National Repository of Grey Literature 286 records found  beginprevious91 - 100nextend  jump to record: Search took 0.02 seconds. 
Execution of Multifunctional Building in Velké Bílovice
Pospíšilová, Izabela ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The thesis is focused on construction technology solution for realization of the construction of a polyfunctional building in Velké Bílovice. Part of the thesis is technical report for construction technology project, time and financial evaluation of selected building as well as the whole project. The thesis contains selected technological regulations of carried out activities, control, and test plans, safety and health protection at work, a design of major building machines and mechanisms, a concept of the construction site or instructions for using the building.
Construction technology study stage of execution upper rough construction of a residential building
Kubíček, Lukáš ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The aim of my thesis is the construction technology study stage of execution upper rougr construction of a residentail in Medlanky. The work involves technical report building equipment, technological instruction for selected activities, inspection and test plans, design of mechanical assemblies, transport links, schedule of health and safety, as well as environmental protection, itemized project budget and timetable.
Outbuilding of polyfunctional spaces for the production hall- construction technology project
Navrátil, Ondřej ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
The subject thesis's topic is the technological implementation of rough upper construction's extension of the company BÖHM's polyfunctional space to technological shop floor located in district Červený Kříž in city of Jihlava. This thesis contains (includes) the implementation of the building's framework made up of ferroconcret and steel construction. The thesis namely includes the solution of the construction site equipment, the situation of the construction with the transport routes solution, the technical report, the technology study of the major technology stages, the bill of quantities and the itemized budget, the suggestion of the main lifting device, the evaluation of the main finance funds for building's construction, the technological instruction, the technical report of the construction site equipment, the schedule of work suggestion of the machine system, the control plan and test plan.
The technological phase of gross upper structure - Sport and relaxation center Nová Paka
Malina, Marek ; Čech, David (referee) ; Venkrbec, Václav (advisor)
The subject of this thesis is the stage of the upper part of the rough construction for The sport and relaxation centre in Nová Paka. This stage includes four different technological methods of implementation – walling of the supporting and non-supporting structures, horizontal reinforced concrete ceiling construction, vertical reinforced concrete wall and prebuilt steel construction. The thesis contains the general technical report of the object, the technological regulation of the stage, the technological report of the construction site´s equipment, mechanical assembly design, control and test plan for individual procedures, occupational safety and health, bill of quantities, budget and time schedule.
Construction technology project of the apartment building in Velká Bíteš
Sotolář, Václav ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of this final thesis is the construction technology project of an apartment building in Velká Bíteš. The thesis contains a technical reports, construction technology study, coordination situation, time schedule and financial plan of the building in the structure of individual construction object, time schedule of the main building, solution of transport routes, technological regulation for the ventilated facade, control and test plan of the ventilated facade. Furthermore, a design of the construction site equipment is prepared, including a technical report, Occupational Health and Safety on the construction site for the superstructure construction phase, budget for the superstructure construction phase and a comparison of variants of the ceiling structure. Finally, a comparison of lifting mechanisms, LEED certification and assessment of photovoltaic facades is processed.
CONSTRUCTION-TECHNOLOGY PROJECT OF BRIDGE DEMOLITION AND BRIDGE CONSTRUCTION
Hofírek, Radovan ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This diploma thesis deals with the demolition of a bridge located at the D1 motorway from Prague to Brno. The bridge no longer meets the load and width requirements of today´s standards. The thesis also deals with the construction of a new bridge, which will be expanded into D28/120 category. This expansion will allow for provisory use of the carriageways of one half of the motorway in both directions. The whole reconstruction is very time consuming that is the reason the new bridge is made of prefabricated pre-tensioned girders with a composite bridge deck. This can save time and the new bridge can be open for service in a shorter period of time.
Construction-technological project of the residential building Rezidence na Plachtě
Halík, Tomáš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
This master thesis deals with construction technology project of the residential building Rezidence na Plachtě. This building is in Hradec Králové. A technical report is prepared for the construction project, time and financial plan of the construction, a feasibility study of the main technological phases, proposal of the main building machines and mechanisms, schedule of the main object, technological regulations for the implementation of monolithic ceilings by means of a control and test plan. The budget of the main building was prepared as part of the other assignment, calculation according to THU and an economic balance sheet for RC ceiling above the 1st floor. Finally, an assessment of critical surface temperatures was performed.
Manufacturing hall Lysá nad Labem - construction technology project
Bechyně, Petr ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
This thesis deals with the progress in the construction of the manufacturing hall in Lysa nad Labem. Mainly focuses on the technological phase of mounting reinforced concrete frame which is processed technological prescription too. There are also chapters dealt with elements of site facilities, transport relations, machine mechanisms, inspection and controling plan, or ecology and health and safety.
Realization of the rough construction of a residential building in Bratislava
Coník, Šimon ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The aim of the bachelor thesis is to solve the stage of the superstructure of the apartment building in Bratislava. The content of the bachelor thesis is a summary technical report of the building-technological project, resolving traffic routes to the construction site, design of site equipment and machinery assembly, elaboration of technological regulations and control test plans for vertical masonry and monolithic horizontal structures, health and safety at work, time schedule of construction and budget of the technological stage.
Modernization of railway Nové Mesto nad váhom - Púchov, realization of underpasses at railway stations Trenčín - Zlatovce
Bartulíková, Radka ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
Construction-technological studies of realization of the building. Include project of the temporary works, KZP, specifitations budget,time, healt and safety plan of the construction. The project addresses the construction of subways.

National Repository of Grey Literature : 286 records found   beginprevious91 - 100nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.