National Repository of Grey Literature 10 records found  Search took 0.00 seconds. 
Realization of the rough construction of a residential building in Brno
Matěj, Kryštof ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The subject of the Bachelor Thesis is the technological stage of the superstructure carcass of an apartment house in Brno. For this stage, the following documents have been worked out: the construction progress schedule, the item budget with the bill of quantities, the technical report and the drawings of the site plant, the technological regulation, the assessment of transport routes, the design of the machine setup, the inspection and test plan, and the occupational safety.
Construction-technological project of Ayurvedic pavilion in Počátky
Lisý, Ondřej ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The diploma thesis deals with realization of an Ayurvedic pavilion in the premises of Saint Katerina Resort. The proposed new compound is designed to extend the leisure services of the Saint Katerina Resort in Počátky. The feasibility study of the main technological stages of the project is solved in this diploma thesis. The construction of the object is described in the technical report. Both a detailed itemized budget of the construction and a detailed timetable to show the duration of each process is elaborated for the construction technology project. Futhermore, the design of site construction equipment, design of machine assembly, time deployment of machines and staff balance is elaborated. The project includes a technological regulation of the realization of the skeleton supporting frame structure and both control and test schedule. The work safety for the assembly of the wooden building supporting frame is composed.
Technological phase of the upper structure of the nursery building in Habry
Štípa, David ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the bachelor thesis is a technological solution of rough upper structure of a kindergarden in Habry. The main aim of the thesis is the brick support construction and the ceiling contruction. The thesis also includes a site layout with broader relations to traffic routes, budget for the technological procedure, technical report, technical report for site equipment, technological directive for the construction of ceiling and support brick structure, Inspection and check plan, time schedule, concept of machinery setup and safety and protection of health during work.
Extension of the building for physical and tactical training in Brno – construction technological project
Štípa, David ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The aim of the master thesis is a technological solution of structure for Police of Czech republic. The main aim of the thesis is the support construction and the ceiling contruction. The thesis also includes a site layout with broader relations to traffic routes, budget for the technological procedure, technical report, technical report for site equipment, technological directive for the construction of ceiling and ground works, Inspection and check plan, time schedule, concept of machinery setup and safety and protection of health during work
Resort Johanka - realization of rough upper construction
Lisý, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor´s thesis deals with built-in realization with attic accommodation for guests of Resort Johanka´s premises. A new ceiling construction and roofing execution is realized. The thesis contains technology of execution of single constructions in the form of a technological regulation. Building expenses are stated in item budget with a bill of quantities. The duration of particular procedures are shown in the construction schedule. From the security and quality realization point of view plans regarding these aspects are processed.
Extension of the building for physical and tactical training in Brno – construction technological project
Štípa, David ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The aim of the master thesis is a technological solution of structure for Police of Czech republic. The main aim of the thesis is the support construction and the ceiling contruction. The thesis also includes a site layout with broader relations to traffic routes, budget for the technological procedure, technical report, technical report for site equipment, technological directive for the construction of ceiling and ground works, Inspection and check plan, time schedule, concept of machinery setup and safety and protection of health during work
Construction-technological project of Ayurvedic pavilion in Počátky
Lisý, Ondřej ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The diploma thesis deals with realization of an Ayurvedic pavilion in the premises of Saint Katerina Resort. The proposed new compound is designed to extend the leisure services of the Saint Katerina Resort in Počátky. The feasibility study of the main technological stages of the project is solved in this diploma thesis. The construction of the object is described in the technical report. Both a detailed itemized budget of the construction and a detailed timetable to show the duration of each process is elaborated for the construction technology project. Futhermore, the design of site construction equipment, design of machine assembly, time deployment of machines and staff balance is elaborated. The project includes a technological regulation of the realization of the skeleton supporting frame structure and both control and test schedule. The work safety for the assembly of the wooden building supporting frame is composed.
Technological phase of the upper structure of the nursery building in Habry
Štípa, David ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the bachelor thesis is a technological solution of rough upper structure of a kindergarden in Habry. The main aim of the thesis is the brick support construction and the ceiling contruction. The thesis also includes a site layout with broader relations to traffic routes, budget for the technological procedure, technical report, technical report for site equipment, technological directive for the construction of ceiling and support brick structure, Inspection and check plan, time schedule, concept of machinery setup and safety and protection of health during work.
Resort Johanka - realization of rough upper construction
Lisý, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor´s thesis deals with built-in realization with attic accommodation for guests of Resort Johanka´s premises. A new ceiling construction and roofing execution is realized. The thesis contains technology of execution of single constructions in the form of a technological regulation. Building expenses are stated in item budget with a bill of quantities. The duration of particular procedures are shown in the construction schedule. From the security and quality realization point of view plans regarding these aspects are processed.
Realization of the rough construction of a residential building in Brno
Matěj, Kryštof ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The subject of the Bachelor Thesis is the technological stage of the superstructure carcass of an apartment house in Brno. For this stage, the following documents have been worked out: the construction progress schedule, the item budget with the bill of quantities, the technical report and the drawings of the site plant, the technological regulation, the assessment of transport routes, the design of the machine setup, the inspection and test plan, and the occupational safety.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.