National Repository of Grey Literature 119 records found  beginprevious61 - 70nextend  jump to record: Search took 0.00 seconds. 
Parking building in Opava - construction technology project
Bernatík, Lukáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The focus of this thesis is dealing with the elaboration of the construction technology project of the parking house in Opava. The thesis contains a technical report, a time schedule and financial plan and a project for construction site equipment for all construction objects. For the main construction object, a construction technology study of the main technological stages, technological regulations for the assembly of the structural steel construction and fiber-reinforced concrete were prepared. For these topics, inspection and test plans have been devised. The thesis too includes the transportation of machines and materials to the construction site, the plan for securing material resources, occupational safety, and the itemized budget.
Construction technological project of the production hall in Sudoměřice
Kolacia, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
Analysis of errors in construction budgets
Kadaníková, Nela ; Tuscher, Martin (referee) ; Biolek, Vojtěch (advisor)
The master’s thesis describes the problematics of construction budget errors. Based on the research and the survey among investors, designers and contractors, methodology changes are designed for a specific company in order to decrease its impact on stakeholders’ expenses, construction time and quality of the building.
Analysis of the list of quantities, supplies and services for public procurement
Petláková, Lenka ; Výskala, Miloslav (referee) ; Aigel, Petr (advisor)
The diploma thesis concerns with public procurements of transport constructions in the South Moravian Region. The work is focused on the analysis of the bill of quantities selected public procurement, which consists in observance regulation No. 169/2016 Coll., of the determining the scope of documentation of public procurement and the bill of quantities, supplies and services with a bill of quantities. The conclusion of the thesis deals with the evaluation of the analysis and it focuses on the cause and effect of deficiencies in bill of quantities.
Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno
Kozla, Dávid ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory
Štěpánek, Michal ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
Construction-technological project of Ayurvedic pavilion in Počátky
Lisý, Ondřej ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The diploma thesis deals with realization of an Ayurvedic pavilion in the premises of Saint Katerina Resort. The proposed new compound is designed to extend the leisure services of the Saint Katerina Resort in Počátky. The feasibility study of the main technological stages of the project is solved in this diploma thesis. The construction of the object is described in the technical report. Both a detailed itemized budget of the construction and a detailed timetable to show the duration of each process is elaborated for the construction technology project. Futhermore, the design of site construction equipment, design of machine assembly, time deployment of machines and staff balance is elaborated. The project includes a technological regulation of the realization of the skeleton supporting frame structure and both control and test schedule. The work safety for the assembly of the wooden building supporting frame is composed.
Selected Parts of the Construction Technology Project of the Psychiatric Clinic of the University Hospital Brno
Drozd, Michal ; Pražáková, Jana (referee) ; Mohapl, Martin (advisor)
The subject of my diploma thesis are selected parts of the construction technology project of the psychiatric clinic of the University Hospital Brno based on the provided project documentation. It is an extension of a new six-storey building to the existing buildings. The thesis contains a technical report to the construction technology project, the coordination situation of the construction, the situation of wider transport routes, time and financial plan by objects, study of the realization of the main technological stages, a site equipment design, a design of a machine set, technological regulation for monolithic structures, quality control and testing plan of monolithic structures, noise study and selected documents for LEED certification.
Analysis of the possibilities of linking building and economic software and software for technical drawing
Domanský, Vojtěch ; Aigel, Petr (referee) ; Výskala, Miloslav (advisor)
The main topic of the thesis is the analysis of the possibilities of linking building and economic software and software for technical drawing, in which BIM models are created, in order to achieve automatization of BIM model budgeting. The introductory, theoretical part defines the area of solved problematics in a broader background and the context of the problem. The overarching theme is BIM. Therefore, the basics and principles of this method, its fundamental aspects and current implementation within the Czech Republic are solved. The following chapters deal with standard budgeting procedures in the Czech construction market. The specifics of classical methods and their shortcomings in the context of contemporary construction are described. In the following part of the thesis the BIM budgeting concept, its vision and related aspects are discussed in more detail. The actual draft of the solution of interconnection of price systems and software, in which the BIM model is created, with orientation on valuation automation, is presented in the final, practical part of this thesis. Requirements for solution are defined and the procedure of its creation is described. Finally, the solution is tested and evaluated.
Realization of Roofing of Multifunctional House in Brumov
Šánek, Adam ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The bachelor thesis deals with the roofing of a multifunctional house in Brumov-Bylnice. It is the processing of technological regulations for carpentry and plumbing. The content of the thesis is a technical report focusing on the given technological stages, solution of traffic relations, statement of measurements, technological regulation for carpentry and plumbing, solution of construction organization including situation, time schedule, design of machine assembly, inspection and test plan, solving the difficult construction details of the roof truss.

National Repository of Grey Literature : 119 records found   beginprevious61 - 70nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.