National Repository of Grey Literature 297 records found  beginprevious288 - 297  jump to record: Search took 0.00 seconds. 
The company premises SIWE, assembly gross superstructure production hall
Drexler, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with the technological phase of implementing the upper shell construction of a factory building. The main supporting element is a prefabricated reinforced concrete frame, with a peripheral shell of bricks POROTHERM insulated using contact system ETICS. The roof structure is not part of this thesis. This document includes: inventory of quantities, budget, schedule, technical regulations, organizational principles of construction and a comparison of the methods and implementations of two insulation technologies.
Residential complex New Dukla technological phase substructure construction
Záleský, Martin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the bachelor's thesis is focused on the constructionally technological project of substructure of residential house Nová Dukla, Ústí nad Orlicí. The project contains the technological instructions for earthworks, large diameter bored piles and monolithic base grid. The project deals with the quality control of works that are carried out, their schedule and financial evaluation, suggestion on mechanical assembly and minor mechanization for performance of substructure constructions of residential house. Subsequently, occupational safety and health, organization of construction and suggestion on arrangement of building site are stated in project.
Residential house Rakovnik, technological phase roofing
Procházka, Václav ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with building technology stage roof of a residential building in Rakovník. It deals with the supporting structure of the roof, attic insulation, plumbing and roofing elements. The work includes technical regulations, bills of quantities, schedule, drawings and other technical documentation in stages.
Pension PREMIER in Janov nad Nisou, implementation of finishing works
Pavlíková, Jana ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
In the bachelor thesis I have dealt with finishing work on the top, where I focused on making plaster Hasit and construction of sauna. Plasters are made manually from before-spraying, the core of plaster and final stucco plaster. The construction of sauna lies in the design of the squared timbers. Insulation - PU boards is located among them. The final surface is made use of floorboards, which are made from Scandinavian spruce. The object for which I work processed, is located in a secluded spot in the village called Janov nad Nisou. This is of the changes to the existing layout pension Premier and his extension. As part of my bachelor thesis I'm dealing with technological stage on both objects at the same time.
Research Center of FIT VUT in Brno - solution of rough construction
Malaník, Jan ; Nečasová, Barbora (referee) ; Novotný, Michal (advisor)
This thesis deals with the construction and operation: gross upper structure of the Research Center of Information Technology VUT in Brno. The aim is to detail the process equipment set, the schedule, itemized budget, inspection and test plan, optimal workflow, transport links and site equipment.
Autosalon TOPCENTRUM in Hodonín, implementation of carcass superstructure
Pecháček, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with a construction technology procedure gross superstructure of a car store TOP CENTRUM car in Hodonín. This object has got 3 floors. One of them is underground and two of them are above-ground. The interest area is located in a flat terrain in industrial zone. Supporting system of the building is formed by steel skeletons and supplemental supporting structure of POROTHERM blocks. Ceilings are formed by prefabricated prestressed reinforced concrete panels and also by steel construction. The roof supporting system is made up by trusses and purlins and aslo by steel beams IPE. The construction and technological study of the gross superstructure includes a technical report, plan of routes, technological instruction of steel vertical supporting system and selected part of roof system, plans of inspections and tests, resolution of the building organization, schedule and budget, machine list and occupational safety.
Manufacturing building in Černá Hora, implementation of carcass superstructure
Hrouzová, Žaneta ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
My bachelor thesis deals with the solution of the technological stage of the montage of the steel construction and also with the roofing of the production hall in Černá Hora. It includes the technological report, the technological regulations, the monitoring and test plan, the project of the construction site facilities, machine set and time frame of the construction.
Perovna Kunvald, implementation of carcass superstructure
Madarászová, Daniela ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis two technological steps carcass superstructure factory springs in Kunvald, as Kunvaldská The building consists of two parts: manufactory and administrative part. Bulding is out of town and will be used year-round. It is a basement building, factory building is on one floor and an office building on two. Construction of factory building is made up of steel I-beams sheathed wall panels Kingspan, office building consists of ceramic bricks Porotherm. Processing stages of technological addresses cladding on the shop floor wall panels Kingspan and the creation of an office building roofs. The flat roof of the office building consists of two parts walkable and nowalkable , will be made to both technological prescription.
Gym in Šlapanice - technological phase rough construction
Inwald, Tomáš ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
Technological phase of construction site gym in Šlapanice in elementary school. Work processes facade scaffolding installation procedure, pulling the existing large-scale windows, interior construction demolition work in the background gyms, mason new internal walls and replacement of windows in the envelope.

National Repository of Grey Literature : 297 records found   beginprevious288 - 297  jump to record:
See also: similar author names
1 Nečasová, Berenika
Interested in being notified about new results for this query?
Subscribe to the RSS feed.