Unsymmetrical power flow calculation with the help of software applications
Ermolenko, Ilya ; Koudelka, Jan (referee) ; Vyčítal, Václav (advisor)
This work consists of four parts. The first part of the thesis provides a theoretical introduction to the power flow calculation problem. Furthermore, the analysis of power flow calculation as a linear and as a nonlinear problem is performed. In this thesis, Newton’s iteration method is used in the calculation of the nonlinear problem. The following describes possibilities for improving the power flow calculation by improving the Newton's iteration method and using non-standard methods. The second part describes the possibilities of power flow calculation using various software applications, such as Pandapower, Matpower, OpenDSS and PSS Sincal. In the third part of the thesis the selected software applications tool is used to test the possibility of unsymmetrical power flow calculation in the LV network for the state with and without the PEN conductor, and the calculation of the ground fault in the compensated network. In the fourth part of the work, the unsymmetrical power flow calculation is tested for a larger LV network, further is performed the evaluation of the influence of PEN conductor modeling on the calculation results compared to the calculations of a network without this conductor.
Evaluation of Possibility of New Source Connection With Regard to Nodal Voltage
Němec, Jan ; Topolánek, David (referee) ; Toman, Petr (advisor)
Connection new source of electrical energy into distribution network is important for existing one for reasons its rating and dimensioning. It is even evaluate, whether possibility connection new source in to network is real and do not endanger continuous running distribution system. This work has shown, what conditions are need realize for connection source into distribution network in view of voltage ratio. Next it must incidence harmonic current and affecting centralized telecontrol signal about reasoning. Against a background examination connection source are administrative acts, which forms basis of successful connection. On basis lets request of connection mostly study of connection working up. This study contains concrete calculation and examination individual factors for connection new source. Next put mind to connection wind power station, because wind power stations are very special source for connection into distribution network. Bigger demands are putting on them and stricter examination of connection to site must be done. Because during time unit (day, week and month) they have various strain diagram. Which makes higher straining of distribution and necessity have reserve of electrical energy for case fail wind power station owing to windless ness. In the end, there is referred to practical examination example of possibility connecting. As this example was chosen examination of wind park to 110 kW network with 32 MVA installed power from view of voltage ratio. Solution process is given by replacement of part of given Picells link and by calculation steady state of node site system with Gauss-Seidels iteration method. After that follows evaluation of voltage change in the site before and after connection of source to the network, which can not be higher than 2%. In this example is this condition satisfied and from a view of voltage ratio there is nothing to obstruct for connection new source to network.
Steady state and short-circuit conditions within E.ON 110 kV power network at parallel operation of nodal areas of Čebín substation and Sokolnice substation
Múdry, Peter ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the distribution network 110 kV of E.ON Company there are the nodal areas of Čebin substation and Sokolnice substation which are operated separately at the present time. There is one 400/110 kV transformer for each nodal area. In case of fault on one of these transformers or on busbar in which the set transformer is working, it comes to an outage of electric supply in the set nodal area. This problem has to be solved with help of the parallel operation of nodal areas of Čebín substation and Sokolnice substation. The main and also the practical task of this work is to design the bridge connection appropriate for parallel operation of nodal areas (supply transformers 400/110 kV). With help of a computing program there were made calculations of steady state and short-circuit conditions in distribution network 110 kV for separated and parallel operation of nodal areas. Voltage conditions, load of transformers (400/110 kV and 110/vn kV) and conditions on 110 kV lines are evaluated and controlled as the result of steady state calculations. Based on short-circuit conditions there is controlled the short-circuit resistance of the substations. Finally there are compared advantages and disadvantages of separated and parallel operations of nodal areas. If necessary, technical arrangements required for introduction of parallel operation of nodal areas of Čebín substation and Sokolnice substation will be designed. The theoretical part of the work deals with calculation of steady state with help of iterative methods, namely Newton´s and Gauss-Seidel methods. There are further described the method of calculating short-circuit currents, characteristic values and time behaviours of short-circuit current.
Steady state and short-circuit conditions within E.ON 110 kV power network at operation of new 120 MVA source connected to 110 kV Prostějov substation
Kolář, Pavel ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
Electrical power system is an essential technical system intended to power supply. The power drain is still increasing and it is possible to suppose rising trend in the future. Because of this fact there are installed new power sources into the system, so it is important to know manners and parameters of the electricity supply system as well as the new power sources which we are connecting to the grid. Due to these reasons, the electricity supply system is being simplified and described as the steady state operation with different numerical methods. To dimension a connection of the new power source to the grid, it has to be determined short-circuit conditions too.
Design of reconstruction the part of the LV distribution network including make the creation of Detail Design Documentation
Kubeša, Radek ; Wasserbauer, Vojtěch (referee) ; Bátora, Branislav (advisor)
This master’s thesis deals with problems associated with the design of LV distribution networks. In the theoretical part there are described, legislative requirements for the designer of distribution networks, overwiev of standards in which the designer should have oriented and programs used in practice to create design documentation. In the next part there are given requirements for the detail design documentation. Practical part of master’s thesis is devoted to design of reconstruction of distribution network in the given part of village. Appraisal of existing a newly design distribution network was done by calculating of stady state in the BIZON program. In the last part there is listed design documentation for construction in range for the smooth implementation of the project.
Design of a 22 kV network in the Lipno area after the integration of the new 110/22 kV transformer station
Žižlavský, Jakub ; Koudelka, Jan (referee) ; Ptáček, Michal (advisor)
This diploma thesis deals with the design of a new 110/22 kV substation in Horní Planá. The substation design addresses, for example, the issue of reducing the load of surrounding power lines from 110/22 kV substations, reducing the size of short-circuit ratios in the surrounding system, reliability and continuity of supply, etc. Furthermore, loads of individual outgoing feeders from the surrounding substations are analyzed, in case they will be connected to a new substation. Following this, the work also addresses the related new decay points of the lines, which are determined by calculation and simulation in the Grizzly program. The simulation results could be used to compare the current load status of individual lines and contribute to the assessment of the possible benefits of both the new substation and the implementation of other modern technologies for faster and more efficient measurement and handling during operating and fault conditions.
Unsymmetrical power flow calculation with the help of software applications
Ermolenko, Ilya ; Koudelka, Jan (referee) ; Vyčítal, Václav (advisor)
This work consists of four parts. The first part of the thesis provides a theoretical introduction to the power flow calculation problem. Furthermore, the analysis of power flow calculation as a linear and as a nonlinear problem is performed. In this thesis, Newton’s iteration method is used in the calculation of the nonlinear problem. The following describes possibilities for improving the power flow calculation by improving the Newton's iteration method and using non-standard methods. The second part describes the possibilities of power flow calculation using various software applications, such as Pandapower, Matpower, OpenDSS and PSS Sincal. In the third part of the thesis the selected software applications tool is used to test the possibility of unsymmetrical power flow calculation in the LV network for the state with and without the PEN conductor, and the calculation of the ground fault in the compensated network. In the fourth part of the work, the unsymmetrical power flow calculation is tested for a larger LV network, further is performed the evaluation of the influence of PEN conductor modeling on the calculation results compared to the calculations of a network without this conductor.
Design of reconstruction the part of the LV distribution network including make the creation of Detail Design Documentation
Kubeša, Radek ; Wasserbauer, Vojtěch (referee) ; Bátora, Branislav (advisor)
This master’s thesis deals with problems associated with the design of LV distribution networks. In the theoretical part there are described, legislative requirements for the designer of distribution networks, overwiev of standards in which the designer should have oriented and programs used in practice to create design documentation. In the next part there are given requirements for the detail design documentation. Practical part of master’s thesis is devoted to design of reconstruction of distribution network in the given part of village. Appraisal of existing a newly design distribution network was done by calculating of stady state in the BIZON program. In the last part there is listed design documentation for construction in range for the smooth implementation of the project.
MV netwok design for 75 new houses in Damborice
Makuta, Peter ; Novák, Vojtěch (referee) ; Ptáček, Michal (advisor)
Content of this thesis is medium voltage network design for seventy five houses in Damborice. At the beginning author discuss about history of transmission network and distribution network. Next topic is about steady state of network. In theoretic part are different solving methods of linear and non-linear simultaneous equations discussed. Author describes four methods – method of node voltages, elimination of balance node, Gauss-Seidel and Newton method. The electric properties of both the overhead transmission lines and cable lines and their variety are part of this work too. There is purpose, forms and parameters of transformers described. Simplicity of author’s design should reduce the usage of many electrical elements visible to residents.
Load Flow Calculation and Design of Distance Protection Relay Settings of 110 kV Overhead Line
Jasenský, Filip ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
Bachelor thesis load flow calculation and design of distance protection relay settings of 110 kV overhead line acquaints with the theory calculation of steady operation, short-circuit conditions and a proposal setting the distance protection. The theoretical part is made an example of a simple calculation to show leadership methods of calculation. The practical part is a calculation of steady operation and short-circuit conditions. Short-circuit ratios are calculated for a single operation and parallel operation of transformers in Otrokovice. Calculated using the initial shock symmetrical output from the calculation of short-circuit conditions is verified by short circuit resistance of substations. The practical section setting the distance protection ABB REL 316*4 and compensation earth faults. Calculation of steady state and short-circuit conditions designed basic operational state of the network, for which the design of a distance protection relay settings.