National Repository of Grey Literature 529 records found  beginprevious497 - 506nextend  jump to record: Search took 0.00 seconds. 
Noise and vibrations in air-conditioning systems
Libřický, Stanislav ; Hejčík, Jiří (referee) ; Jedelský, Jan (advisor)
This bachelor’s thesis is focused on the sources of noise in air-conditioning equipment and potential noise reduction. The thesis also includes a detailed list of the sources of noise. Thoroughly describes only the main ones, which the fans, aerodynamic noise of air conduit and chillers. The thesis continues with description of methods of the reduction of selected causes of noise in a certain environment. The final part of the bachelor’s thesis includes listing and description of laws and regulations affecting issue of noise in air-conditioning equipment.
Effective use of 3D Cad systems in the field of process engineering-III
Hájek, Zdeněk ; Dvořák, Radek (referee) ; Pavlas, Martin (advisor)
The thesis is concentrated on point of effective use of 3D CAD system SolidWorks in process engineering. This system is able to use for pipe systems besides its commonly expanded support in standard mechanical engineering. The aim is to create the library of standard parts and to create data for teaching SolidWorks in process engineering. Data are created in text form and in video form as instructing videos. The first part of the thesis contains the description of SolidWorks system, all its functions and modules. The second part contains the description of right procedures of individual parts, assemblies and drawing documentations creation. We aimed on conversion of circle-square air-conditioning pipe and flanges. The evaluation of all points of issue is mentioned in the conclusion.
Air heating in the sport hall
Janková, Martina ; Ell, Jiří (referee) ; Rubina, Aleš (advisor)
The main goal of the bachelor’s thesis „name“ is designing an air conditioning device for a sport hall and its social facilities. A solution must fulfill functional, hygienic and operational requirements for the specific microclimate of sport halls. The device is designed to cover heat losses in winter as well as for cool down heat gains during summer. At the beginning a microbiological and an aerosol microclimate in an air conditioning are considered. In the next part of the thesis the required performance of the device is calculated. In the third part is the documentation of both devices is attached.
Air-conditioning for kindergarten
Horina, Petr ; Šikula, Ondřej (referee) ; Rubinová, Olga (advisor)
This bachelor thesis deals with the project of ventilation system for the nursery school. The ventilation system provides that the fresh altered air is routed in and the used air out. By this compulsory ventilation, a required microclimate is reached, both in the classes and the kitchen which is also placed in the nursery school building.
HVAC system design for a public swimming pool
Mishuk, Aliaksandra ; Blasinski, Petr (referee) ; Rubinová, Olga (advisor)
This barchelor thesis deals with HVAC system design for a wellness center. The project was designed for the two main parts of the builiding – the gym (including neighboring rooms) and the swimming pool. These HVAC systems provide mechanical ventilation in the living spaces and adjust the supplied air on it’s temperature and humidity level, as it’s required for the comfort of the microclimate.
Aircondition of sport club
Valkovič, Michal ; Rubinová, Olga (referee) ; Uher, Pavel (advisor)
The objective of bachelor thesis is to propose air conditioning for hotel with football pitch. Design is focused on guest rooms and business part of the building. The project includes de-sign of ventilation units with heat recovery, which are supplemented with SPLIT units to smother heat load in summer time.
Aircondition of club
Urban, Ondřej ; Rubinová, Olga (referee) ; Uher, Pavel (advisor)
This bachelor´s thesis deals with the air-conditioning of a club. Its design focuses specifically on sanitary facilities and sports hall. The project of the bachelor thesis covers ventilation units, including heat recovery from a sport hall and outline of displacement ventilation.
HVAC design for burn intensive care unit
Fábian, Martin ; Andrys, Petr (referee) ; Rubina, Aleš (advisor)
The Bachelor’s thesis describes a design of a HVAC unit for a burn intensive care unit and its related nursery rooms. The unit respects all the hygienic, functional and running conditions at this specific indoor microclimate. The main concept of the HVAC unit is to supply the burn intensive care unit with fresh air, which is suitable for a fast recovery after a burn trauma and also to reduce the microbial growth and microbial spreading. The main goal of the Bachelor’s thesis was to design a HVAC unit that will effectively filter the inlet air and that the intensive care unit is built the way, to reduce the microbial spread as much as possible. The air handling units are designed at the calculation part of the Bachelor’s thesis to cover the energy (heat) loss in the winter time and the energy (heat) gains during the summer time. Main function of the air handling unit is to handle filtered fresh air to the hospital. The output of the Bachelor’s thesis is a realization documentation for both air handling units.
Ventilation of family house with swiming pool
Frais, Denis ; Uher, Pavel (referee) ; Rubinová, Olga (advisor)
The Bachelor thesis is focused on the air condition of the family house with the indoor swimming pool. In the thesis the ventilation and the dehumidification of the swimming pool hall, the ventilation of the family house and the cooling of living room with the kitchen is included.
Ventilation in the sports facility
Sedlařík, Jakub ; Bernard, Jiří (referee) ; Rubinová, Olga (advisor)
The bachelor thesis deals with air conditioning sport object. The building is located in Znojmo. The aim was to design three air conditioning equipment for bowling, gym and sanitation. This is the air conditioning and mechanical ventilation. In the first part of the theory is mainly focused on selected objects sports facilities and sports centers microclimate. The theoretical part explain the issue halls air heating, radiant heating and air conditioning, and finally its use. After the theoretical part of the calculation follows that addresses the design of the equipment for each room.

National Repository of Grey Literature : 529 records found   beginprevious497 - 506nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.