National Repository of Grey Literature 6 records found  Search took 0.01 seconds. 
Design of Optimization of Častolovice – Solnice Track Section km 9,4 – 11,6
Faltýnek, Petr ; Burda, Petr (referee) ; Plášek, Otto (advisor)
Design of optimization of Častolovice – Solnice track section km 9,4 – 11,6. The proposal to increase the line speed to the maximum possible value, composition of the railway superstructure and a proposal for the type of structure of railway level crossings. In the selected section of the proposed reconstruction of the stop Rychnov nad Kněžnou. Design of reconstruction of drainage.
Analysis of Company Processes in Order to Optimize the Information System
Kuneš, Martin ; Sodomka, Petr (referee) ; Klčová, Hana (advisor)
The first part of thesis is focused on teoretical basis of selected issues, which is importnant for understanding. The following second part deals with the analysis and the current situation of the processes to be optimized. The next chapter of the thesis focuses on the optimization design itself using modern technologies and modified Dynamics NAV 2018 modules.
Design of Reconstruction of Track in km 45,7 - 48,7 Hlinsko v Č. - Žďárec u Skut.
Šatánek, Jan ; Burda, Petr (referee) ; Plášek, Otto (advisor)
Design of railway reconstruction Hlinsko v. Č. – Žďárec u Skut. comprises the design of track section km 45,7 – 48,7, the proposal to increase the line speed to the maximum possible value, the design of an appropriate composition of the railway superstructure and subballast, the design of optimal structure of railway level crossings. The reconstruction of stopping points and of draining is designed in the specified track section.
Analysis of Company Processes in Order to Optimize the Information System
Kuneš, Martin ; Sodomka, Petr (referee) ; Klčová, Hana (advisor)
The first part of thesis is focused on teoretical basis of selected issues, which is importnant for understanding. The following second part deals with the analysis and the current situation of the processes to be optimized. The next chapter of the thesis focuses on the optimization design itself using modern technologies and modified Dynamics NAV 2018 modules.
Design of Reconstruction of Track in km 45,7 - 48,7 Hlinsko v Č. - Žďárec u Skut.
Šatánek, Jan ; Burda, Petr (referee) ; Plášek, Otto (advisor)
Design of railway reconstruction Hlinsko v. Č. – Žďárec u Skut. comprises the design of track section km 45,7 – 48,7, the proposal to increase the line speed to the maximum possible value, the design of an appropriate composition of the railway superstructure and subballast, the design of optimal structure of railway level crossings. The reconstruction of stopping points and of draining is designed in the specified track section.
Design of Optimization of Častolovice – Solnice Track Section km 9,4 – 11,6
Faltýnek, Petr ; Burda, Petr (referee) ; Plášek, Otto (advisor)
Design of optimization of Častolovice – Solnice track section km 9,4 – 11,6. The proposal to increase the line speed to the maximum possible value, composition of the railway superstructure and a proposal for the type of structure of railway level crossings. In the selected section of the proposed reconstruction of the stop Rychnov nad Kněžnou. Design of reconstruction of drainage.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.