National Repository of Grey Literature 400 records found  beginprevious21 - 30nextend  jump to record: Search took 0.01 seconds. 
The technological stage of understructure construction works of the residential building in Lomnice
Fejfar, Michal ; Štěrba, Martin (referee) ; Venkrbec, Václav (advisor)
The subject of the thesis is the technology of lower construction site of a residential building in Lomnici. This work includes technical report, technological prescription earthworks, technological specification of the foundation works, itemized budget, principles of organization of construction, design of mechanical assemblies, schedule resources balance, inspection and test plan, occupational safety and oversized transport solutions .
PAVILON P OF THE BRNO FAIRGROUND - THE SELECTED PARTS OF THE BUILDING AND TECHNOLOGICAL PROJECT
Matuš, Ondřej ; Šlanhof, Jiří (referee) ; Mohapl, Martin (advisor)
I deal with the constructive technological project about building of pavilion P on the technology side in my masters thesis. The aim is to solve the structure from the aspect of time and financial requirements. I deal in more detail with the project of site equipment, with description the execution of foundation constructions and with construction steelwork.
The Sports and education centre - the rough superstructure
Odehnalová, Jana ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
The subject of this bachelor thesis is the technology of rough upper stage of construction of The Sport and education centre in Petrovice. The building has two floors. Outer and inner walls are made of brick system. Internal pillars and ceilings are monolithic reinforced concrete. The work content is a technological regulation, technical reports, site equipment, mechanical design assembly, budget, timing plan, control and testing plan, work safety and environmental protection.
Realization of Construction of Firehouse in Ždírec nad Doubravou
Kazda, Jiří ; Bříza, Lukáš (referee) ; Mohapl, Martin (advisor)
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infiltration tanks.
Preparation of the implementation of the relaxation center in Moravany
Juříková, Michaela ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The aim of the thesis is to develop a construction technology project for the implementation of a relaxation center in Moravany. The work includes the preparation of a technical report on the construction technology project, the coordination situation of the construction with wider relations of transport routes, the time and financial plan of the construction – object, the study of the implementation of the main technological stages of the construction object and the construction site equipment project. Furthermore, the work deals with the design of the main construction machines and mechanisms, the time schedule of the main construction objects, the plan for securing material resources and technological regulations. Technological regulations are focused on the implementation of a green roof and a ventilated facade. A quality control and test plan was developed for the implementation of the green roof. Last but not least, the work includes a calculation according to THU, an itemized budget of the main building objects, a scheme of the piloting process, an assembly scheme and an OHS plan.
Production Hall with an Administrative Part in Lanškroun, Planning and Implementation of the Construction
Zajíček, Miroslav ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The subject of the thesis is the construction technological planning and implementation of a production hall construction with an administrative part in Lanškroun. The thesis contains a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written.
Apartment House Kasárny E in Uherské Hradiště, Gross Upper Structure
Beníček, Matěj ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The subject of this bachelor thesis is the technological solution of the implementation of the rough upper constructions of the apartment building in Uherské Hradiště. Content pages related to business travel, technology regulations for carrying vertical load-bearing and non-load-bearing walls, machinery design, site equipment solutions, site safety and health protection concepts and inspection and test plan for masonry construction.
Building Construction Project for Industrial and Administrative Building ATX
Šrámek, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also including working drawings.
Selected parts of the construction-technology plan - kindergarten in Brno
Bartek, Petr ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
This thesis deals with a construction-technology plan of two-story nursery school in Brno, district Bystrc. Thesis contains engineering report, financial and time schedule for structures, project of construction site, noise study, technological notes and inspection and test plans for cast-in-place reinforced concrete slabs and for prestressed concrete Spiroll floor slabs, formwork study, list of main machines used during construction, time schedule, needed quantity of workers and itemized budged for carcass, budged for whole building and comparison of cranes. Moreover, in appendices are drawings of approaches and processes during construction in its different phases.
Extension of the gym - preparation and organization of construction
Langrová, Petra ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
The diploma thesis deals with the solution of selected parts of the architectural and technological project of the extension of the gym in Krnov, focusing on realization prefabricated reinformed concrete frame and roof deck. For these technological steps the control and test plan and health and safety will be prepared. For complet object SO 03 the schedule, budget, mechanical assambly, principles and organization of construction will be prepared.

National Repository of Grey Literature : 400 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.