of ensuring the stability of the walls of the building pit in the existing urban area, the design of the machine assembly, the budget item, the costs of the construction site equipment and, last but not least, the safety plan.
Apartment buildings in Pardubice - Project planning and management
Skřivánek, Jan ; Sedlák,, Petr (referee) ; Motyčka, Vít (advisor)
The final thesis contains selected parts of construction technological project, this project are defined by a apartment building complex in Pardubice, Dubinská. This thesis deals with first two buildings with four flours and a basement. Coordination site plan, time and financial schedule including machinery setting, a study of main technological phases, construction site facility project, main technological machinery design, technological standard and time schedule, technological regulation for basement monolithic constructions, inspection and trial schedule with drawing of facing to it are regarded as parts of construction technological project.
Industry Hall Moravany - Selected parts of the construction-technology plan
Hetteš, Adrián ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
The aim of this diploma thesis is the preparation of a constructional-technology study into the realization of carcass industry hall in the village Moravany u Brna. An itemized budget has been created for the framework alongside a proposal for the main building mechanisms, time management, health and safety plan and environmental management. The thesis is focused on detailed realization of the precast concrete frame which outlines technological regulation and inspection and a trial plan. The thesis further deals with site equipment, possible public transport routes into specific areas and how the main technological stages are developed. In creation of this thesis were used constructional-technological softwares BuildPowerS, CONTEC, ArchiCAD, AutoTurn, Vehicle Tracking and Hluk+9.
Construction technology project of International Clinical Research Center in Brno
Brůžek, Zdeněk ; Čech, Václav (referee) ; Venkrbec, Václav (advisor)
The diploma thesis deals with construction and technological study of II. stage of construction of the international clinical research center in Brno. The aim is to design an appropriate technological process of construction of the main building and resources for construction. This work contains technological study of realization of the main technological stages of the main construction building and the technical report for site equipment with drawings and time schedule. The thesis is also focused on the installation of gypsum construction and clean room construction of the operating room, design of mechanical equipment and instructions for usage of the building.
Implementation of Production Hall in Holešov
Ševela, Ondřej ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.
Residence Erasmus - preparation, implementation and project management
Dokoupil, Jan ; Brno,, Alexander Lazar, IMOS (referee) ; Hrazdil, Václav (advisor)
This diploma thesis deals with the construction of a residential building The Erasmus Residence. This work includes a technical report of the issue solved, construction site installations of three phases of construction, which are groundwork, rough top construction and finishing. The work includes drawings of construction site installations for all these stages. The thesis also includes technological specification for thermal insulation systems including scaffolding construction, timing of construction, inspection and quality test plan and itemized budget.
Construction technological project of elementary school Otevřená, Brno - Žebětín
Novák, Martin ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The constructive – technological project of elementary school in town district Brno – Žebětín, contains the technical report, the assessment of the wider transport relations, the time and financial plan of buildings, technological project of the site equipment, the main construction machines and mechanisms, the technological prescription for the underground construction, the inspection and test plan for the underground construction, the calculation of buildings for the objects, the safety report and the contract for work.
Preparation for the implementation of a sports hall at the elementary school in Rajhrad
Kryštof, Filip ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The subject of my diploma thesis is preparation for the implementation of sports hall at the elementary school in Rajhrad. The aim of this thesis is to elaborate construction technology plan for the main building marked SO.01 – Sports hall, focusing on time management, technology, and resources of implementation. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, technological regulations, inspection and testing plan for the implementation of precast concrete frame. Also elaborated are calculation of construction according to THU, an occupational health and safety plan, a noise study and comparative study for a lifting mechanism.
Construction-technological project of the Kollárova residence
Škorňa, Martin ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The subject of the diploma thesis is a construction technology study of the proces of realization. The aim of the thesis is to design a suitable technological procedure for the construction of the main building with a focus on feasibility. The content of the diploma thesis is the design of a suitable solution of partial processes, mechanization and organization of work leading to the successful realization of the object. The diploma thesis is focused on the feasibility of works concerning the variable way of ensuring the stability of the walls of the building pit in the existing urban area, the design of the machine assembly, the budget item, the costs of the construction site equipment and, last but not least, the safety plan.
Implementation of Production Hall in Holešov
Ševela, Ondřej ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.

National Repository of Grey Literature : 15 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.