Construction and technological project of the telescopic covers hall - HESTEGO a.s.
Sigmund, Martin ; Venkrbec, Václav (referee) ; Novotný, Michal (advisor)
The content of this thesis titled "Construction and technological project of the telescopic covers hall" is building - technological solution of building together with technical, time, financial, safety, qualitative, fire and legislative solutions of selected building.
Constructional technologic project of objects at dump Úholičky
Doubek, Rostislav ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
In this diploma thesis two steel frame objects of a waste dump in Úholičky are solved. The aim is to resolve the chosen parts of a construction-technological project. The main topics for selected technological phases are transportation, bill of quantities, technological regulations, construction organization’s principles, time schedule, machinery, control and testing plan, work safety and worker’s health protection. These topics are prepared for the technological phases of ground works, fundamental contruction, upper load-bearing structure, construction of the floor and sheathing of the object. The thesis has also other parts which include static solution of a prestressed unit, budget by items, calculation of the object’s maintenance cost, handbook for bulding’s occupancy and proposal of construction contract.
The community center in the Czech Budejovice - Construction Technology Project
Vondrák, Tomáš ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.
Construction technology project of storage hall
Petrík, Tomáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.
Completion of chateau Návojná – Multi - functional building, implementation of finishing processes
Vaněk, Josef ; Rychtecký, Martin (referee) ; Kovářová, Barbora (advisor)
The content of the thesis is the solution the technological stages of finishing works new multifunctional building in the village Návojná. The work focuses on the implementation of floor construction and contact thermal insulation system. The work includes a technical report, technological situation, the organization of the construction, plan work safety and time schedule. Further technological regulations of selected construction processes, inspection and test plan, inventory of machines, bill of quantities and selected details of construction solutions.
Perovna Kunvald, implementation of carcass superstructure
Madarászová, Daniela ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis two technological steps carcass superstructure factory springs in Kunvald, as Kunvaldská The building consists of two parts: manufactory and administrative part. Bulding is out of town and will be used year-round. It is a basement building, factory building is on one floor and an office building on two. Construction of factory building is made up of steel I-beams sheathed wall panels Kingspan, office building consists of ceramic bricks Porotherm. Processing stages of technological addresses cladding on the shop floor wall panels Kingspan and the creation of an office building roofs. The flat roof of the office building consists of two parts walkable and nowalkable , will be made to both technological prescription.
Preparation of realisation gross superstructure of an apartment block named Francouzská in Brno
Křenková, Kristýna ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with construction technology procedure gross superstructure of an apartment block named Francouzská in Brno. An apartment block has 7 floors. First floor is located partially below ground, becouse lobby area is located in very steep terrain towards the Francouská street. Wing unit is made up of mainly enclosure wall, interior transverse and longitudinal walls of the ceramic blocks Porotherm. Transverse and longitudinal supporting interior walls are produced of sheathing bricks Supertherm, which are located in 1.NP, 2.NP and partially in 3.NP, these blocks are sealed with concrete. Ceilings are designed as continuous strengthened concrete-steel monolithic desks. The staircase is designed as a monolithic reinforced concrete. This construction and technological study of gross superstructure includes technical report, technologic process of concrete-steel monolithic ceiling, plan routes, inspection and test plan, schedule, financial requirements, solution the organization of building up, assembly and machine safety.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Realization of technological steps gross upper building construction of ski facilities in Kouty nad Desnou
Jandová, Renáta ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis concerns two technological phases of roughly build upper building of ski areal in Kouty nad Desnou. The building serves as a dinning and bowling centre. In particular there are three restaurants. The object is located in the centre of the village, under the ski slope. It will be used all over the year ass entertaining centre. The building has one floor bellow and two above the ground. The construction is made like monolithic core structure with Porotherm brick blocks. The individual technological phases focus on the vertical supporting constructions in second floor and monolithic ferroconcrete roof above second floor. In pursuance of second task, the thesis compares financial and time point of view of two technologies of making vertical supporting walls.