Realization of the rough construction of a residential building in Brno
Matěj, Kryštof ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The subject of the Bachelor Thesis is the technological stage of the superstructure carcass of an apartment house in Brno. For this stage, the following documents have been worked out: the construction progress schedule, the item budget with the bill of quantities, the technical report and the drawings of the site plant, the technological regulation, the assessment of transport routes, the design of the machine setup, the inspection and test plan, and the occupational safety.
Extension and construction modifications of the F2 production hall in Hodonice - construction technology project
Laga, Radim ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the development of a complex construction technology project for the realization of three additions to the existing production hall. The work aims at the optimal choice of intertwining the temporal, spatial and technological structure of the construction process in such a way that the work is completed on time, at a pre-agreed price and in the required quality.
Multifunctional building - Houbalova - construction technology project
Ševčík, Jan ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The subject of this thesis is the solution of building technology project poly-functional complex with a focus on execution of construction. Gross building is designed reinforced concrete skeleton combined with masonry. Technology will be developed Code for reinforced concrete monolithic frame and masonry. On the techno-logical stage it will be processed inspection and test plan and the balance of the major sources for the implementation of reinforced concrete structures 1.NP. The thesis is a proposal for construction site, which is complemented by a social facilities and offices. For an overall view of the construction of a multifunctional complex is processed time and financial plan, which will be further elaborated for building construction B. Availability of supply is verified by the design of routes. Like other task will be processed proposal formwork system for con-struction 1.NP Building B.
CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING POLYFUNCTIONAL HOUSE IN OPUSTENA STREET, BRNO
Dražilová, Michaela ; Šlanhof, Jiří (referee) ; Mohapl, Martin (advisor)
Project of master thesis solves brand new residential polyfunctional house with bike shop. The main object is a four-storyed, designed as a monolithic skeleton construction. The building is located in Opuštěná Street, Brno. The project is developed on the basis of project documentation and technical data, delivered by the designer in the behalf of investor requirements. Main goal of this project seeks to approach to real solution of the construction site. It is very important to compare also financial aspects, not only the technological. Last but not least, time requirements of construction plan and factual requirements of the customer. Constructive-technological project contains especially: technical report, site facilities, technologic regulation, schedule, financial budget, control and test plan, design of machinery, safety and health protection etc.
New building log cabin object in Malenovice, rough superstructure
Jůnová, Lucie ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
The bachelor’s thesis is focused on the construction of log house. Solves realization of rough superstructure. It is a single-storey building with an attic. The building is designed mostly from log construction and partly brick with wood-beamed ceilings, roofed a gable roof. The work includes technical report, technological regulation for vertical construction, ceiling and roof truss, design a construction site installations including construction organization, time schedule, design mechanical assembly, control and test plan, health and safety at work.
Preparation for rough superstructure accommodation pavilion in Brno
Šenk, Marek ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The bachelor thesis deals with the construction technological solution of the rough top structure of the accommodation pavilion in Brno on Veslařská street. For the given technological phase a time schedule for construction, an itemized budget with a statement of dimensions, a technical report and drawings of the construction site equipment, a technological regulation, assessment of transport routes, design of the main machines and mechanisms, a control and test plan, security risks and their prevention are elaborated. The last chapter deals with the comparison of 3 possible options in terms of financial, time and thermal technical assessment.
Realization of the rough construction of a residential building in Brno
Matěj, Kryštof ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The subject of the Bachelor Thesis is the technological stage of the superstructure carcass of an apartment house in Brno. For this stage, the following documents have been worked out: the construction progress schedule, the item budget with the bill of quantities, the technical report and the drawings of the site plant, the technological regulation, the assessment of transport routes, the design of the machine setup, the inspection and test plan, and the occupational safety.
Preparation for rough superstructure accommodation pavilion in Brno
Šenk, Marek ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The bachelor thesis deals with the construction technological solution of the rough top structure of the accommodation pavilion in Brno on Veslařská street. For the given technological phase a time schedule for construction, an itemized budget with a statement of dimensions, a technical report and drawings of the construction site equipment, a technological regulation, assessment of transport routes, design of the main machines and mechanisms, a control and test plan, security risks and their prevention are elaborated. The last chapter deals with the comparison of 3 possible options in terms of financial, time and thermal technical assessment.
Multifunctional building - Houbalova - construction technology project
Ševčík, Jan ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The subject of this thesis is the solution of building technology project poly-functional complex with a focus on execution of construction. Gross building is designed reinforced concrete skeleton combined with masonry. Technology will be developed Code for reinforced concrete monolithic frame and masonry. On the techno-logical stage it will be processed inspection and test plan and the balance of the major sources for the implementation of reinforced concrete structures 1.NP. The thesis is a proposal for construction site, which is complemented by a social facilities and offices. For an overall view of the construction of a multifunctional complex is processed time and financial plan, which will be further elaborated for building construction B. Availability of supply is verified by the design of routes. Like other task will be processed proposal formwork system for con-struction 1.NP Building B.
CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING POLYFUNCTIONAL HOUSE IN OPUSTENA STREET, BRNO
Dražilová, Michaela ; Šlanhof, Jiří (referee) ; Mohapl, Martin (advisor)
Project of master thesis solves brand new residential polyfunctional house with bike shop. The main object is a four-storyed, designed as a monolithic skeleton construction. The building is located in Opuštěná Street, Brno. The project is developed on the basis of project documentation and technical data, delivered by the designer in the behalf of investor requirements. Main goal of this project seeks to approach to real solution of the construction site. It is very important to compare also financial aspects, not only the technological. Last but not least, time requirements of construction plan and factual requirements of the customer. Constructive-technological project contains especially: technical report, site facilities, technologic regulation, schedule, financial budget, control and test plan, design of machinery, safety and health protection etc.