National Repository of Grey Literature 132 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Sports Centre in Pardubice, Preparation for Construction
Sikelová, Tereza ; Průcha, Aleš (referee) ; Šlanhof, Jiří (advisor)
The aim of this master's thesis is the elaboration of a preparation of construction implementation of the Sport Center in Pardubice. The construction system of the building is wall-mounted, made of Porotherm blocks. Ceiling structures are made from prefabricated panels. This thesis covers the study of rough construction implementation, the technological regulations and control and testing plan for the implementation of green roof and ventilated facade, construction site equipment, mechanization design, safety aspects, noise study, and comparison of green roofs. Furthermore, the thesis includes the time and financial plan for the construction of the main building structure. The work encompasses a drawing section.
Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice
Ráb, Jakub ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Implementation of Registred Office of Company POLNA corp. s.r.o. in Třinec
Špilínek, Richard ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
This master´s thesis deals with construction-technological project of administrative-production and storage complex in Třinec - Oldřichovice. It´s a new building of the main building, consisting of a two-storey administrative building and a one-storey storage hall, which is complemented by other sub-objects. The master´s thesis solves the realization of the building as a complex whole and in more detail focuses on vertical and horizontal supporting structures, made of steel elements and steel-concrete ceiling structure. An integral part of the project include studies of the realization of the main technological stages of the main building, technological regulations, complemented by assembly schemes, solution of transport routes and proposal of machine assemblies, site equipment design, time schedules, budgets, inspection and test plans and proposal of security measures for selected risks. The work is further supplemented by a specialized area that prepares the design and execution of intra-areal reinforced communications.
Multifunctional center Hlinsko - preparation and realization construction.
Šusták, Miroslav ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
Diploma work Multifunction Centre Hlinsko - preparation and realization of the covers technological studies throughout the building. Diploma work proposes a temporal, financial and material resources. The work included construction budget, schedule of work, technical regulations for demolition, implementation and installation of reinforced concrete ceiling glulam beams. For each technological regulation is developed inspection and test plan. The work includes the project site equipment. Diploma work is based on the technical documents supplied by the designer. The work also includes specialty.
The terraced houses in Svitavy - the construction technology project
Bajerová, Radka ; Klempa, Lukáš (referee) ; Motyčka, Vít (advisor)
The subjects of the thesis are chosen parts of the building technological project for the preparation and realization of the terraced family houses in Svitavy. The solution includes The study of the main technological stages realization, Time schedule and financial plan, The project of the site facilities including design of the main hoisting mechanism. The realization of ceiling construction is described in detail by The technological prescription. The solution also includes a proposal of local and utility roads repairs on the streets Gorkého and U Studeného potoka.
Preparation of realization apartment building in Dvůr Králové nad Labem
Možíš, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
Construction technological project of polyfunktion house in Brno
Kapoun, Pavel ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The diploma thesis deals with the construction technological project of a polyfunctional building in Brno. The project contains schedule, cost estimate, the plan of building site equipment and the proposal for machinery. To be more specific, the work concerns the main building SO01 focusing on the stage of Berlin shoring construction and vertical load-bearing structure. The risk assessment, specialization concerning the sprinkler system and the technology maintenance using reconstruction are also included.
Architectural and technological project of reconstruction surgeries KPRCH University Hospital Brno
Hačka, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this work is to prepare the implementation of the reconstruction and extension of the Teaching hospital Brno Bohunice. Implementation of major technological stages is addressed in building technological study. Work includes selected legal procedures before the start of construction work, such as opening the envelopes and investor-supplier contract for the work. Further work solution contains selected technological processes of each sub-job phases, complemented by technological regulations, proposals for major construction machinery, selected inspection and test plans. As part of my work I will work with subcontractors to perform CFA piles, so I deal with on demand system for subcontractors, notice of award, issuing orders and delivery site for subcontractors. I believe that the subject of occupational health and safety on the jobsite is an important chapter construction and will therefore address the safety and health of people at work drawing up a plan OHS and OHS coordination meetings. Work will also be supplemented by information site equipment, time and financial plans and drawings of all the individual components specified in the Annexes. The content of my work is also a doctoral student competition entitled "Modern technologies and materials", where thoughts about the implementation superaseptických surgeries new technologies. This work will be the content of the text section of the attachments, always mentioned with the name of specialization.
Technological phase substructure - Business center in Ostrava
Toman, Jan ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
Subject of this thesis is the lower gross production technology mall in Ostrava. This work contains exactly technical reports, technological specification, site equipment, mechanical assembly design, scheduling, budgeting, monitoring and test plans, safety and environmental protection.

National Repository of Grey Literature : 132 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.