National Repository of Grey Literature 63 records found  beginprevious54 - 63  jump to record: Search took 0.01 seconds. 
Manufacturing hall Lysá nad Labem - construction technology project
Bechyně, Petr ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
This thesis deals with the progress in the construction of the manufacturing hall in Lysa nad Labem. Mainly focuses on the technological phase of mounting reinforced concrete frame which is processed technological prescription too. There are also chapters dealt with elements of site facilities, transport relations, machine mechanisms, inspection and controling plan, or ecology and health and safety.
Construction technology project of Retirement Home Brno - Tuřany
Rapant, Radek ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
The thesis is elaborated on the basis of project of the retirement home Brno – Tuřany. The thesis is focused on building technology solutions of construction of the retirement home Brno – Tuřany. The main part of the thesis deals with realization of rough construction DCI, especially with detailed description and draft solution for making the ceilings and elliptical reinforced concrete staircase (tube). Apart from the impressive architectonic draft solution of main staircase of the building, it will be interesting to deal with progress of the whole construction that is divided into three dilatational parts.
Construction and technological project of the production hall in Litomyšl
Patrný, Jan ; Diaz, Yvetta (referee) ; Novotný, Michal (advisor)
This thesis consists of a technological project of the production hall realization in Litomyšl. The main part of the project is a building schedule and a financial plan of the construction itself. Moreover thesis consists of a building site equipment design, construction machinery needed for building and a workplace safety plan. The process of selected realization parts are described in the technological manual and the quality control and inspection plan.
Residential building Hostivar - construction and technological preparation of construction
Hanáček, Patrik ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
The theme of the diploma thesis is elaboration of selected parts of the construction technology project in building block of flats Hostivař. Content of this project is technological solution for realization of this project. It means working on time planning of construction, right using of human, material and machinery sources and controlling system for selected part of the building. In attachment of the diploma thesis, there are also drawings of building site equipment for different construction phases. The goal of the diploma thesis is design right and economical procedure for realization of the building, comply with the safety, quality and ecology conditions.
The Flat-building in Olomouc, Nezval street, civil technological project
Drexler, Michal ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
As the basis of this diploma thesis served a project of a flat house in Nezvalova Street. This flat house is designed as 7 floors high building with undergrounds garages and commercial space in the ground floor. Foundation of this building is done using reinforced concrete pilots, continued by monolithic reinforced concrete scelet. Both circumferential casing and internal walls are built using ceramic concrete blocks Porotherm, on top of which is a layer contact insulation system from EPS. Roofing of this building is done using asphalt bands into flat roof; one part of the roof is designed as “green roof” and is covered by soil substrate. This diploma thesis covers building technology preparation of construction. It includes time schedule of construction, accessibility to the building site, technical report and blueprints of building site equipment, risk plan, draft of main tools and processes for construction, instructions on how to use housing units. The main aim of this diploma thesis is around building a monolithicreinforced concrete scelet, for which a technological manual was created, control and probationary plan and blueprints of formwork for vertical and horizontal constructions. Additionally this thesis covers roofing using flat roof and asphalt belts.
Omega Sport Olomouc - Sport and Health Center, civil technological project.
Bartoněk, Vratislav ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The master's thesis is elaborated on the basis of the project of the Sport and Health Center Olomouc. The project consists of two main buildings – the object of NH Hotel and the Sports Center Omega. The hotel also includes a conference center with three conference halls and covered parking. The object of Omega Sports Center is composed of sports halls for squash, badminton and tennis, along with changing rooms, wellness area and operational background of the object itself. The sports center also incorporates outdoor tennis courts and an underground tunnel connecting the Omega center and the NH Hotel. This thesis deals with the civil technological project of the building site and involves mainly the technical report of civil technological project, the study of realization of the main technological stages of the building object, the project of organization of construction, time schedule of aforementioned two main buildings, the technological standard with test and execution plans for the execution of underground construction by the impermeable concrete technology and for execution of variant solution of tennis hall roofing. Further, a comparison of the alternative roofing technology with current used roofing technology is performed, including the drawing documentation of new roofing alternative.
Realization of the Substructure of Residential Building in Znojmo
Kousal, Tomáš ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The content of the bachelor thesis is a conception of a technological stage of the substructure of residential building in Znojmo. The building is built on a large diameter bored piles which are connected to a slab foundation. In the places of a higher load, there are projected foundation pads. The project includes technological regulations for earthwork, bored piles and slab foundation. Furthermore, the thesis covers topics of inspection and check plan, mechanical assembly and budget. The thesis also deals with building site equipment, shedule, block plan and work safety.
Completion of chateau Návojná – Multi - functional building, implementation of finishing processes
Vaněk, Josef ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The content of the thesis is the solution the technological stages of finishing works new multifunctional building in the village Návojná. The work focuses on the implementation of floor construction and contact thermal insulation system. The work includes a technical report, technological situation, the organization of the construction, plan work safety and time schedule. Further technological regulations of selected construction processes, inspection and test plan, inventory of machines, bill of quantities and selected details of construction solutions.
Training Centre in Zlín, technological phase shell construction
Výstup, Petr ; Henková, Svatava (referee) ; Vlčková, Jitka Laura (advisor)
The Bacherol theses objective is conception of the technological phase of upper shell building of the training centre in Zlin which is supposed to serve for research and training of workers who are involved in thermal construction engineering branch. The work describes the shell building realization which is built of a lot of different materials if we consider the small size of the construction. Technological report, machinery list, wider relation situation, building site equipment with on record drawings, work safety, check and test plan, partial budget and schedule of construction are included.
Technological stage of finishing works of apartment building ".
Patočka, Bronislav ; Čech, David (referee) ; Henková, Svatava (advisor)
This bachelor thesis deals with the technological stage of realization of roof cladding and gutter system of a housing building. This building is situated in a gap site of urban development in Františkovy Lázně. For the roofing, seam roofing made of aluminum sheet metal roll was used. There is a gable roof with dormer-windows at both sides of the roof. For all the conducted tinsmith work including horizontal dormer walls sheathing and attachment of the building to adjacent buildings, aluminum sheet metal was used. A part of finishing tinsmith work is also realization of gutter system which is designed to be made of the same material from the same producer as the roof cladding. Gutter attachment is done by means of assembling polystyrene rollers into façade system of ETICS which ensure thermal bridges’ break.

National Repository of Grey Literature : 63 records found   beginprevious54 - 63  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.