National Repository of Grey Literature 162 records found  beginprevious21 - 30nextend  jump to record: Search took 0.02 seconds. 
The roof structure of a storage area
Kuběna, Kamil ; Sýkora, Karel (referee) ; Puchner, Josef (advisor)
My task was to design and consider the carrier of steel structures for roof storage area in Brno, so that the structure meet all the requirements for buildings and fulfill its function. Roofing, with grand-plan dimensions 50 x 20 m clear height of 4,5 m. Cross sections of the main elements were proposed and considered and also selected joints and details of the structure. Assigned drawings are included in attachments of the thesis.
Implementation of Building Construction Phase - Extension of Apartment Building in Luhačovice
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of bachelor thesis is a realization of extension of the apartment building. This apartment building is located in Luhačovice. The thesis deals with the solution to technological processes of roof trust´s realization with several dormers and roof windows. The thesis also deals with realization of roofing and plumbing work. This thesis contains engeneering report, site equipment, technological regulations, machine set, time schedule of work, budget, control and test plans, construction schemes of roofing.
Realization of roofing of industrial buildings in Ostrava
Mík, Petr ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
The subject of my the solution of technological stage of roofing a trade and to industrial hall in Ostrava. It solves implementation of flat roof of the manufacturing hall. The work includes budget and time frame, inspecting and test plan, technical report, technological regulation and other technical documentation in compliance with assignment.
The Roofing of The Multipurpose Building
Vojta, Radek ; Šmak, Milan (referee) ; Buchta, Stanislav (advisor)
Aim of bachelor thesis was to design and assess timber framework of roofing multipurpose building. The building will be situated in Trebic. Ground plan dimensions of the building are 80.6 × 54.5 m and building height is 17.1 m. The building will have a curved shape with a radius of 30 m. The structure is designed from glued laminated timber, solid timber and steel connecting elements. Substructure will be solved by concrete anchor blocks on foundation strips. The main supporting element are trusses which statically acting as a double-jointed arches. Stability of trusses is securing by purlins together with bracings. Bracings are composed of four fields of cross bracings and longitudinal bracings. Gable walls will consist of columns with braces.
Alternative Solution of Roofing of Residential Building in Brno
Kučerová, Petra ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
Presented bachelor thesis deals with a solution of technological phase concerning roofing of a residential building in Brno. The thesis includes accompanying report and summary technical report, technological regulations focused on mentioned technological phase, proposal of general construction machines, mechanisms and tools. Moreover the thesis includes chapters as technical report of transport solutions, health and safety plan, quality control plan, environment and health plan, budget as well as time plan (construction schedule) of a relevant technological phase. Part of the thesis is focused on an alternative solutions of roofing and their comparison with respect to finances and activity duration.
Manufacturing facility in Písek u Jablunkova - realization of rough top structure
Labaj, Ondřej ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis deals with the realization of the rough top structure of the manufacturing facility for the company Olzanka s.r.o. This work deals with the walling of the building, realization of the semi-mounted ceiling structure and roof truss with tin roofing. For these processes, technological regulations were drafted, machine assemblies were designed, an item budget was drawn up together with a bill of quantities. In addition, an OHS regulation, a control and test plan for the walling process, a time schedule, traffic relations and site equipment drawings were developed.
Brno New Train Station and its Public Spaces
Sedláček, Jakub ; Hybská, Bohumila (referee) ; Sedláček, Michal (advisor)
The topic of the Diploma thesis is a design of the New train station in Brno. The plot is located on the boundary of three city districts – Komárov, Štýřice and Trnitá. This area includes the railway structure for the new train station and also its public spaces, which are very close to the river Svratka. The railway structure is designed as bridge construction, that rises all platforms and rail tracks to 7,65 metres above the ground level. So all of the railways do not become a barrier in the city. The main concept extends a longitudinal axis of the city boulevard through the train station, which creates a high-rise building in the southern part of the plot. This axis is written not only to the layout but also to the roof design. The train station includes two underground levels, ground floor and first floor. Underground levels consist of P+R parking, deliveries only area, technical facilities and subway terminal. The ground floor is the main traffic centre. There is an entrance hall, shopping area, bus terminal and public corridors. The first floor includes platforms for train departures and arrivals. There are also public spaces in the entrance hall. The basic structural system consists of two parts. The first part is a massive reinforced concrete structure of the railway bridge deck and all underground levels. This structure is based on reinforced concrete foundation pads with drilled piles. The second part is a steel frame structure of the roof. That includes steel columns and truss girders for the structure of the lower area. The higher part of the roof is designed as a steel-truss bridge with the characteristic profile. The new train station supposes to create a new gate to the city of Brno, that connects contemporary districts with the historical city center.
Construction Technology Solution Roofing of the Apartment House in Hradec Králové, Nerudova Street
Lebruška, Jakub ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The subject of this work is to create a construction technology solution of a flat roof of an apartment house and an underground garage in Nerudova street in Hradec Králové. It is about execution of warm flat roof of apartment house and intensiv green roof of underground garage. The work includes technical report, a design of a mechanical assembly, site facilities, bill of quantities, solution of wider transport routes, quality requirement, ensure safety, a budget and a time schedule.
Construction technological phase of roofing the building for social housing
Něnička, Roman ; Vlčková, Jitka Laura (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis is describing the constructional phase of roofing a building for a social housing. It deals with the design of the load-bearing structure, installation of roofing elements, laying of roof covering and other parts of the roof. The bachelor thesis consists of covering and summarizing technical report, site plan including its estate road layout, bill of quantitities, technological regulation of a stage and balance of resources. It also delivers organization of construction, equipment of the building site, time schedule, design of the roof assembly and qualitative requirements and safety of work. It also includes a new design of the roofing in the lowered slope of the roof plane.
ASSEMBLY HALL IN PŘÍZŘENICE. IMPLEMENTATION OF ROOFING.
Veselá, Šárka ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The thesis deals with solution of technological stage of roofing of industrial building in Brno Přízřenice. It describes solution of two various types of roofing. The thesis consists of report of the building, suggested construction site installations, proposal of suitable machines and mechanisms required for both stages, further it solves wider relations of transport lines to construction site and occupational safety and health. Also control and test plans, budget and schedule are elaborated for both stages of the building roofing.

National Repository of Grey Literature : 162 records found   beginprevious21 - 30nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.