Silage trough Litkovice - construction and technology study
Zadák, Petr ; Krejčí, Michal (referee) ; Vlčková, Jitka Laura (advisor)
The Bachelor thesis deals with the construction and technology studies of the silage trough in Litkovice village. For this specific construction project will be primarily compiled a technology study of the main technological stages implementation, a technical and case report, principles of construction organization, a construction site technical report, a technological regulativ for concrete sump, health and safety regulatives at a construction site, a inspection and test plan for concreting the sump wall, a construction project time-schedule, a budget for both projects - SO01 silage trough and SO02 sump.
Technological stage of assembly load-bearning construction of building of secondary school
Tacina, Marek ; Bravenec, Roman (referee) ; Diaz, Yvetta (advisor)
The subject of this thesis is the design of the supporting frame structures in MS-OB. Construction is divided into two phases - red and blue. Blue phase focuses on the objects A, B1, B2 and red stage focuses on objects C1, C2, D1, D2, D3. In this work it is addressed, through a technical report, the situation of buildings, building equipment, budget, schedule, technological progress in construction, design of mechanical assemblies, KZP and Safety solved the technological stage.
The gross superstructure of the apartment building
Hoferek, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
This bachelor’s work deals with the realization of the rough upper construction of the appartment block. The aim was to elaborate the technological regulations, to specify the mechanization for the set technological phase, the occupational safety, the quality of the implementation and the total duration of the phase of the rough upper construction with respect to the economic point of view. The basis for the development of the project was the partial implementing documentation of the building.
Trade house in Hodonin - solution of ceiling phase
Šrámek, Pavel ; Hanzelková, Martina (referee) ; Novotný, Michal (advisor)
The aim of this work is to prepare technology project for the construction phase of new ceiling of trade house. The ceiling is made up of the 1.PP and above the elevator shaft monolithic reinforced concrete structures, and over 1.NP and 2.NP it consists of prestressed precast panels with the casting of Spiroll. The work documents are necessary, with the implementation of this phase. In particular, the technological specification, budget, schedule, design of mechanical assembly, inspection and test plan, a description of the site facilities, and documentation to the assembly formwork.
SUBSTRUCTURE OF A POLYFUNCTIONAL BUILDING ČESKÁ SKALICE
Výborný, Václav ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The main contents of the thesis is solving a construction-technological project substructure of a polyfunctional building Česká Skalice. Substructure is based on two height levels on bored piles. The first height level is called SECTION A, the second height level is called SECTION B. The base structure consists an angled base plate, which consists from two horizontal plates shifted against each other about one floor and between plates is a basement wall. The base plate in SECTION A is solved together with ceiling plate 1. PP. Further there is solved structures for two lift shafts . The thesis includes a technical report, technologic instructions, plan of building site, selected constructional details, cost estimate, schedule, machinery composition, control and testing plans, safety at work and environmental protection.
Gross superstructure of a residential building
Duda, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
The main construction work is subject to technological solution vertical and horizontal constructions of residential building in Opava. Bachelor's thesis solves construction progress itself, used technologies and ensuring required conditions for safe and stepless constructing. The basis for the development of the project was the partial implementing documentation of the building.
Administrative building of company Energis, Hradec Králové - technological stage of sheathed
Findejs, Lukáš ; Selník, Petr (referee) ; Novotný, Michal (advisor)
This thesis is focused on comparing the two variants sheathed and installation of metal ventilated façade and installation of insulation Kingspan. The thesis deals technologically provisions installation, design of mechanical assemblies for mounting cladding to organization, including technical report building equipment and drawing of the building equipment, quality requirements for individual variations cladding and safety and health at work, including developing a plan of risks.
Bearing construction and roofing for production warehouse complex Lena-toys in Dolní Benešov
Wrana, Lukáš ; Selník, Petr (referee) ; Mohapl, Martin (advisor)
The theme of this bachelor thesis is the building technology solution of bearing construction and roofing for production warehouse complex Lena – toys in Dolní Benešov. The content of this bachelor thesis is the technological process of assembly of the building bearing construction and roofing of prefabricated reinforced concrete elements, the budget, the inspection and the test plan, the issue of safety and protection of health at the construction site, the mechanical assembly, the schedule of construction and economic assessment of lifting mechanisms.
Financing of Building Order from the Aspect of Supplier
Krol, David ; Grohman, Jan (referee) ; Hroníková, Marta (advisor)
This thesis deals with the financing contract from a practical point of view. The aim of this work is to describe the possibilities of financial security building contracts from the perspective of the supplier. In the theoretical part are characterized by basic concepts related to the topic and a practical part of the thesis describes the public works. The practical part of the procurement documents to obtain the tender and subsequent recording contract for work. The example of the practice was described the process of financing construction of the contractor. The work shows a significant difference between planned and actual funding process.
Autosalon TOPCENTRUM in Hodonín, implementation of carcass superstructure
Pecháček, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with a construction technology procedure gross superstructure of a car store TOP CENTRUM car in Hodonín. This object has got 3 floors. One of them is underground and two of them are above-ground. The interest area is located in a flat terrain in industrial zone. Supporting system of the building is formed by steel skeletons and supplemental supporting structure of POROTHERM blocks. Ceilings are formed by prefabricated prestressed reinforced concrete panels and also by steel construction. The roof supporting system is made up by trusses and purlins and aslo by steel beams IPE. The construction and technological study of the gross superstructure includes a technical report, plan of routes, technological instruction of steel vertical supporting system and selected part of roof system, plans of inspections and tests, resolution of the building organization, schedule and budget, machine list and occupational safety.