National Repository of Grey Literature 6 records found  Search took 0.00 seconds. 
Cost Management in the Company
Svorad, Michal ; David, Jan (referee) ; Kocmanová, Alena (advisor)
My bachelor thesis is focused on the analysis of costs in the company TURCK, Inc. which is based in Hradec Králové. The first part describes the theory necessary to understand the second part, where are evaluated data from the company. In the final part I suggest changes that will lead to deal better with the management of costs.
The budget fot the award of public works contracts
Kulich, Jan ; Comorek, Martin (referee) ; Marková, Leonora (advisor)
This master's thesis follows up a theme of budgeting for valuation of public construction contracts. It examines in details how to draw up a budget and optimize it to the concrete public construction contract. The thesis is structured in three fundamental chapters. The opening chapter describes theoretical grounds of public construction contracts from the contractor's point of view. Also basic methods how to draw up a budget are described in the first chapter. The second chapter covers a description of a systematic approach how to draw up a cost effective budget, throughout structural cost saving activities. In the third chapter the systematic approach is put in place on concrete public construction contract. The goal of the thesis is to draw up a competitive budget which won't be rejected from the competition for its exceptionally low price at the same time.
Valuation of Steel Construction.
Charvát, Lukáš ; Ing.Jiří Sachl (referee) ; Marková, Leonora (advisor)
This diploma thesis mainly deals with valuation of steel structures from the perspective of an investor. Today there are several types of steel constructions, which assemble is partly done in workshop, so called “bridge-workshop”, and the rest of the assembling is done directly at the building site. That is the main difference from the construction industry. This fact makes financial valuation of whole thesis very difficult, because construction companies often do not state detailed breakdown of their activities. The main goal of this thesis is to suggest procedure how to value steel constructions in a phase of documentation processing, workshop production, transportation and technological equipment construction at the site.
Cost Management in the Company
Svorad, Michal ; David, Jan (referee) ; Kocmanová, Alena (advisor)
My bachelor thesis is focused on the analysis of costs in the company TURCK, Inc. which is based in Hradec Králové. The first part describes the theory necessary to understand the second part, where are evaluated data from the company. In the final part I suggest changes that will lead to deal better with the management of costs.
The budget fot the award of public works contracts
Kulich, Jan ; Comorek, Martin (referee) ; Marková, Leonora (advisor)
This master's thesis follows up a theme of budgeting for valuation of public construction contracts. It examines in details how to draw up a budget and optimize it to the concrete public construction contract. The thesis is structured in three fundamental chapters. The opening chapter describes theoretical grounds of public construction contracts from the contractor's point of view. Also basic methods how to draw up a budget are described in the first chapter. The second chapter covers a description of a systematic approach how to draw up a cost effective budget, throughout structural cost saving activities. In the third chapter the systematic approach is put in place on concrete public construction contract. The goal of the thesis is to draw up a competitive budget which won't be rejected from the competition for its exceptionally low price at the same time.
Valuation of Steel Construction.
Charvát, Lukáš ; Ing.Jiří Sachl (referee) ; Marková, Leonora (advisor)
This diploma thesis mainly deals with valuation of steel structures from the perspective of an investor. Today there are several types of steel constructions, which assemble is partly done in workshop, so called “bridge-workshop”, and the rest of the assembling is done directly at the building site. That is the main difference from the construction industry. This fact makes financial valuation of whole thesis very difficult, because construction companies often do not state detailed breakdown of their activities. The main goal of this thesis is to suggest procedure how to value steel constructions in a phase of documentation processing, workshop production, transportation and technological equipment construction at the site.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.