Steady state and short-circuit conditions in 110kV E.ON network fed from Čebín transformer station
Krutiš, Petr ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
Master’s thesis deals with computation of steady state and short-circuit conditions in 110 kV nodal area of Čebín. The first part of thesis is theoretical. There is described computation of steady state and short-circuit conditions. There is description of 110 kV nodal area of Čebín too. There are made computations in the practical part. Two types of operation of transformers T401 and T402 are evaluated. The transformers operate independent at first, then they are connected in parallel. Voltage conditions in substations, load of lines and transformers, power losses and short-circuit resistance of substations in 110 kV nodal area of Čebín are evaluated based on the computations. There are compared the both types of operation of transformers in the end of practical part.
Steady state and short-circuit conditions within E.ON 110kV power network at parallel operation of transformers T403 and T402 in 400/100kV transformer stations Sokolnice and Otrokovice
Doležal, Marek ; Foltýn,, Daniel (referee) ; Blažek, Vladimír (advisor)
This master’s thesis is divided into two logical parts. The first part contains theory of calculation of steady state and short-circuits conditions within 110 kV distribution network. Newton’s method and short-circuit current calculation is also explained here. It also deals with classification and aftereffects of transient performance occurring in power networks. The second part contains practical calculation of steady flow and short-circuit conditions at parallel operation of transformers T403 and T402 in 400/110 kV transformer stations Sokolnice and Otrokovice. This calculation is done with program used by system operators called SINAUT Spectrum and consequently analyzed. This part also contains brief description of substations from this region.
Steady state and short-circuit conditions within E.ON 110 kV power network at operation of new 120 MVA source connected to 110 kV Prostějov substation
Kolář, Pavel ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
Electrical power system is an essential technical system intended to power supply. The power drain is still increasing and it is possible to suppose rising trend in the future. Because of this fact there are installed new power sources into the system, so it is important to know manners and parameters of the electricity supply system as well as the new power sources which we are connecting to the grid. Due to these reasons, the electricity supply system is being simplified and described as the steady state operation with different numerical methods. To dimension a connection of the new power source to the grid, it has to be determined short-circuit conditions too.
Steady state and short-circuit conditions within E.ON 110 kV power network at parallel operation of nodal areas of Otrokovice substation and Sokolnice substation
Mikulinec, René ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
This thesis deals with the steady operation and short-circuit conditions in the 110 kV network E.ON in a separate and parallel operation of nodal areas of Otrokovice substation and Sokolnice substation. The theoretical part is devoted to the calculation of steady state high-voltage systems using Newton's iterative method, transient phenomena that may occur in the power system short-circuit calculations and theories. The practical part deals with the actual calculations of steady state and short-circuit conditions in a separate and parallel operation of nodal areas Sokolnice-Otrokovice, which were calculated using the dispatching program. These calculations are then evaluated for possible use of involvement in actual operation. At the end there are suggestions on operational measures in the network 110 kV.
Analysis ofelectrical output from the power plat working in the middle of town
Hrubý, Radek ; Brno,, Luděk Ondroušek - Teplárny (referee) ; Matoušek, Antonín (advisor)
The work focuses on outlet of the electrical power from power plants operating in urban areas. After a short analysis of the general possibility of leading out electric power from power plants of various types, thesis continues to describe of outlet electrical power from PPC Červený Mlýn. Subsequently, are calculated short-circuit conditions in the main switching station. It follows an analysis of power lines. The last part dealt with the issue of reliability of sources in connection with random transition processes in the electrical network and the light of the operational reliability of electrical power equipment.
Stabilized operation and short-circuit conditions within E.ON 110kV power network supplied from Otrokovice 110kV switching station, during the period of 2012
Kuba, Petr ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
This thesis deals with steady running and short-circuit conditions in the 110 kV network, E. ON, fed from 110 kV Otrokovice. Substation Otrokovice ensures system transformation from 400 kV to 110 kV system through three transformers. In order to increase reliability of power supply and improved economy is considered to bridge the transition from the operation of two transformers in bridge operations of the three transformers. However, this brings with it significant worsening of short-circuit conditions in the 110 kV network. The task of this work is to evaluate and compare the two variants of operation in terms of steady running and short-circuit conditions in the network at 110 kV and then implement operational and technical measures. The introduction describes the electricity system and its parts. The theoretical part of the paper discusses ways of dealing with steady running and short circuit conditions of long lines. Practical part will deal with applications of knowledge on the network. The conclusion summarizes the most relevant information and the results assessed both variants.
The calculation of 110 kV network distance protection relays setings.
Bartoš, Petr ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
This master’s thesis is about setting of distance protections. The first part is focused on a brief analysis of the basic types of failures and distance protections tripping characteristics and their co-operation with automatic re-turn. The most extensive theoretical chapter is devoted to specific influences that negatively affect the proper operation of distance protections. The practical part is about calculation of symmetrical short-circuit and dissymmetrical short-circuit conditions with consideration of fault resistance and the actual calculation settings of distance protections. Calculations of short-circuit conditions and setting of distance protections are made on a specific part of the network of E.ON in area Prostejov, which is supplied from the substation 400/110 kV Otrokovice.
Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Slavětice 110 kV switching station, during the period of 2011
Nábělek, Ondřej ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the Master Thesis discusses the impact of the bridge connecting the transformer to power system connection to a separate transformers. They were first analyzed the method of calculating the steady operation of the network using the Newton iterative method and the method of calculating short-circuit ratios. It describes the area Slavětice 110kV substation, which is the subject of subsequent calculations. It is also elucidating the function of the bridge connection, advantages and disadvantages. The reason for implementing the bridge operation is to increase the reliability of electricity supply to customers but the major disadvantage is the greater technical and economic performance because increased short circuit current and the need for transmission transformer 400/110kV same type with the same parameters. Point is the practical part, which contains already concrete results taken with the dispatcher software Sinaut. There is a short-circuit resistance compared to short-circuit power substation, then the burden of the elements (transformers, lines) for two specified connection alternatives and four interruptions important elements. Finally, it stated that it can be done with the bridge connection which technical measures. It was discovered that in terms of short-circuit ratios in the present time it is not possible to operate the bridge connection transformers substation Slavětice 110kV and in terms of very different parameters of transformers 400/110kV the operation is not recommended.
Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Čebín 110kV switching station, during the period of 2011
Chrástek, Radim ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
The aim of this thesis is to project an operation of bridge connection in distribution network in Čebín’s nodal area. The main task is to check a fulfilment of voltage tolerance in distribution substations 110 kV, load transformer control (400/110 kV, 110/VN kV), distribution power line 110 kV control and short - circuit conditions control. Relevant calculations are performed by dispatching control system, which works with the actual parameters of all distribution network‘s 110 kV facilities. The theoretical part of this thesis is devoted to the way of the calculation of stabilized operation and the short-circuit conditions. In practical part, first we perform an analyse of stabilized operation and the short-circuit conditions of distribution network 110 kV in actual operation. Next step deals with bridge connection design and analysing its operation. The operation of bridge connection is verificated even in specific conditions (disturbance state, increased load). The next section evaluates the results of the calculations. First we deal with actual operations evaluation and proposed the bridge connection. In the next section we evaluate the operation of the bridge connection in the specific operating conditions. Finally, we evaluate the losses in the distribution network 110 kV. If the calculations of the stabilized operation or the short-circuit conditions of distribution network discovers that some of its elements are overloaded, we propose changes to ensure safe and reliable operation of the distribution network.
Program for the calculation of short - circuit conditions in a power system
Bucholcer, Oto ; Václavík, Vlastimil (referee) ; Blažek, Vladimír (advisor)
This master's thesis consists of three parts. The theoretical part deals with short-circuit conditions in the electricity supply system and with the method of their calculation. The practical part includes the programming process of a programme; description of programme properties and functionality. The third part contains the verification of an accurate programme calculation of the examples.