National Repository of Grey Literature 286 records found  beginprevious119 - 128nextend  jump to record: Search took 0.01 seconds. 
Realization of the outer casing of the production facility in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
This bachelor thesis focuses on the technological stage of cladding of the production hall in Hodějice. Sandwich panels BalexMetal were chosen for the cladding. Roof is flat and supported by trapezoidal metal sheets. External coat is hydroisolation foil Fatrafol. Technological regulations, assessment of transport itineraries, costing and the bill of quantities, work schedule, technical report for site equipment, plan of a machine assembly, control and test plan, safety and health care policy were prepared for this stage. In the last chapter, several options of the cladding are compared and, in the end, sandvich panels BalexMetal were chosen as being the most suitable option.
Central Fire Station in Hradec Kralove - Construction technology project
Malina, Marek ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The diploma thesis deals with the formation of a constructive-technological project for the building of the Central Fire Station in Hradec Králové - 1. Phase. The building consists of five floors and one underground. The aim of the thesis is to choose and process suitable solution of the building in terms of financial, time and technical requirements based on the project documentation provided by the designer. The thesis deals with the time and financial plan of the construction, the design of the main machines and mechanisms, the planning of the material supply and its transport routes, the design of the construction site equipment, the technological regulations, the control and testing plan for the monolithic and steel constructions of the building and the time schedule of the building with the technological norm.
Reconstruction of the Janeček mill
Owczarzy, Denis ; Venkrbec, Václav (referee) ; Utíkalová, Ivana (advisor)
The task of this diploma thesis was the development of construction documents for the implementation of project, icluding project specialization. This is a rebuilding of the existing mill and it´s conversion to the object. Proposed reconstruction is solved with a sense of highlighting the exist building and expressing his dominance and function in an environment, where the building is located. From the original state was preserved only main building in historical style, and in contrast to this building were proposed two smaller objects with the background. The object is used as a pension for the accommodation for persons, restaurant and also provides rooms for seminars and meetings. Due to a brooklet flowing in front of the building and location of pension between the spa´s and city parks is the use of this building more than suitable.
Construction technology project of Retirement Home Brno - Tuřany
Rapant, Radek ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
The thesis is elaborated on the basis of project of the retirement home Brno – Tuřany. The thesis is focused on building technology solutions of construction of the retirement home Brno – Tuřany. The main part of the thesis deals with realization of rough construction DCI, especially with detailed description and draft solution for making the ceilings and elliptical reinforced concrete staircase (tube). Apart from the impressive architectonic draft solution of main staircase of the building, it will be interesting to deal with progress of the whole construction that is divided into three dilatational parts.
Realization of a apartment building in Brno - construction technology project
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
Construction technology project for a hotel in Giant Mountains
Pozler, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves processing of documents for realization of hotel construction in Špindlerův Mlýn. The work contains technical report, coordination situation, time and financial plan of construction, construction technology study, project of construction site equipment, design of construction machinery, plan of material resources, technological regulation for truss realization, plumbing and roofing, control and testing plan protection of health at work, playground project.
Execution of Building Construction Phase - Extension of Former Tower Silo in Olomouc
Ráb, Jakub ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of my bachelor thesis is construction technological solution of the rough upper construction realization of the extension of former tower silo in Olomouc. The work includes technical report object, facilities of construction zone, solving traffic routes from the production to the place of construction, technological specification for prefabricated and monolithic reinforced concrete constructions, the most appropriate machine assembly, the most appropriate machines assembly, schedule of work, itemized budget, control and test plan and safety and Health protection during work.
SPORTS RELAXING CENTRUM Nový Lískovec-SELECTED PARTS OF THE CTP
Venkrbec, Václav ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The master's thesis is solving a build-up technology of a polyfunctional building construction with a badminton hall. It is a prefabricated skeleton in combination with ceramic walls.
Realization of the perimeter of the apartment building in Hranice
Rudolfová, Michaela ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The aim of this bachelor thesis is to design and delineate the execution of the works on the building shell of an apartment block in Hranice. The bachelor thesis describes the implementation of waterproofing of external walls and their insulation. The thesis will include technical report, technological regulations of selected works, control and test plans, list of machines, technical report of the construction site equipment, coordination of safety and health at work, time schedule, situational drawing, budget and assessment of thermal and technical properties of external walls.
Selected parts of Construction-Technological Project - LOGISTICS CENTER HEMAT
Valouch, Ondřej ; Venkrbec, Václav (referee) ; Čech, David (advisor)
The subject of my thesis are selected parts of construction technology project – construction of the logistics center Hemat in Ostrava. This thesis solves technological regulations for foundations and installation of the main steel structure. It also includes a technical report, technical report site equipment, suitable choice of construction machinery, timetables, itemized budget, inspection and test plan, occupational safety, dealing with traffic routes, situation of site equipment.

National Repository of Grey Literature : 286 records found   beginprevious119 - 128nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.