National Repository of Grey Literature 6 records found  Search took 0.02 seconds. 
Suspension footbridge across the Elbe River
Gregor, Petr ; Kocourek, Petr (referee) ; Stráský, Jiří (advisor)
The objective of this master´s thesis is a design of suspension footbridge across the Elbe river. The footbridge is suspended construction by three spans. The brick deck is supported on the outer edges and it is kept in a parabolic arc. The suspension cables are kept at two inclined levels. The model is implemented in the program ANSYS. The solution is non-linear. The designe is according to the europien standart.
Footbridge across the expressway
Páleník, Petr ; Kocourek, Petr (referee) ; Nečas, Radim (advisor)
The aim of this master thesis is a design of the pedestrian bridge across the highway. The bridge is formed by a slab structure of 6 spans with lenghts from 9 to 51 m. The main spans are suspended on a V shape pylon. The deck of the span across the highway is assambled of precast segments and composite deck slab. The deck is in the lenghtways kept in the parabolic arch. The model of the construction is made in software ANSYS, the solution was done non-linear. The design and assessment are according to the europien standard.
Suspension footbridge
Černý, Jan ; Kulhavý,, Tomáš (referee) ; Nečas, Radim (advisor)
The objective of this master's thesis is a design of suspension footbridge. The footbridge is suspended construction of stress ribbon by one span. The brick deck is supported on the edges and it is kept in a parabolic arc. The suspension cables are kept at two inclined levels. The model lengthways is implemented in the program ANSYS, by non-linear solution. The model crosswise is implemented in the program SCIA ENGINEER 2011. The design is according to relevant current standart.
Footbridge across the expressway
Páleník, Petr ; Kocourek, Petr (referee) ; Nečas, Radim (advisor)
The aim of this master thesis is a design of the pedestrian bridge across the highway. The bridge is formed by a slab structure of 6 spans with lenghts from 9 to 51 m. The main spans are suspended on a V shape pylon. The deck of the span across the highway is assambled of precast segments and composite deck slab. The deck is in the lenghtways kept in the parabolic arch. The model of the construction is made in software ANSYS, the solution was done non-linear. The design and assessment are according to the europien standard.
Suspension footbridge
Černý, Jan ; Kulhavý,, Tomáš (referee) ; Nečas, Radim (advisor)
The objective of this master's thesis is a design of suspension footbridge. The footbridge is suspended construction of stress ribbon by one span. The brick deck is supported on the edges and it is kept in a parabolic arc. The suspension cables are kept at two inclined levels. The model lengthways is implemented in the program ANSYS, by non-linear solution. The model crosswise is implemented in the program SCIA ENGINEER 2011. The design is according to relevant current standart.
Suspension footbridge across the Elbe River
Gregor, Petr ; Kocourek, Petr (referee) ; Stráský, Jiří (advisor)
The objective of this master´s thesis is a design of suspension footbridge across the Elbe river. The footbridge is suspended construction by three spans. The brick deck is supported on the outer edges and it is kept in a parabolic arc. The suspension cables are kept at two inclined levels. The model is implemented in the program ANSYS. The solution is non-linear. The designe is according to the europien standart.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.