|
Implementation of the top office building in Brno
Hradečný, Štěpán ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This thesis deals with the technological stage of the gross superstructure of an office building in Brno, which is implemented using a complete system solution. It includes logical and chronological following the successful implementation of this project. It contains the engineering report focusing on rough superstructure, addressing broader transport relations, technical report site equipment, technical note of walls and ceilings, inspection and test plan, machine assembly, safety measures and alternative solutions for the lifting mechanism with another theme.
|
| |
|
Production hall in Brno - construction technology project
Šebelová, Zuzana ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is the construction and technological preparation and implementation of a production and storage hall in Brno. The content of the diploma thesis is a technical report for the construction and technological project, a study of the main technological stages, a project of the construction site equipment, traffic signs about the construction site equipment, as well as two technological regulations, the first for the assembly of the prefabricated reinforced concrete skeleton of the hall and the second for the implementation of the industrial floor with filling. This is followed by the design of the main construction mechanisms, the broader relationships of the transport routes, two inspection and testing plans for the aforementioned technological prescriptions, then a selected part of the health and safety plan, in particular the definition of the main risks and the design of safety measures for the technological processes, as well as a search of the Breeam and Leed sustainability certification of buildings, and the last chapter contains an alternative design for the industrial floor with a price comparison. In addition, a blind itemized budget for the rough top building, a material requirement plan for the selected prescription and other annexes have been prepared.
|
| |
|
Implementation of the top office building in Brno
Hradečný, Štěpán ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This thesis deals with the technological stage of the gross superstructure of an office building in Brno, which is implemented using a complete system solution. It includes logical and chronological following the successful implementation of this project. It contains the engineering report focusing on rough superstructure, addressing broader transport relations, technical report site equipment, technical note of walls and ceilings, inspection and test plan, machine assembly, safety measures and alternative solutions for the lifting mechanism with another theme.
|