National Repository of Grey Literature 8 records found  Search took 0.00 seconds. 
fire station
Peňáz, Lubomír ; Mátl,, Miroslav (referee) ; Moudrý, Ivan (advisor)
The content of this thesis is the design layout and construction of the building of new fire station in South Moravian Region. It is an object split into two interconnected parts: administrative - two-storey, basementless garage for trucks - single-storey, basementless The object is used to perform the services of eight firefighters per shift and one full-time worker. Architecture was chosen so that the object is functionally meet the requirements of firefighters on duty at both organizational (work on PS) and at the operational (exit) procedure. The building is covered with a flat roof, attic walled building on the peripheral wall with white facade and symbols accentuating the purpose of the building. The inner workings of the object are designed to meet the performance demands of service 24ti - hour shifts. The building is brick, based on the footings and load distribution base. The roof structure is made of reinforced concrete load-bearing concrete slab with heat-waterproofing layers classical arrangement of layers. The building is insulated ETICS. This - the operational part is located on the 1st and 2nd floor of the south-western part of the building, single-storey garage built for trucks in the northeastern part.
Fire station
Kaňa, Josef ; Kacálková, Lenka (referee) ; Kacálek, Petr (advisor)
The diploma thesis named Fire Station deals with project documentation at the level of construction execution documentation for a fire station. The building is located on the outskirts of Holešov in the part called Všetuly. The building is located in close proximity to the existing production plants, the local industrial zone, which is accessible from outside the city and close to the approach to the under-construction D49 and part of the city bypass. The project deals with the location of the building on the land, including paved areas and their connection to existing roads, the project also includes the location of sports fields for physical training. The building is designed as a two-story building with five parking spaces for emergency vehicles, where this space extends over both floors. On the 1st floor, the technical facilities of the station with storage and a dirty changing room are designed. On the 2nd floor, emergency rooms and offices of serving firefighters with hygienic facilities are designed. The station is designed according to the Fire Protection Act size P2 for a JPO I category unit with 24 serving firefighters in three shifts. As part of the proposal, vehicles at the existing unit were considered AZ – 30 M1Z Novus, CAS 3 – T815, CAS 20 – S2Z MB, KHA, TA – MAN, Škoda Kamiq.
The Screw conveyor
Hadraba, Tomáš ; Pokorný, Přemysl (referee) ; Hloska, Jiří (advisor)
This bachelor thesis contains design and constructional solution of the horizontal screw conveyor which is used to transport hydrated lime according to set parameters. In thesis is given a calculation of the main dimensions, drive, conversion option and strength check of exposed parts of conveyor. The drawings are composed of the assembly of the proposed facility and individual details. The document was drawn up on the basis of technical report.
Fire station, Svitavy
Navrátil, Michal ; Nováková, Eva (referee) ; Kolář, Radim (advisor)
The diploma thesis elaborates the project documentation for the construction of a new apartment of central fire station type C1 with the administrative part of the Territorial Department. The fire station is technologically linked to the second building SO.02 the technical and technological background of the fire station. The building is situated on the eastern edge of Svitavy. The building is non-cellular, it has three floors and a flat green roof. Three floors fulfilling matter with mainly administrative function is connected with two floors blocks fire station with an indoor gym. Above the floor containing garages for emergency vehicles facilities for the emergency unit are placed with a curtain that creates fading of the emergency door. The matter of the gym is optically separated from the station and highlighted with a volume narrow neck and height elevation. In the station there are training places and places for general physical preparation. The buildings are located in a sloping terrain. The ground fire station has a heliport. The establishment supporting columns of the building are for made of prefabricated calyx, and are concreted into monolithic foundation pads. Infill wall vertical bearing and non-bearing structures are designed from clay blocks type THERM. The bearing system is reinforced concrete prefabricated frame. Horizontally bearing structures are designed from prestressed hollow core slabs. The building envelope is made of a curtain wall in dark grey and red combined with a light contact thermal insulation system used on the indoor gym. The envelopes are in the administrative part and the part of the station divided by a glazed area. In the workshops and technology room the envelope is divided by lamellae. Usually there are 13 firemen during one shift, in three shifts there work 39 firemen all together. There are supposed to be 17 employees in the administrative department.
Fire station, Svitavy
Navrátil, Michal ; Nováková, Eva (referee) ; Kolář, Radim (advisor)
The diploma thesis elaborates the project documentation for the construction of a new apartment of central fire station type C1 with the administrative part of the Territorial Department. The fire station is technologically linked to the second building SO.02 the technical and technological background of the fire station. The building is situated on the eastern edge of Svitavy. The building is non-cellular, it has three floors and a flat green roof. Three floors fulfilling matter with mainly administrative function is connected with two floors blocks fire station with an indoor gym. Above the floor containing garages for emergency vehicles facilities for the emergency unit are placed with a curtain that creates fading of the emergency door. The matter of the gym is optically separated from the station and highlighted with a volume narrow neck and height elevation. In the station there are training places and places for general physical preparation. The buildings are located in a sloping terrain. The ground fire station has a heliport. The establishment supporting columns of the building are for made of prefabricated calyx, and are concreted into monolithic foundation pads. Infill wall vertical bearing and non-bearing structures are designed from clay blocks type THERM. The bearing system is reinforced concrete prefabricated frame. Horizontally bearing structures are designed from prestressed hollow core slabs. The building envelope is made of a curtain wall in dark grey and red combined with a light contact thermal insulation system used on the indoor gym. The envelopes are in the administrative part and the part of the station divided by a glazed area. In the workshops and technology room the envelope is divided by lamellae. Usually there are 13 firemen during one shift, in three shifts there work 39 firemen all together. There are supposed to be 17 employees in the administrative department.
fire station
Peňáz, Lubomír ; Mátl,, Miroslav (referee) ; Moudrý, Ivan (advisor)
The content of this thesis is the design layout and construction of the building of new fire station in South Moravian Region. It is an object split into two interconnected parts: administrative - two-storey, basementless garage for trucks - single-storey, basementless The object is used to perform the services of eight firefighters per shift and one full-time worker. Architecture was chosen so that the object is functionally meet the requirements of firefighters on duty at both organizational (work on PS) and at the operational (exit) procedure. The building is covered with a flat roof, attic walled building on the peripheral wall with white facade and symbols accentuating the purpose of the building. The inner workings of the object are designed to meet the performance demands of service 24ti - hour shifts. The building is brick, based on the footings and load distribution base. The roof structure is made of reinforced concrete load-bearing concrete slab with heat-waterproofing layers classical arrangement of layers. The building is insulated ETICS. This - the operational part is located on the 1st and 2nd floor of the south-western part of the building, single-storey garage built for trucks in the northeastern part.
The Screw conveyor
Hadraba, Tomáš ; Pokorný, Přemysl (referee) ; Hloska, Jiří (advisor)
This bachelor thesis contains design and constructional solution of the horizontal screw conveyor which is used to transport hydrated lime according to set parameters. In thesis is given a calculation of the main dimensions, drive, conversion option and strength check of exposed parts of conveyor. The drawings are composed of the assembly of the proposed facility and individual details. The document was drawn up on the basis of technical report.
The Screw conveyor
Hadraba, Tomáš ; Pokorný, Přemysl (referee) ; Hloska, Jiří (advisor)
This bachelor thesis contains design and constructional solution of the horizontal screw conveyor which is used to transport hydrated lime according to set parameters. In thesis is given a calculation of the main dimensions, drive, conversion option and strength check of exposed parts of conveyor. The drawings are composed of the assembly of the proposed facility and individual details. The document was drawn up on the basis of technical report.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.